Amendment_7 _MACC.pdf

PDF 48 KB Posted

Attached to
Multiple Award Construction Contract, Shaw AFB, SC FY13 Federal contract opportunity
Solicitation number
FA4803-13-R-0005
Issued by
Department of the Air Force Air Combat Command

About this file

Amendment 7 doc.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, Shaw AFB, SC FY13, newest first.
File Type Posted
Attch._51 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch._50 _B912_Revised_SOW_Oct_18_2013.pdf PDF
Amendment_8.pdf PDF
Attch._47 _PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE_UPDATE.pdf PDF
Attch_48 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch_49 _MACC_Contracting_Questions_and_Answers.pdf PDF
Attch_41 _B912_Revised_SOW_Sept_25_2013.pdf PDF
Attch_43 _AutoCAD_2.dwg DWG drawing
Attch_42 _AutoCAD_1.dwg DWG drawing
Attch_46 _912_FLOOR_PLAN.dwg DWG drawing
Attch_44 _AutoCAD_3.dwg DWG drawing
Atch_40 _MACC_Site_Visit_2_10_September_2013_Sign-in.pdf PDF
Amendment_6.pdf PDF
Atch_38 _tech_Qs.pdf PDF
Atch_39 _Contracting_Qs.pdf PDF
Atc_37 _B912_Revised_SOW_Sept_20_2013.pdf PDF
Atc_31_Floor_Plan_Title_Block_Template.dwt —
Atc_36_B912_Revised_SOW_Aug_29_2013.pdf PDF
Atc_28_Electrical2.pdf PDF
Atc_32_ShawDrawingCoverSheet.dwg DWG drawing
Atc_35_Contracting_Questions.pdf PDF
Atc_27_Electrical1.pdf PDF
Atc_33_Chapel_area_survey_(2).pdf PDF
Atc_34_Technical_Questions_and_Answers.pdf PDF
Atc_30_Electrical4.pdf PDF
Attch_25-MACC_Meeting_Minutes.pdf PDF
Attch_19-_Technical_Q A.pdf PDF
Attch_23-MACC_Project_Chapel_Survey.dat —
Attch_18-Contracting_Q A.pdf PDF
Attch_24-Water_Flow_Test_Map.pdf PDF
Attch_21-Chapel_Utility_area.pdf PDF
Attch_20-Chapel_Contours.pdf PDF
Attch_22-Chapel_Utility_with_all_area_markings.pdf PDF
Attachment_16 _Questions_ _Answers_set__2.pdf PDF
MACC_amendment__3.pdf PDF
Attachment_15 _Base_Map_to_pre-bid_site.pdf PDF
Attachment_14_Blank_Cost_Estimate.xls XLS spreadsheet
Amendment_2 _MACC.pdf PDF
Attch_13_MACC_Technical_Questions.pdf PDF
amendment_1 _MACC.pdf PDF
Attachment_8_WD_SC130043_Highway.pdf PDF
Attachment_5-SpecSection01000.pdf PDF
Attachment_2_MACC_Provisions_Feb_26_2013.pdf PDF
Attachment_3-_Shaw_AFB_Design_Standards.pdf PDF
Attachment_12_Security_Requirements.pdf PDF
Attachment_7_WD__SC130037_Bldg.pdf PDF
FA4803-13-R-0005_FY_13_MACC_Solicitation.pdf PDF
Attachment_6_WD_SC130011_Dredging.pdf PDF
Attachment_11-_Sample_Project.pdf PDF
Attachment_01_Executive_Summary.pdf PDF
Show all 50

Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make the follow ing changes:

1. Incorporate the Revised SOW dated 25 September 2013 as attachment 41.

2. Incorporate AutoCAD draw ing #1 as attachment 42.

3. Incorporate AutoCAD draw ing #2 as attachment 43.

4. Incorporate AutoCAD draw ing #3 as attachment 44.

5. Incorporate AutoCAD draw ing #4 as attachment 45.

6. Incorporate 912 Floor Plan draw ing as attachment 46.

7. Incorporate Present and Past Performance Questionaire update as attachment 47.

8. Incorporate MACC Technical Questions and Answ ers as attachment 48.

9. Incorporate MACC Contracting Questions and Answ ers as attachment 49.

All other terms and conditions remain unchanged. See summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4803-13-R-0005

X 9B. DATED (SEE ITEM 11)

25-Jul-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Sep-2013

CODE

20TH CONTRACTING SQUADRON/LGCA

321 CULLEN STREET

SHAW AFB SC 29152

FA4803 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4803-13-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Executive Summary 2 26-FEB-2013 Attachment 10 Past Performance

Questionaire

5 17-MAY-2013

Attachment 11 Sample Project Statement of Work

46 15-APR-2013

Attachment 12 Security Requirements 6 16-MAY-2013 Attachment 13 MACC Technical

Questions and Answers

1 09-AUG-2013

Attachment 14 Blank Cost Estimate Sheet

1 14-AUG-2013

Attachment 15 Base Map to pre-bid site 1 14-AUG-2013 Attachment 16 MACC Questions and

Answers Set #2

5 16-AUG-2013

Attachment 17 Revised SOW 7 21-AUG-2013 Attachment 18 Contracting Q&A 1 23-AUG-2013 Attachment 19 Technical Q&A 6 23-AUG-2013 Attachment 2 MACC General

