Amendment 6 Doc.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make the follow ing changes:
1. Add Revised Statement of Work dated 20 September 2013 as attachment 37.
2. Add Technical Questions and Answ ers as attachment 38.
3. Add Contracting Questions and Answ ers as attachment 39.
4. Add Contractor Sign-in Sheet from September 10th site visit as attachment 40.
5. Extend Question Submission due date to October 4th, 2013 by 2 PM EST.
All other term and conditions remain unchanged. See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Sep-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4803-13-R-0005
X 9B. DATED (SEE ITEM 11)
25-Jul-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Sep-2013
CODE
20TH CONTRACTING SQUADRON/LGCA
321 CULLEN STREET
SHAW AFB SC 29152
FA4803 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4803-13-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required performance has changed from Multiple Award Construction Contract (MACC) is a competitive 8(a) multiple award, indefinite delivery/indefinite quantity (IDIQ) construction contract based on established clauses, Terms and Conditions & General Provisions. Specific projects will be defined with each individual Task Order.Work is to be performed in the general construction category to include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving, earthwork & waterfront work in industrial/office buildings. Work may involve design/build projects as well as new construction of buildings or facilities to include some or all of the above elements of work. Scope includes work at Shaw AFB, Pointsett Electronic Combat Range, & Wateree Recreation Facility,SC & various other sites throughout the southeastern US.A second site visit is scheduled for 10 September 2013, at 1:30 PM EST. IAW the SBA 8(a) bona fide office requirement,only offers in the geographic region who have an SBA pre-approved bona fide office within the five state area of South Carolina, North Carolina, Georgia, Alabama & Florida can bid.Disclosure of Magnitude
(for the seed project only):$1,000,000 to $5,000,000 to Multiple Award Construction Contract (MACC) is a competitive 8(a) multiple award, indefinite delivery/indefinite quantity (IDIQ) construction contract based on established clauses, Terms and Conditions & General Provisions. Specific projects will be defined with each individual Task Order.Work is to be performed in the general construction category to include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving, earthwork & waterfront work in industrial/office buildings. Work may involve design/build projects as well as new construction of buildings or facilities to include some or all of the above elements of work. Scope includes work at Shaw AFB, Pointsett Electronic Combat Range, & Wateree Recreation Facility,SC & various other sites throughout the southeastern US.IAW the SBA 8(a) bona fide office requirement,only offers in the geographic region who have an
SBA pre-approved bona fide office within the five state area of South Carolina, North Carolina, Georgia, Alabama
& Florida can bid.Disclosure of Magnitude (for the seed project only):$1,000,000 to $5,000,000.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Executive Summary 2 26-FEB-2013
Attachment 10 Past Performance
Questionaire
5 17-MAY-2013
Attachment 11 Sample Project Statement of Work
46 15-APR-2013
Attachment 12 Security Requirements 6 16-MAY-2013
Attachment 13 MACC Technical
Questions and Answers
1 09-AUG-2013
Attachment 14 Blank Cost Estimate
Sheet
1 14-AUG-2013
Attachment 15 Base Map to pre-bid site 1 14-AUG-2013
