MACC Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, Shaw AFB, SC FY13, newest first.
File Type Posted
Attch._47 _PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE_UPDATE.pdf PDF
Attch _52 _MACC_Contracting_Questions_and_Answers.pdf PDF
Amendment_8.pdf PDF
Attch._51 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch._50 _B912_Revised_SOW_Oct_18_2013.pdf PDF
Amendment_7 _MACC.pdf PDF
Attch_45 _AutoCAD_4.dwg DWG drawing
Attch_44 _AutoCAD_3.dwg DWG drawing
Attch_48 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch_49 _MACC_Contracting_Questions_and_Answers.pdf PDF
Attch_41 _B912_Revised_SOW_Sept_25_2013.pdf PDF
Attch_43 _AutoCAD_2.dwg DWG drawing
Attch_42 _AutoCAD_1.dwg DWG drawing
Attch_46 _912_FLOOR_PLAN.dwg DWG drawing
Atc_37 _B912_Revised_SOW_Sept_20_2013.pdf PDF
Atch_39 _Contracting_Qs.pdf PDF
Atch_40 _MACC_Site_Visit_2_10_September_2013_Sign-in.pdf PDF
Amendment_6.pdf PDF
Atc_30_Electrical4.pdf PDF
Amendment_5.pdf PDF
Atc_29_Electrical3.pdf PDF
Atc_35_Contracting_Questions.pdf PDF
Atc_27_Electrical1.pdf PDF
Atc_33_Chapel_area_survey_(2).pdf PDF
Atc_34_Technical_Questions_and_Answers.pdf PDF
Attch_20-Chapel_Contours.pdf PDF
Attch_22-Chapel_Utility_with_all_area_markings.pdf PDF
Attch_17-Revised_SOW.pdf PDF
Attch_26-Shaw_AFB_ID2_Handbook.pdf PDF
Amendment_4 _FA4803-13-R-0005.pdf PDF
Attch_19-_Technical_Q A.pdf PDF
Attch_23-MACC_Project_Chapel_Survey.dat —
Attch_18-Contracting_Q A.pdf PDF
Attch_24-Water_Flow_Test_Map.pdf PDF
Attch_21-Chapel_Utility_area.pdf PDF
MACC_amendment__3.pdf PDF
Amendment_2 _MACC.pdf PDF
Attachment_15 _Base_Map_to_pre-bid_site.pdf PDF
amendment_1 _MACC.pdf PDF
Attachment_01_Executive_Summary.pdf PDF
Attachment_9_WD_SC130054_Heavy.pdf PDF
Attachment_4-SpecSection01800.pdf PDF
Attachement_10_Past_Performance_Questionaire.pdf PDF
Attachment_12_Security_Requirements.pdf PDF
Attachment_7_WD__SC130037_Bldg.pdf PDF
FA4803-13-R-0005_FY_13_MACC_Solicitation.pdf PDF
Attachment_6_WD_SC130011_Dredging.pdf PDF
Attachment_11-_Sample_Project.pdf PDF
Attachment_8_WD_SC130043_Highway.pdf PDF
Attachment_5-SpecSection01000.pdf PDF
Show all 50

Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY13 MACC Technical Questions

1. Is the seed project requiring 35% or 100% Design - The attachment 11 seems to call out 100% design requirements although previous MACC Seed projects have only required 35% in order to lower the initial cost to the 8(a) Contractor.

IAW the RFP Section M, M002 EVALUATION FACTORS paragraph d., the requirement is for 35% and 100% upon the due date for the technical proposals.

2. Will the 35% Drawings have to be sealed? - No only the 100%

3. Page 3 in the Statement of work - Fire Sprinkler System: Will it be acceptable for a SC fire protection firm/installer to accomplish the drawings and standards rather than a separate fire protection engineer?

It is acceptable just for the purpose of this sample project. However, successful bidders will be required to meet all UFC requirements in future contracts.

4. Page 4 in the Statement of Work – Security: Will there be a POC given at Shaw AFB to describe what the Minimum anti terrorism standards will be for this facility?

No, refer to UFC 4-010-01

5. Page 5 in the Statement of work- d. Generator Analysis: What is meant by Generator Analysis and is there a generator currently installed at the Chapel?

Disregard (d) Generator Analysis, this requirement for 35% will be eliminated in the revised RFP.

6. Will there be a CAD file of the current Site/Survey provided to the contractor to aid with the

Design proposal?

Yes, CAD files will be supplied as soon as possible.

7. Page 6 in the Statement of work- #4. – Will it be acceptable to provide the HVAC load calculations on a separate PDF? The HVAC load calculations will be approximately 40-60 pages in length and difficult to include on the drawings as specified.

Yes, in accordance with the SOW.

8. Page 52 of the Solicitation – Part II Technical proposal states that: Part II must be submitted 15

Calendar Days prior to proposal due date. This allows 10 Calendar days to prepare the technical data. Could we request to have additional time for this preparation due to the extensive investigative needs for this project?

Determination may be made after site visit

9. Page 3 Statement of Work – HVAC: Is the Design team limited to using a stand-alone split system or may we specify a better option if available?

Any HVAC system can be used but must meet the specified loads and the energy guidelines identified in the current design and construction standards.

IAW the RFP Section M, M002 EVALUATION FACTORS paragraph d., the requirement is for 35% and 100% upon the due date for the technical proposals.