Attachment_01_Executive_Summary.pdf

PDF 53 KB Posted

Attached to
Multiple Award Construction Contract, Shaw AFB, SC FY13 Federal contract opportunity
Solicitation number
FA4803-13-R-0005
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, Shaw AFB, SC FY13, newest first.
File Type Posted
Attch._51 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch._50 _B912_Revised_SOW_Oct_18_2013.pdf PDF
Amendment_8.pdf PDF
Attch._47 _PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE_UPDATE.pdf PDF
Attch_43 _AutoCAD_2.dwg DWG drawing
Attch_42 _AutoCAD_1.dwg DWG drawing
Attch_46 _912_FLOOR_PLAN.dwg DWG drawing
Attch_48 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch_49 _MACC_Contracting_Questions_and_Answers.pdf PDF
Attch_41 _B912_Revised_SOW_Sept_25_2013.pdf PDF
Attch_44 _AutoCAD_3.dwg DWG drawing
Amendment_7 _MACC.pdf PDF
Amendment_6.pdf PDF
Atch_38 _tech_Qs.pdf PDF
Atch_40 _MACC_Site_Visit_2_10_September_2013_Sign-in.pdf PDF
Atch_39 _Contracting_Qs.pdf PDF
Atc_37 _B912_Revised_SOW_Sept_20_2013.pdf PDF
Atc_31_Floor_Plan_Title_Block_Template.dwt —
Atc_36_B912_Revised_SOW_Aug_29_2013.pdf PDF
Atc_28_Electrical2.pdf PDF
Atc_32_ShawDrawingCoverSheet.dwg DWG drawing
Atc_35_Contracting_Questions.pdf PDF
Atc_27_Electrical1.pdf PDF
Atc_33_Chapel_area_survey_(2).pdf PDF
Atc_34_Technical_Questions_and_Answers.pdf PDF
Atc_30_Electrical4.pdf PDF
Attch_25-MACC_Meeting_Minutes.pdf PDF
Attch_19-_Technical_Q A.pdf PDF
Attch_23-MACC_Project_Chapel_Survey.dat —
Attch_18-Contracting_Q A.pdf PDF
Attch_24-Water_Flow_Test_Map.pdf PDF
Attch_21-Chapel_Utility_area.pdf PDF
Attch_20-Chapel_Contours.pdf PDF
Attch_22-Chapel_Utility_with_all_area_markings.pdf PDF
Attachment_16 _Questions_ _Answers_set__2.pdf PDF
MACC_amendment__3.pdf PDF
Attachment_14_Blank_Cost_Estimate.xls XLS spreadsheet
Attachment_15 _Base_Map_to_pre-bid_site.pdf PDF
Amendment_2 _MACC.pdf PDF
Attch_13_MACC_Technical_Questions.pdf PDF
amendment_1 _MACC.pdf PDF
Attachment_5-SpecSection01000.pdf PDF
Attachment_2_MACC_Provisions_Feb_26_2013.pdf PDF
Attachment_3-_Shaw_AFB_Design_Standards.pdf PDF
Attachment_8_WD_SC130043_Highway.pdf PDF
Attachment_12_Security_Requirements.pdf PDF
Attachment_7_WD__SC130037_Bldg.pdf PDF
FA4803-13-R-0005_FY_13_MACC_Solicitation.pdf PDF
Attachment_6_WD_SC130011_Dredging.pdf PDF
Attachment_11-_Sample_Project.pdf PDF
Show all 50

Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4803-13-R-0005

Attachment 1 Executive Summary

26 Feb 13

Executive Summary

Shaw Air Force Base currently consists of seven clearly distinguishable districts:

· Mixed Use Central Core

· Flight Line

· Flight Line Support

· Facilities Engineering

· Residential Neighborhoods

· Wetlands/Recreational

· Electronic Warfare Range

The clear distinction of each of the districts and their precise functional adjacency presents a highly ordered and well organized environment for pursuing the base mission. Each of the districts is functionally distinct and, consequently, each district has unique physical characteristics. It is the goal of these Design Compatibility Standards to enrich the unique character of each district while promoting policies reinforcing a harmonious base-wide visual appearance.

Hence, these Design Compatibility Standards have been formulated to:

· Promote conformance with the Air Combat Command (ACC) Architectural and Interior Design Standards.

· Further the development of a base-wide “corporate image” through the creation of a base-wide “campus atmosphere.”

· Further the architectural style of the base, by establishing clear guidelines for achieving a coherent architectural style.

While a military base certainly possesses unique functional requirements (high security, munitions and fuels storage, mission training, etc.) and spatial areas (e.g. runways and hangars, weapons storage, rifle ranges), the majority of the base physical plant corresponds roughly with current developments of corporate office parks and college campuses.

The development of a “corporate image” involves visual unification of the physical elements of the base. Implementing standard wall and roof materials, standardizing the ratio of windows and walls, specifying common colors, and selecting common accessories will lend visual coherence throughout a base. Similarly, the development of a “campus atmosphere” involves overall spatial unification, i.e.

development of a clear, orderly arrangement of buildings with common relationships to the streets, to the base open space and to each other.

The development of an architectural style unique to Shaw Air Force Base, consists of broad, strong, horizontal masonry wall elements into which are inserted light, vertically oriented, elements which serve as visual landmarks as well as points of entry.

In pursuit of these overall objectives, this manual has been established to provide coordinated design criteria throughout the base. These criteria include:

· Site Design Standards

· Architectural Standards

· Interior Design Standards

FA4803-13-R-0005

Attachment 1 Executive Summary

· Landscape Architecture Standards

· ACC Signage Standards

· Site Lighting Standards

· Engineering Standards.

All projects at Shaw Air Force Base must be constructed in accordance with the Shaw Design Compatibility Standards, the ACC Architectural and Interior Design Standards, the Americans with Disabilities Act, the Uniform Federal Accessibility Standards, the International Building Code, the National Fire Protection Association (NFPA) standards and the Antiterrorism/Force Protection (AT/FP) Guidelines.

File details come from the government source that posted it. Updated .