Attachment_11-_Sample_Project.pdf
PDF 12 MB Posted
- Attached to
- Multiple Award Construction Contract, Shaw AFB, SC FY13 Federal contract opportunity
- Solicitation number
- FA4803-13-R-0005
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN/BUILD
STATEMENT OF WORK
FOR
DESIGN-CONSTRUCT ADDITION TO PALMETTO CHAPEL B912
PROJECT: VLSB 04-0105A/B 15 APR 2013
DESIGN-CONSTRUCT ADDITION BUILDING 912
The Contractor shall provide all plant, labor, material and supervision to design and construct an educational space addition to the Palmetto Chapel B912. The Contractor shall design and construct the maximum square footage for the addition but cost shall not exceed the Congressional minor construction statutory cost limit.
The work will include, but is not limited to, providing all site work, utilities, and access walkways. Building shall be designed and constructed in accordance with base design standards and architecturally match the existing facility. The addition shall integrate with existing building mechanical, electrical, plumbing, and control systems. A fire suppression system shall be included in the design and shall be expanded into the existing building. A mass notification system shall be designed to be expanded into the existing building in the future. See the attached site and floor plans for the conceptual layout.
The Contractor will furnish a proposal that includes a cost estimate identifying the Minor Construction Cost and the Repair Cost separately. Minor Construction Cost (VLSB 04- 0105A) is any cost associated with the new building. Repair Cost (VLSB 04-0105B) is any work in the existing building to include any facility work on the existing structure, any interior renovation, and the addition of a fire suppression system. The Contractor will supply a cost breakdown following the CSI (Construction Standard Institute) 2012 edition numbering system.
Function and Size:
The addition to the Base Chapel, Building 912, is to serve as a religious education facility. Design shall provide, at a minimum, three (3) classrooms, male/female restrooms, a break room, a mech room, a janitor’s closet, a comm room and an electrical room. The contractor shall provide capabilities of expanding classrooms into each other to allow more space for larger activities. In addition to the construction of the classroom building, the contractor shall also renovate a portion of the existing building to become a connecting hallway (approximately 400 square feet) to the new facility. The classroom building is to be connected to the existing building by the new enclosed walkway. The walkway shall be Americans with Disabilities Act (ADA) / Architectural Barriers Act (ABA) compliant and approximately 40’ long with required emergency exits.
FA4803-13-R-0005
Existing building drawings:
See attachments.
Design:
This building shall be designed and constructed in strict compliance with the Shaw AFB Design Standards and all codes, regulations, UFCs and other documents referenced within. Contractor will be responsible for obtaining all Department of Health and Environmental Control (DHEC) permits.
Contractor Design Submittals: Clearly identify on each sheet of the drawings and on all other submittal items, the date and design percentage they are being submitted under.
Contractor shall provide electronic files (.dwg and PDF formats) on CDR, bound drawings 1 set – (11”x17”), specifications and a cost estimate at each of the 35%, 65% and 100% design submittals.
Minimum Design Considerations:
THE SITE SHALL INCLUDE:
Concrete: Building slab shall be 3000 PSI concrete, minimum of 6” thick with WWM with compacted base. Concrete walkway shall be 5’ x 5’ sections with 3000 PSI concrete, 4” thick with WWM with compacted base.
Water Service: Tie into existing domestic water on site.
Sewer Service: Tie into existing sanitary sewer on site.
Electrical Service: Service to the addition should be provided by the existing facility electrical service if adequate. If not, a new pad mounted transformer and electrical service shall be provided.
Panel for the facility shall be a minimum of 225 amp, 42 circuit.
THE FACILITY SHALL INCLUDE:
Eave Height: 9’ (min), match existing Roof: Prefabricated metal roof trusses with a R-30 insulation package and standing seam metal roof panels to match existing with 2‘ soffit.
Exterior Walls: Concrete block walls with brick veneer exterior to match Chapel B912. Interior block walls to be finished with furring channels and painted gypsum board (except Mechanical Room).
Exterior Windows: Provide adequate number of windows for day lighting.
Windows shall be fixed, double paned, insulated, aluminum frames dark bronze in color connected to the metal structure of the building. Windows shall comply with all anti-terrorism criteria.
Interior Windows: None.
