Specifications_-_Table_of_contents_(Amended).pdf

PDF 70 KB Posted

Attached to
Malmstrom AFB Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA462619RA014
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a table of contents for construction specifications for repair and renovation work at Dormitory 655 at Malmstrom Air Force Base in Montana. Key details include mechanical, electrical, plumbing and architectural work across three floors, with demolition, renovation and new construction plans. Divisions of work include selective demolition, structural steel, interior finishes, exterior insulation and finishes, doors and windows, HVAC, plumbing, fire alarm and mass notification systems. The project scope also involves concrete paving, with mechanical, electrical and plumbing demolition and renovation plans provided for each floor. Related drawings provide additional information on existing conditions, proposed renovations and details. The solicitation number listed is for an upcoming multiple award task order contract through the Department of the Air Force Global Strike Command for construction services at Malmstrom AFB.

Amended Table of Contents for Specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Malmstrom AFB Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Q&A__5.docx DOCX document
Q&A__4_Attachment_1_-_Cabinet_Bottom.pdf PDF
Amendment_1_FA462619RA0140001.pdf PDF
Addendum__1.pdf PDF
Q&A__4.pdf PDF
Q&A__4_Attachment_2_-_09_72_00_FL_-_Wall_Coverings.pdf PDF
Q&A__3_Attachment_1_-_Irrigation_mainline_as-builts.PDF PDF
Q&A__3.docx DOCX document
PreProposal_SiteVisit_Minutes.pdf PDF
Pre-Proposal_Conference_Sign-in_Roster.pdf PDF
Q&A__2.docx DOCX document
Q&A__2_Attachment_1_-_Asbestos_Survey.pdf PDF
Q&A__2_Attachment_3_-_Drawing_M1.4_Bid_Docs_-_MAFB_Dorm_655.pdf PDF
Q&A__2_Attachment_2_-_08_14_16_FL_-_FLUSH_WOOD_DOORS.pdf PDF
Attach_6_Drawing_M1.3.pdf PDF
Q&A__1.docx DOCX document
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_8.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_6.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_7.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_5.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_3.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_4.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_1.0.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_4.pdf PDF
Attach_9_Subcontractor_Consent_Rev_1.doc DOC document
Attach_1_MATOC_Statement_of_Work_Rev2.doc DOC document
Attach_5__Schedule_of_Drawings_Repair_Dorm_655.doc DOC document
Attach_8_Past_Performance_Questionaire_Rev1.docx DOCX document
Attach_2_Specifications_Repair_Dorm_655_Part_3.pdf PDF
Attach_11_SECTION_L_Rev1.docx DOCX document
Attach_12_SECTION_M_Revision_5.docx DOCX document
Solicitation_-_FA462619RA014.pdf PDF
Attach_13_Wage_Determinations.docx DOCX document
Attach_4_Full_Submittal_Schedule_Repair_Dorm_655.xls XLS spreadsheet
Attach_14_MATOC_Task_Order_Procedures_Rev4.docx DOCX document
Attach_10_On-Off_Ramp_Procedures_Rev1.docx DOCX document
Attach_7_Installation_Perimeter_Access_Control.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_1.pdf PDF
Attach_3_Bid_Schedule_Repair_Dorm_655.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 01 FA4626-18-R-0030

Repair Dormitory 655

NZAS 04-1042

REPAIR DORMITORY 655

MALMSTROM AIR FORCE BASE, MONTANA

FA4626-12-D-0003

SMA PROJECT NO. 1707

TABLE OF CONTENTS

Enumeration of Drawings, Specifications and Addenda: The following are the Specifications and Drawings, and Addenda which form a part of this Contract:

See following Specifications for Bidding Requirements, Proposal, Special Conditions, etc.

SPECIFICATIONS

DIVISION 1

SECTION 01 00 00 – GENERAL REQUIREMENTS

SCHEDULE OF MATERIALS SUBMITTALS

QUALITY CONTROL REPORT TO INSPECTOR

SECTION 01 10 00 – SECURITY

SECURITY FORM (CEAL)

SECTION 01 36 00 – ENVIRONMENTAL PROTECTION

WASTE MANAGEMENT PLAN

RECOVERED MATERIALS WRITTEN DETERMINATION FORM

RECYCLED MATERIAL USE REPORT

MONTHLY REPORT OF SOLID WASTE DISPOSAL AND DIVERSION

SAMPLE OF HAZARDOUS MATERIAL LIST

SECTION 01 50 00 – TEMPORARY FACILITIES AND CONTROLS

DIVISION 2

SECTION 02 41 19 – SELECTIVE DEMOLITON

DIVISION 3 – NOT USED

DIVISION 4 – NOT USED

DIVISION 5

SECTION 05 12 00 – STRUCTURAL STEEL

DIVISION 6

SECTION 06 16 00 – SHEATING

SECTION 06 20 23 – INTERIOR FINISH CARPENTRY

SECTION 06 41 16 –LAMINATE FACED ARCHITECTURAL CABINETS

DIVISION 7

SECTION 07 24 13 –POLYMER-BASED EXTERIOR INSULATION & FINISH

SYSTEMS (EIFS)