Attachment 16 MACC Questions and
Answers Set #2
5 16-AUG-2013
Attachment 17 Revised SOW 7 21-AUG-2013
Attachment 18 Contracting Q&A 1 23-AUG-2013
Attachment 19 Technical Q&A 6 23-AUG-2013
Attachment 2 MACC General
Provisions
17 26-FEB-2013
Attachment 20 Chapel Contours 1 23-AUG-2013
Attachment 21 Chapel Utility Area
Drawings
1 23-AUG-2013
Attachment 22 Chapel Utility with all area markings
1 23-AUG-2013
Attachment 23 MACC project chapel survey
1 23-AUG-2013
Attachment 24 Water Flow Test Map 1 23-AUG-2013
Attachment 25 MACC Meeting Minutes 4 23-AUG-2013
Attachment 26 ID2 Handbook 128 23-AUG-2013
Attachment 27 electrical 1 1 04-SEP-2013
Attachment 28 electrical 2 1 04-SEP-2013
Attachment 29 electrical 3 1 04-SEP-2013
Attachment 3 Shaw AFB Design
Standards
118 19-APR-2013
Attachment 30 electrical 4 1 04-SEP-2013
Attachment 31 Floor plan title block template
1 04-SEP-2013
Attachment 32 shaw drawing cover sheet 1 04-SEP-2013
Attachment 33 chapel area survey pdf 1 04-SEP-2013
Attachment 34 Technical Questions and
Answers
4 04-SEP-2013
Attachment 35 Contracting Questions and Answers
8 04-SEP-2013
Attachment 36 Revise SOW 7 29-AUG-2013
Attachment 4 Environmental Provisions 6 26-FEB-2013
Attachment 5 Special Provisions 6 26-FEB-2013
Attachment 6 WD SC 130011 01
DREDGING
5 04-JAN-2013
Attachment 7 WD SC130037 01
Building
5 04-JAN-2013
Attachment 8 WD SC130043 01
Highway
5 04-JAN-2013
Attachment 9 WD SC130054 01 Heavy 4 04-JAN-2013 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Executive Summary 2 26-FEB-2013
Attachment 10 Past Performance
Questionaire
5 17-MAY-2013
Attachment 11 Sample Project Statement of Work
46 15-APR-2013
Attachment 12 Security Requirements 6 16-MAY-2013
Attachment 13 MACC Technical
Questions and Answers
1 09-AUG-2013
Attachment 14 Blank Cost Estimate
Sheet
1 14-AUG-2013
Attachment 15 Base Map to pre-bid site 1 14-AUG-2013
Attachment 16 MACC Questions and
Answers Set #2
5 16-AUG-2013
Attachment 17 Revised SOW 7 21-AUG-2013
Attachment 18 Contracting Q&A 1 23-AUG-2013
Attachment 19 Technical Q&A 6 23-AUG-2013
Attachment 2 MACC General
Provisions
17 26-FEB-2013
Attachment 20 Chapel Contours 1 23-AUG-2013
Attachment 21 Chapel Utility Area
Drawings
1 23-AUG-2013
Attachment 22 Chapel Utility with all area markings
1 23-AUG-2013
Attachment 23 MACC project chapel survey
1 23-AUG-2013
Attachment 24 Water Flow Test Map 1 23-AUG-2013
Attachment 25 MACC Meeting Minutes 4 23-AUG-2013
Attachment 26 ID2 Handbook 128 23-AUG-2013
Attachment 27 electrical 1 1 04-SEP-2013
Attachment 28 electrical 2 1 04-SEP-2013
Attachment 29 electrical 3 1 04-SEP-2013
Attachment 3 Shaw AFB Design
Standards
118 19-APR-2013
Attachment 30 electrical 4 1 04-SEP-2013
Attachment 31 Floor plan title block template
1 04-SEP-2013
Attachment 32 shaw drawing cover sheet 1 04-SEP-2013
Attachment 33 chapel area survey pdf 1 04-SEP-2013
Attachment 34 Technical Questions and
Answers
4 04-SEP-2013
Attachment 35 Contracting Questions and Answers
8 04-SEP-2013
Attachment 36 Revise SOW 7 29-AUG-2013
Attachment 37 Atch 37, Revised SOW 7 20-SEP-2013
Attachment 38 Technical Q&A 2 20-SEP-2013
Attachment 39 Atch 39, Contracting
Q&A
3 20-SEP-2013
Attachment 4 Environmental Provisions 6 26-FEB-2013
Attachment 40 Atch 40, Site visit sign-in sheet
4 10-SEP-2013
Attachment 5 Special Provisions 6 26-FEB-2013
Attachment 6 WD SC 130011 01
DREDGING
5 04-JAN-2013
Attachment 7 WD SC130037 01
Building
5 04-JAN-2013
Attachment 8 WD SC130043 01
Highway
5 04-JAN-2013
Attachment 9 WD SC130054 01 Heavy 4 04-JAN-2013
(End of Summary of Changes)
File details come from the government source that posted it. Updated .