Exterior Personnel Doors: Heavy duty insulated metal with lite, panic hardware and high security Best locks.
Mechanical Room Doors: Hollow metal double doors (each 3’-0” min) with Best lock system.
Interior Personnel Doors: Hollow Metal with hardware and Best lock system. Break Room and Classroom doors with lites, flush panel doors at all other rooms including rest rooms, comm room and janitor’s closet. Provide door with panic hardware and Best lock system between corridor in new building and new enclosed walkway as required to meet fire code.
Special Doors: As specified by the contractor.
Flooring: 28 oz. nylon direct glue down carpet with carpet base in
Classrooms and hallways. Break Room shall have Ceramic Tile floor. Rest rooms shall have Ceramic Tile floors, base and wainscot at urinals. Sealed concrete with rubber base for non occupied rooms including Mechanical Room, Electrical Room and Janitor’s closet.
HVAC: Stand-alone split system heat pumps sized appropriately with auxiliary heat strips. Air Handling Units shall be installed in the new mechanical room. Outside air dampers and duct shall be installed in accordance with SMACNA HVAC design standards. Contractor shall provide a programmable thermostat and provisions for manual emergency shutdown and automatic shutdown upon receipt of a fire signal. A makeup air damper capable of future conversion to automatic closure will be included. When the new HVAC system is installed a test and balance of the system shall be performed to balance and distribute the designed airflow values determined for each area.
Test and balance report shall be submitted to contracting officer for approval. Contractor shall also understand that the following rooms will have at a minimum number of people and equipment. Classrooms – Up to 40 people each, 2 computers, 1 each: TV, VCR, DVD player and printer. Break Room – 1 microwave and 1 refrigerator.
Fire Sprinkler System: Required throughout new and existing buildings and connecting walkway and shall be in accordance with NFPA and UFC standards with calculations and drawings accomplished by a fire protection engineer registered in the state of South Carolina.
Floor drains: Required for interior janitors closet and rest rooms. Self cleaning drain traps must be used.
Hose bibs: Install 1 each on the exterior north, east, west and south sides of addition.
Water Cooler: One ADA compliant water cooler required.
Water Heater: Provide hot water to service the addition.
Showers: None.
Ceilings: Install 2 x 2 suspended ceiling system throughout except in
Mechanical Room, Electrical Room and Comm Room. Tiles in Rest Rooms and Janitor’s closet to be washable.
Security: Ensure all provisions of the current edition Unified Facility
Criteria (UFC) 4-010-01, “DOD Minimum Antiterrorism Standards For Buildings” are incorporated into the facility.
Fire: Ensure all doors and walls meet fire codes and are appropriately identified on drawings.
Fire Alarm System: Install Fire Alarm detection and annunciation system as required by NFPA and UFC: Tie addition into the existing FACP and Monaco radio transmitter. Install horn/strobe combinations, hand stations and all required components.
Lighting: a. Install 2 x 4 lay-in LED fixtures except as noted elsewhere in this Statement of Work.
b. Install exterior emergency lighting where required and include battery operated emergency lighting 2 x 4 fixtures as required in the facility.
Receptacles: The following are the required minimums:
a. Hallways – Two (2) receptacles every 20 lineal feet.
b. Classrooms - Four (4) LAN/telephone outlets and receptacles adjacent to them. Janitor - Two (2) receptacles.
c. Install a receptacle adjacent to each bathroom sink.
d. Break Room – Install four (4) counter height receptacles each on a separate circuit. Include an outlet for the refrigerator and 2 additional wall outlets.
e. All 120Vac outlets shall be 20A spec grade with no more than 6 outlets per circuit allowed except the break room where all outlets installed shall be circuited separately.
Electrical Service: a. Service to the addition should be provided by the existing facility electrical service if adequate. If not, a new pad mounted transformer and electrical service shall be provided. Panel for the facility shall be a minimum of 225 amp, 42 circuit.
b. Install new electrical disconnects at both the new air handlers and the new condensing units.