SECTION 07 25 00 – WEATHER BARRIERS

SECTION 07 71 00 – ROOF SPECIALTIES

SECTION 07 92 00 – JOINT SEALANTS

DIVISION 8

SECTION 08 11 13 –STEEL DOOR AND FRAMES

SECTION 08 14 16 – FLUSH WOOD DOORS

SECTION 08 51 13 –ALUMINUM WINDOWS

SECTION 08 71 10 –DOOR HARDWARE

SECTION 08 80 00 – GLAZING

DIVISION 9

SECTION 09 29 00 – GYPSUM BOARD

SECTION 09 30 00 – TILING

SECTION 09 65 13 – RESILIENT BASE AND ACCESSORIES

SECTION 09 65 16 – RESILIENT SHEET FLOORING

SECTION 09 68 13 – TILE CARPETING

SECTION 09 72 00 – WALL COVERINGS

SECTION 09 77 20 – DECORATIVE FIBERGLASS REINFORCED PANELS

SECTION 09 91 13 – EXTERIOR PAINTING

SECTION 09 91 23 – INTERIOR PAINTING

SECTION 09 93 00 –STAINING AND TRANSPARENT FINISHING

DIVISION 10

SECTION 10 21 16 – PRECAST SHOWER BASINS AND WALLS PANELS

SECTION 10 28 00 – TOILET, BATH, AND LAUNDRY ACCESSORIES

DIVISION 11 – NOT USED

DIVISION 12

SECTION 12 36 61 – SIMULATED STONE COUTERTOPS

DIVISION 13 – NOT USED

DIVISION 14 – NOT USED

DIVISION 15 – NOT USED

DIVISION 16 – NOT USED

DIVISION 17 – NOT USED

DIVISION 18 – NOT USED

DIVISION 19 – NOT USED

DIVISION 20 – NOT USED

DIVISION 21 – NOT USED

DIVISION 22

SECTION 22 05 11 – COMMON WORK RESULTS FOR PLUMBING

SECTION 22 05 12 – GENERAL MOTOR REQUIREMENTS FOR PLUMBING

SECTION 22 05 23 – GENERAL DUTY VALVES FOR PLUMBING PIPING

SECTION 22 11 00 – FACILTY WATER DISTRIBUTION

SECTION 22 13 00 –FACILITY SANITARY SEWERAGE

SECTION 22 40 00 – PLUMBING FIXTURES

DIVISION 23

SECTION 23 05 11 – COMMON WORK RESULTS FOR HVAC AND STEAM GEN.

