This document is an attachment to a solicitation for parking lot improvements at Tyndall Air Force Base in Florida. The project is set aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must provide all required proposal information by email to the listed points of contact by 13 March 2023. A pre-proposal site visit will be held on 22 February 2023, with interested firms required to submit names of attendees by 14 February. The work involves improvements to the visitor center parking lot at Tyndall AFB. Questions regarding the solicitation are due by 28 February 2023, with proposals due 13 March 2023. The selected contractor will perform parking lot improvements at Tyndall Air Force Base in Florida for the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Site Visit - Sign In Sheet.pdf PDF
REVISED 01 SOW Repair Parking Lot_EOD BLDG 729_XLWU 23_4011.pdf PDF
REVISED Section L and M_Improve Stormwater Drainage System B729.pdf PDF
Solicitation Amendment FA481923R00060001.pdf PDF
REVISED 02 Appendix A SOW_EOD BLDG 729_XLWU 23_4011.pdf PDF
R0006_B729 Parking Lot_Q and A_Answered.xlsx XLSX spreadsheet
Solicitation - FA481923R0006.pdf PDF
Attachment 4 Appendix D - As-Builts.pdf PDF
Attachment 10 Other Contract Requirements.pdf PDF
Attachment 15 Wage Deter-Highway FL20230158.pdf PDF
Attachment 7 Environmental Protection Plan Guidance.pdf PDF
Attachment 13 Proof of Financial Responsibility.pdf PDF
Attachment 14 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 11 Sample RFI.PDF PDF
Attachment 6 Appendix F - SITE OVERVIEW.pdf PDF
Attachment 1 SOW Repair Parking Lot_B729.pdf PDF
Attachment 5 Appendix E - Z4 Reference Drawings.pdf PDF
Attachment 8 AF Form 66.xlsx XLSX spreadsheet
Attachment 2 SOW Appendix A_Repair Parking Lot_B729.pdf PDF
Attachment 3 Appendix B - LIMITS and (E) UTILITIES.pdf PDF
Attachment 16 3064 - 3065 Progress Schedule.xlsx XLSX spreadsheet
Attachment 12 Base Access Request EAL.xlsx XLSX spreadsheet
Section L and M_ B729 Parking Lot Improvements .pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse) Form Approved OMB No 9000-062 Expires May 31, 2005 Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

SUBMITTAL

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM NO.

SPECIFICATION SECTION/PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-PROVED

DISAP- PROVED

SEE REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

FOR GOVERNMENT USE ONLY

RECOMMEND

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

AF IMT 3000, 20030901, V1 (REVERSE)

11.0.1.20130826.2.901444.899636

To:
From:
Date_1:
Contract_Number:
New:
Resubmittal:
Previous_Contract_Number:
Cell1:
Cell2:
Cell3:
ApprovedCheckBox: 0
DispprovedCheckBox: 0
SeeReverseCheckBox: 0
Initials:
Cell4: 0
Cell4: 0
Cell4: 0
Cell4: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
:
CheckBox1: 0
Cntractr_Date:
Contractor_Name:
Contractor:
Civil_Engineer:
To_Eval:
Contract_Officer:
To_Cntrt_Office:
Base:
Base_Civil:
APPROVED_CHECK: 0
DISAPPROVED_CHECK: 0
TextField1:
SignatureField1:
For_Eval_Action:
TextField2:

File details come from the government source that posted it. Updated .