Minimum Submittal Requirements:
35% Drawings submitted shall include, but not be limited to:
a. Proposed Final Floor plan
b. Proposed Site Plan
c. Life Safety Plan
d. Generator Analysis
e. All site survey information and details with existing and final grades for the site, the facility and all paved areas.
f. All building slab and footer locations and details.
g. All interior load-bearing building components including details.
h. Location, size and route for all exterior equipment and utilities (gas, water, sanitary sewer, electrical, telephone). Show exact location where the utilities will enter the facility.
i. All door and window schedules to include construction, type, size and information on all associated hardware.
j. All exterior finishes, materials and construction details. Contractor shall submit, at this time, color samples for all exterior colors.
k. All interior and exterior lighting calculations and layouts.
l. All building electrical equipment layout location and details. Service sizing and major electrical equipment shall be shown at this time. Electrical service, transformer, voltage drop and short circuit calculations shall be provided at this time. Layouts for receptacles and interior lighting are required at this time.
m. All building steel layout and roof plan, as well as exterior color submittals.
n. Any design, calculations or equipment submittals deemed necessary by the
Contractor to allow for continuation of the design.
o. AF Form 66 with all submittals listed, including but not limited to, all major equipment, color samples and design submittals. Assume one (1) sample of each color submittal and four (4) copies of all other submittals are required.
65% Drawings submitted shall include, but not be limited to:
a. All building HVAC equipment layout, location and details. Sizing calculations for unit(s) and duct shall also be provided at this time. Layouts for the ducts and registers are not required but preferred at this time.
b. Any special systems such as ventilation, hoists and cranes, fire alarm, communications (LAN & Telephone), security infrastructure and fire sprinkler system shall be submitted complete.
c. Any design, calculations or equipment submittals deemed necessary by the Contractor to allow design to continue.
100% Drawings submitted shall include, but not be limited to:
a. All interior, non-load bearing construction including details.
b. Complete construction details and materials for all interior work.
c. All interior finishes and covers. This shall include a color board showing all previously selected and proposed colors for the facility. Color board shall consist of the arranged, mounted and labeled color samples on a ¼” foam board.
d. Any and all remaining design, calculations or submittals deemed necessary to provide a complete and constructible design.
e. Contractor shall provide the complete design including all as-built, field modifications and design corrections made during the process of construction. All drawings shall meet the Shaw AFB design standards and be in AutoCAD V2009 or later format and Adobe PDF provided on a 5¼”
CD-R.
GENERAL DESIGN AND CONSTRUCTION NOTES:
1. The information provided in this SOW, the provided drawings and the requirements of the Shaw AFB Design and Construction Standards shall be determined to be the minimum standards required in this project. Where the information provided and/or Shaw AFB Design and Construction Standards conflict then the most stringent shall be used. This includes all standards, codes, regulations and requirements provided by reference.
2. All drawings shall be sealed, signed and dated by a Professional Engineer (PE) or
Registered Architect (RA), currently registered in the state of South Carolina, and is a design professional in the area covered by the sheet(s) of the drawings they seal.
3. The Contractor shall include make, model number and inherent operational characteristics on the drawings for all of major equipment supplied for the facility. Contractor shall supply manufacture’s cut sheets with the design submittal where the component is first identified.
4. The Contractor shall show all calculations on the drawings in lieu of a separate document, except where specifically allowed by the Shaw AFB Design Engineer.
| B912 SOW Apr 15 2013-Sample Project |
| PROJECT: VLSB 04-0105A/B 15 APR 2013 |
| Sample Project Existing B912 Drawings |
| 0912a01b |
| 0912a01g |
| 0912a02c |
| 0912a02d |
| 0912a02h |
| 0912a03b |
| 0912a03d |
| 0912a03e |
| 0912a04b |
| 0912a04d |
| 0912a04e |
| 0912a05b |
| 0912a05d |
| 0912a07b |
| 0912c01f |
| 0912c02f |
| 0912c03f |
| 0912cs1c |
| 0912cs1d |
| 0912cs1e |
| 0912h16b |
| 0912h17b |
| 0912m15b |
| 0912p18b |
| 0912s01h |
| 0912s02b |
| 0912s02e |
| 0912s03h |
| 0912s05e |
| 0912s06b |
| 0912s08b |
| 0912s09b |
| 0912s10b |
| 0912s11b |
| 0912s12b |
| 0912s13b |
| 0912s14b |
| Sample Project Plans |
| Location Plan |
| Site Plan |
| Location of Addition Plan |
File details come from the government source that posted it. Updated .