SECTION 23 05 12 – GENERAL MOTOR REQUIREMENTS FOR HVAC AND

NZAS 04-1042

STEAM GENERATION EQUIPMENT

SECTION 23 05 93 – TESTING ADJUSTING, AND BALANCING FOR HVAC

SECTION 23 07 11 – HVAC, PLUMBING, & BOILER PLANT INSULATION

SECTION 23 09 00 – CONTROL SYSTEMS FOR HVAC

SECTION 23 21 13 – HYDRONIC PIPING

SECTION 23 21 23 – HYDRONIC PUMPS

SECTION 23 31 00 – HVAC DUCTS AND CASING

SECTION 23 34 00 – HVAC FANS

SECTION 23 37 00 – AIR OUTLETS AND INLETS

SECTION 23 64 23 – AIR COOLED CHILLER

SECTION 23 82 00 – HEATING AND COOLING UNITS

DIVISION 24 – NOT USED

DIVISION 25 – NOT USED

DIVISION 26

SECTION 26 05 00 – GENERAL PROVISIONS FOR ELECTRICAL

SECTION 26 05 01 – ELECTRICAL DEMOLITION

SECTION 26 05 03 – EQUIPMENT WIRING CONNECTIONS

SECTION 26 05 19 – LOW VOLTAGE CONDUCTORS AND CABLES

SECTION 26 05 26 – GROUNDING AND BONDING

SECTION 26 05 29 – HANGERS AND SUPPORTS

SECTION 26 05 32 – CONDUIT

SECTION 26 05 33 – BOXES

SECTION 26 05 53 – IDENTIFICATION

SECTION 26 09 23 – LIGHTING CONTROL DEVICES

SECTION 26 27 26 – WIRING DEVICES

SECTION 26 28 19 – ENCLOSED SWITCHES

SECTION 26 43 00 – GUTTER DE-ICING SYSTEMS

SECTION 26 51 00 – INTERIOR LUMINAIRES

SECTION 26 52 00 – EMERGENCY LIGHTING

SECTION 26 56 00 -- EXTERIOR LIGHTING

DIVISION 27 – NOT USED

DIVISION 28

SECTION 28 31 74 – INTERIOR ADDRESSABLE FIRE ALARM

SECTION 28 31 76 – INTERIOR MASS NOTIFICATION

APPENDIX – PRODUCT DATA INFORMATION

DIVISION 29 – NOT USED

DIVISION 30 – NOT USED

DIVISION 31– NOT USED

DIVISION 32

SECTION 32 13 13 – CONCRETE PAVING

DIVISON 33 – NOT USED

DRAWINGS

COV COVER SHEET

PROJECT INFORMATION

SHEET INDEX

VICINITY MAP

LEGEND AND ABBREVIATIONS

GENERAL NOTES

ARCHITECTURAL

A0.00 ARCHITECTURAL SITE PLAN

A1.00 FIRST FLOOR EXISTING/DEMOLITION PLAN

A1.01 SECOND FLOOR EXISTING/DEMOLITION PLAN

A1.02 THIRD FLOOR EXISTING/DEMOLITION PLAN

A2.00 FIRST FLOOR RENOVATION PLAN

A2.01 SECOND FLOOR RENOVATION PLAN

A2.02 THIRD FLOOR RENOVATION PLAN

A2.03 FIRST FLOOR FINISH PLAN

A2.04 SECOND FLOOR FINISH PLAN

A2.05 THIRD FLOOR FINISH PLAN

A2.06 FIRST FLOOR REFLECTED CEILING PLAN

A2.07 SECOND FLOOR REFLECTED CEILING PLAN

A2.08 THIRD FLOOR REFLECTED CEILING PLAN

A3.00 DEMOLITION EXTERIOR ELEVATIONS

A3.01 DEMOLITION EXTERIOR ELEVATIONS

A3.02 RENOVATION EXTERIOR ELEVATIONS

A3.03 RENOVATION EXTERIOR ELEVATIONS

A4.00 INTERIOR ELEVATIONS & DETAILS

STRUCTURAL

S1.0 GENERAL STRUCTURAL NOTES

S2.0 TYPICAL DETAILS

MECHANICAL

M1.1 1st FLOOR PLUMBING & HV&AC DEMOLITION PLAN M1.2 2nd FLOOR PLUMBING & HV&AC DEMOLITION PLAN M1.3 3rd FLOOR PLUMBING & HV&AC DEMOLITION PLAN

M1.4 CORE HEATING WATER RISER DIAGRAMS

M1.5 WING-A HEATING WATER RISER DIAGRAMS

M1.6 WING-B HEATING WATER RISER DIAGRAMS

M2.1 1st FLOOR PLUMBING REVISIONS PLAN M2.2 2nd FLOOR PLUMBING REVISIONS PLAN M2.3 3rd FLOOR PLUMBING REVISIONS PLAN M3.1 1st FLOOR HV&AC REVISIONS PLAN M3.2 2nd FLOOR HV&AC REVISIONS PLAN M3.3 3rd FLOOR HV&AC REVISIONS PLAN

M4.1 DETAILS

M4.2 SCHEDULES & DETAILS

FIRE ALARM/MASS NOTIFICATION

FA0.00 NOTES AND LEGENDS

FA1.00 FIRST FLOOR DEMO PLAN

FA1.01 SECOND FLOOR DEMO PLAN

FA1.02 THIRD FLOOR DEMO PLAN

FA2.00 FIRST FLOOR NEW WORK PLAN

FA2.01 SECOND FLOOR NEW WORK PLAN

FA2.02 THIRD FLOOR NEW WORK PLAN

FA3.00 FIRST FLOOR NEW WORK PLAN

FA3.01 SECOND FLOOR NEW WORK PLAN

FA3.02 THIRD FLOOR NEW WORK PLAN

FA4.00 ELEVATION DETAILS

FA4.01 PANEL WIRING DETAILS

FA4.02 PANEL WIRING DETAILS

FA4.03 DEVICE WIRING DETAILS

FA5.00 NOTIFICATION RISER DIAGRAM

FA5.01 SLC RISER DIAGRAM

FA6.00 I/O MATRIX

FA7.00 NAC LOAD/LOSS CALCULATIONS

FA7.01 BATTERY CALCULATIONS

ELECTRICAL

E1.1 ELECTRICAL SITE PLAN

E2.1 1St FLOOR ELECTRICAL DEMO E2.2 2nd FLOOR ELECTRICAL DEMO E2.3 3rd FLOOR ELECTRICAL DEMO E3.1 1St FLOOR LIGHTING REMODEL E3.2 2nd FLOOR LIGHTING REMODEL E3.3 3rd FLOOR LIGHTING REMODEL E3.4 1St FLOOR POWER REMODEL E3.5 2nd FLOOR POWER REMODEL E3.6 3rd FLOOR POWER REMODEL

END OF TABLE OF CONTENTS

File details come from the government source that posted it. Updated .