Provisions

17 26-FEB-2013

Attachment 20 Chapel Contours 1 23-AUG-2013 Attachment 21 Chapel Utility Area

Drawings

1 23-AUG-2013

Attachment 22 Chapel Utility with all area markings

1 23-AUG-2013

Attachment 23 MACC project chapel survey

1 23-AUG-2013

Attachment 24 Water Flow Test Map 1 23-AUG-2013 Attachment 25 MACC Meeting Minutes 4 23-AUG-2013 Attachment 26 ID2 Handbook 128 23-AUG-2013 Attachment 27 electrical 1 1 04-SEP-2013 Attachment 28 electrical 2 1 04-SEP-2013 Attachment 29 electrical 3 1 04-SEP-2013 Attachment 3 Shaw AFB Design

Standards

118 19-APR-2013

Attachment 30 electrical 4 1 04-SEP-2013 Attachment 31 Floor plan title block template

1 04-SEP-2013

Attachment 32 shaw drawing cover sheet 1 04-SEP-2013 Attachment 33 chapel area survey pdf 1 04-SEP-2013 Attachment 34 Technical Questions and

Answers

4 04-SEP-2013

Attachment 35 Contracting Questions and Answers

8 04-SEP-2013

Attachment 36 Revise SOW 7 29-AUG-2013

Attachment 37 Atch 37, Revised SOW 7 20-SEP-2013 Attachment 38 Technical Q&A 2 20-SEP-2013 Attachment 39 Atch 39, Contracting

Q&A

3 20-SEP-2013

Attachment 4 Environmental Provisions 6 26-FEB-2013 Attachment 40 Atch 40, Site visit sign-in sheet

4 10-SEP-2013

Attachment 5 Special Provisions 6 26-FEB-2013 Attachment 6 WD SC 130011 01

DREDGING

5 04-JAN-2013

Attachment 7 WD SC130037 01 Building

5 04-JAN-2013

Attachment 8 WD SC130043 01 Highway

5 04-JAN-2013

Attachment 9 WD SC130054 01 Heavy 4 04-JAN-2013 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Executive Summary 2 26-FEB-2013 Attachment 10 Past Performance

Questionaire

5 17-MAY-2013

Attachment 11 Sample Project Statement of Work

46 15-APR-2013

Attachment 12 Security Requirements 6 16-MAY-2013 Attachment 13 MACC Technical

Questions and Answers

1 09-AUG-2013

Attachment 14 Blank Cost Estimate Sheet

1 14-AUG-2013

Attachment 15 Base Map to pre-bid site 1 14-AUG-2013 Attachment 16 MACC Questions and

Answers Set #2

5 16-AUG-2013

Attachment 17 Revised SOW 7 21-AUG-2013 Attachment 18 Contracting Q&A 1 23-AUG-2013 Attachment 19 Technical Q&A 6 23-AUG-2013 Attachment 2 MACC General

Provisions

17 26-FEB-2013

Attachment 20 Chapel Contours 1 23-AUG-2013 Attachment 21 Chapel Utility Area

Drawings

1 23-AUG-2013

Attachment 22 Chapel Utility with all area markings

1 23-AUG-2013

Attachment 23 MACC project chapel survey

1 23-AUG-2013

Attachment 24 Water Flow Test Map 1 23-AUG-2013 Attachment 25 MACC Meeting Minutes 4 23-AUG-2013 Attachment 26 ID2 Handbook 128 23-AUG-2013 Attachment 27 electrical 1 1 04-SEP-2013 Attachment 28 electrical 2 1 04-SEP-2013 Attachment 29 electrical 3 1 04-SEP-2013 Attachment 3 Shaw AFB Design

Standards

118 19-APR-2013

Attachment 30 electrical 4 1 04-SEP-2013 Attachment 31 Floor plan title block template

1 04-SEP-2013

Attachment 32 shaw drawing cover sheet 1 04-SEP-2013 Attachment 33 chapel area survey pdf 1 04-SEP-2013 Attachment 34 Technical Questions and

Answers

4 04-SEP-2013

Attachment 35 Contracting Questions and Answers

8 04-SEP-2013

Attachment 36 Revise SOW 7 29-AUG-2013 Attachment 37 Atch 37, Revised SOW 7 20-SEP-2013 Attachment 38 Technical Q&A 2 20-SEP-2013 Attachment 39 Atch 39, Contracting

Q&A

3 20-SEP-2013

Attachment 4 Environmental Provisions 6 26-FEB-2013 Attachment 40 Atch 40, Site visit sign-in sheet

4 10-SEP-2013

Attachment 41 Attch 41, Revised SOW 7 25-SEP-2013 Attachment 42 Attch 42, AutoCAD#1 1 30-SEP-2013 Attachment 43 Attch 43, AutoCAD#2 1 30-SEP-2013 Attachment 44 Attch 44, AutoCAD#3 1 30-SEP-2013 Attachment 45 Attch 45, AutoCAD#4 1 30-SEP-2013 Attachment 46 Attch 46, 912 Floor Plan 1 30-SEP-2013 Attachment 47 Attch 47, Past and Present

Performance Questionaire Update

5 30-SEP-2013

Attachment 48 Attch 48, MACC Technical Questions and Answers

7 30-SEP-2013

Attachment 49 Attch 49, MACC Contracting Questions and Answers

1 30-SEP-2013

Attachment 5 Special Provisions 6 26-FEB-2013 Attachment 6 WD SC 130011 01

DREDGING

5 04-JAN-2013

Attachment 7 WD SC130037 01 Building

5 04-JAN-2013

Attachment 8 WD SC130043 01 Highway

5 04-JAN-2013

Attachment 9 WD SC130054 01 Heavy 4 04-JAN-2013

(End of Summary of Changes)