About this file
Written by GovTribe AI
· Dec 29, 2023
This file describes a federal contract opportunity for the Malmstrom AFB Multiple Award Task Order Contract (MATOC). The solicitation number is FA462619RA014 and is being issued by the Department of the Air Force Global Strike Command. The opportunity is for an indefinite-delivery, indefinite-quantity contract to provide various construction services at Malmstrom Air Force Base. The period of performance is from the date of award through December 2024. The contract will include a base period of one year with four one-year option periods that may be exercised at the government's discretion.
From the source
Attach 6 Drawing M1.3. **M1.4 will be re-uploaded at a later date**
Other files for this federal contract opportunity
Other files attached to Malmstrom AFB Multiple Award Task Order Contract (MATOC), newest first.
File
Type
Posted
Q&A__5.docx
DOCX document
Aug 20, 2019
Amendment_1_FA462619RA0140001.pdf
PDF
Aug 19, 2019
Addendum__1.pdf
PDF
Aug 19, 2019
Specifications_-_Table_of_contents_(Amended).pdf
PDF
Aug 19, 2019
Q&A__4_Attachment_1_-_Cabinet_Bottom.pdf
PDF
Aug 19, 2019
Q&A__4.pdf
PDF
Aug 19, 2019
Q&A__4_Attachment_2_-_09_72_00_FL_-_Wall_Coverings.pdf
PDF
Aug 19, 2019
Q&A__3_Attachment_1_-_Irrigation_mainline_as-builts.PDF
PDF
Aug 15, 2019
Q&A__3.docx
DOCX document
Aug 15, 2019
Pre-Proposal_Conference_Sign-in_Roster.pdf
PDF
Aug 9, 2019
PreProposal_SiteVisit_Minutes.pdf
PDF
Aug 9, 2019
Q&A__2.docx
DOCX document
Aug 6, 2019
Q&A__2_Attachment_3_-_Drawing_M1.4_Bid_Docs_-_MAFB_Dorm_655.pdf
PDF
Aug 6, 2019
Q&A__2_Attachment_2_-_08_14_16_FL_-_FLUSH_WOOD_DOORS.pdf
PDF
Aug 6, 2019
Q&A__2_Attachment_1_-_Asbestos_Survey.pdf
PDF
Aug 6, 2019
Q&A__1.docx
DOCX document
Jul 25, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_2.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_8.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_6.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_5.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_7.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_3.pdf
PDF
Jul 23, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_4.pdf
PDF
Jul 23, 2019
Attach_2_Specifications_Repair_Dorm_655_Part_2.pdf
PDF
Jul 22, 2019
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_1.0.pdf
PDF
Jul 22, 2019
Attach_2_Specifications_Repair_Dorm_655_Part_4.pdf
PDF
Jul 22, 2019
Attach_2_Specifications_Repair_Dorm_655_Part_3.pdf
PDF
Jul 22, 2019
Attach_11_SECTION_L_Rev1.docx
DOCX document
Jul 22, 2019
Attach_12_SECTION_M_Revision_5.docx
DOCX document
Jul 22, 2019
Solicitation_-_FA462619RA014.pdf
PDF
Jul 22, 2019
Attach_13_Wage_Determinations.docx
DOCX document
Jul 22, 2019
Attach_9_Subcontractor_Consent_Rev_1.doc
DOC document
Jul 22, 2019
Attach_1_MATOC_Statement_of_Work_Rev2.doc
DOC document
Jul 22, 2019
Attach_5__Schedule_of_Drawings_Repair_Dorm_655.doc
DOC document
Jul 22, 2019
Attach_8_Past_Performance_Questionaire_Rev1.docx
DOCX document
Jul 22, 2019
Attach_4_Full_Submittal_Schedule_Repair_Dorm_655.xls
XLS spreadsheet
Jul 22, 2019
Attach_14_MATOC_Task_Order_Procedures_Rev4.docx
DOCX document
Jul 22, 2019
Attach_10_On-Off_Ramp_Procedures_Rev1.docx
DOCX document
Jul 22, 2019
Attach_7_Installation_Perimeter_Access_Control.pdf
PDF
Jul 22, 2019
Attach_2_Specifications_Repair_Dorm_655_Part_1.pdf
PDF
Jul 22, 2019
Attach_3_Bid_Schedule_Repair_Dorm_655.xlsx
XLSX spreadsheet
Jul 22, 2019
Show all 41
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Dec 29, 2023 .