About this file
From the source
Revised or Additional Attachment
Other files
| File |
Type |
Posted |
| MACC Solicitation Questions Part II.pdf |
PDF |
|
| MACC Solicitation Q A.pdf |
PDF |
|
| Attachment 61 - Bldg 206 Resurfacing.pdf |
PDF |
|
| Attachment 56 - Bldg 206 H208 Area.pdf |
PDF |
|
| Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf |
PDF |
|
| Attachment 41 - Bldg 206 Proposed Roof Plan.pdf |
PDF |
|
| Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf |
PDF |
|
| Attachment 62 - Bldg 206 Roof Plan.pdf |
PDF |
|
| Attachment 55 - Bldg 206 Square Footage.pdf |
PDF |
|
| Attachment 40 - Bldg 206 Existing Roof Plan.pdf |
PDF |
|
| Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf |
PDF |
|
| MACC Conformed Solicitation per Amendment 2.doc |
DOC document |
|
| Attachment 52 - Bldg 206 Floor Plan.pdf |
PDF |
|
| Attachment 59 - Bldg 206 Roll Up Door.pdf |
PDF |
|
| Attachment 60 - Bldg 206 Fire Inspection Reports.pdf |
PDF |
|
| Attachment 38 - Past Performance Questionaire.doc |
DOC document |
|
| MACC Amendment 2.doc |
DOC document |
|
| Attachment 39 - Bldg 206 Roof Location Plan.pdf |
PDF |
|
| Attachment 63 - ETL 07-4 Air Force Carpet Standard.pdf |
PDF |
|
| Attachment 54 - Bldg 206 ADAL Base Warehouse Addition Mechanical Plumbing Plan.pdf |
PDF |
|
| Attachment 58 - Bldg 206 Lead Based Paint Removal.pdf |
PDF |
|
| Attachment 57 - Bldg 206 Layout Asbestos Removal.pdf |
PDF |
|
| Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf |
PDF |
|
| Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf |
PDF |
|
| Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf |
PDF |
|
| Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf |
PDF |
|
| Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf |
PDF |
|
| Attachment 53 - Bldg 206 BRAC Floor Plan.pdf |
PDF |
|
| Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf |
PDF |
|
| Attachment 43 - Bldg 206 As Built Vehicle Area.pdf |
PDF |
|
| Attachment 45 - Bldg 206 As Built Lights and Paint.pdf |
PDF |
|
| MACC Pre-Proposal Conference and Site Visit.pdf |
PDF |
|
| Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf |
PDF |
|
| Agenda for MACC Pre-Proposal Conference and Site Visit.pdf |
PDF |
|
| MACC Solicitation Conformed copy1.doc |
DOC document |
|
| MACC solicitation Amendment.doc |
DOC document |
|
| Pre-Proposal Meeting Site Visit Instructions Revised.pdf |
PDF |
|
| Pre-Proposal Meeting Site Visit Instructions.pdf |
PDF |
|
| Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf |
PDF |
|
| Attachment 15 - Wage Determination-NM9.pdf |
PDF |
|
| Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf |
PDF |
|
| Attachment 38 - Past Performance Questionaire.doc |
DOC document |
|
| Attachment 13 - Wage Determination-NM1.pdf |
PDF |
|
| Attachment 28 - AF Form 3000 Material Approval Submittal.pdf |
PDF |
|
| Attachment 35 - SF 295 Summary Subcontract Report.pdf |
PDF |
|
| Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf |
PDF |
|
| Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf |
PDF |
|
| Attachment 27 - Schedule of Material Submittals.xls |
XLS spreadsheet |
|
| Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf |
PDF |
|
| Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf |
PDF |
|
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .