About this file

This document outlines on-ramp and off-ramp procedures for the Malmstrom AFB Multiple Award Task Order Contract. The MATOC will be awarded to a pool of small business contractors who will compete for task orders to complete quality construction projects for the Department of the Air Force Global Strike Command. Incumbent contractors may be removed and replaced through an on-ramp process selecting from proposals submitted during the initial solicitation. Contractors' participation rates, reasons for non-participation, and CPARS ratings will be evaluated, with satisfactory ratings requiring at least 90% participation and ratings. Marginal ratings will be determined case by case, while unsatisfactory ratings result from less than 50% participation or an unsatisfactory CPARS rating and removal from competing for future task orders.

Attach 10 On-Off Ramp Procedures

View the file

Other files for this federal contract opportunity

Other files attached to Malmstrom AFB Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Q&A__5.docx DOCX document
Specifications_-_Table_of_contents_(Amended).pdf PDF
Q&A__4_Attachment_1_-_Cabinet_Bottom.pdf PDF
Q&A__4.pdf PDF
Q&A__4_Attachment_2_-_09_72_00_FL_-_Wall_Coverings.pdf PDF
Amendment_1_FA462619RA0140001.pdf PDF
Addendum__1.pdf PDF
Q&A__3_Attachment_1_-_Irrigation_mainline_as-builts.PDF PDF
Q&A__3.docx DOCX document
PreProposal_SiteVisit_Minutes.pdf PDF
Pre-Proposal_Conference_Sign-in_Roster.pdf PDF
Q&A__2.docx DOCX document
Q&A__2_Attachment_1_-_Asbestos_Survey.pdf PDF
Q&A__2_Attachment_3_-_Drawing_M1.4_Bid_Docs_-_MAFB_Dorm_655.pdf PDF
Q&A__2_Attachment_2_-_08_14_16_FL_-_FLUSH_WOOD_DOORS.pdf PDF
Attach_6_Drawing_M1.3.pdf PDF
Q&A__1.docx DOCX document
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_8.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_6.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_7.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_3.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_4.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_5.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_1.0.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_4.pdf PDF
Attach_9_Subcontractor_Consent_Rev_1.doc DOC document
Attach_1_MATOC_Statement_of_Work_Rev2.doc DOC document
Attach_5__Schedule_of_Drawings_Repair_Dorm_655.doc DOC document
Attach_8_Past_Performance_Questionaire_Rev1.docx DOCX document
Attach_4_Full_Submittal_Schedule_Repair_Dorm_655.xls XLS spreadsheet
Attach_14_MATOC_Task_Order_Procedures_Rev4.docx DOCX document
Attach_7_Installation_Perimeter_Access_Control.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_1.pdf PDF
Attach_3_Bid_Schedule_Repair_Dorm_655.xlsx XLSX spreadsheet
Attach_2_Specifications_Repair_Dorm_655_Part_3.pdf PDF
Attach_11_SECTION_L_Rev1.docx DOCX document
Attach_12_SECTION_M_Revision_5.docx DOCX document
Solicitation_-_FA462619RA014.pdf PDF
Attach_13_Wage_Determinations.docx DOCX document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 10

FA4626-19-R-A014

ON/OFF RAMP PROCEDURES

1 ON/OFF RAMP PROVISION

(a) This provision prescribes the process by which the Government will ensure an adequate number of awardees are available at all times to achieve effective competition on all task orders. The Government intends to maintain a pool of small business contractors with a proven track record for competing on and then delivering quality construction projects.

(b) Awardees are expected, in good faith, to participate in the task order competitions, and if successful, to deliver quality projects on time and at cost, to include management and supervision of subcontractors. If for any reason, an awardee cannot participate in a competition, the awardee shall provide written notice to the Government of the reason(s) for non-participation prior to proposal due date.

(c) Replacing MATOC Contractors (“On-Ramp”): Should one or more of the incumbent MATOC contractor’s be removed from the initial MATOC award, the government may select an offeror from the “on-ramp” program as a replacement. The “on-ramp” contractor(s) will be selected based on the initial integrated assessment of their proposal during the solicitation phase. The selected offeror will be subject to a performance validation review and must be active in SAM and found to be in compliance with the original MATOC solicitation. If the first selectee does not meet the previously stated requirements, the second “on-ramp” offeror that in accordance with the initial integrated assessment, will be given the opportunity to replace the departing MATOC prime contractor. This process will continue until an “on-ramp” offeror is selected as a prime contractor for the MATOC or until all “on-ramp” offerors have been evaluated. If found in compliance, the “on-ramp” contractor(s) may be offered a bi-lateral IDIQ contract with the original guaranteed minimum of $500.00 and allowed to compete on future task order projects. On Ramp pool contractors are not obligated to accept on ramping and may decline the government’s offer for any reason. If the offer is declined the government will proceed with an offer to the next available contractor.

(d) Performance Review (“Off-Ramp): Throughout the lifetime of the MATOC, the Government will evaluate each awardees’ participation rate, reason(s) for non-participation, and Contractor Performance Assessment Reporting System (CPARS) performance evaluations for task orders completed or in progress. An awardee rated as Satisfactory* may remain in the competition pool. Failure to participate in good faith and/or a task order performance assessment rating of Marginal** or Unsatisfactory*** under the CPARS rating system may result in the awardee being off-ramped from the multiple award contract. An off-ramp decision results in contractor removal from the MATOC competition pool and no further awards of task orders (using the methodology listed in the MATOC SOW under PERFORMANCE REVIEW).

RATING DEFINITIONS

*Satisfactory:

To receive a Satisfactory (S) rating, offeror must maintain 90% participation in all MATOC task order solicitations and maintain a Satisfactory or higher CPARS rating per task order.

** Marginal:

A Marginal (M) rating will be given if the offeror has a participation rating of less than 90% but more than 50% of all MATOC task order solicitations or a Marginal CPARS rating on any task order. Subsequently, the Contracting Officer shall make a determination regarding the continuance of any Contractor receiving a Marginal (M) rating. The Contractor may provide written documentation that identifies extenuating circumstances or a performance improvement plan for consideration by the Contracting Officer.

*** Unsatisfactory:

An Unsatisfactory (U) will be given if the offeror has a participation rating of less than 50% in all MATOC task order solicitations or an Unsatisfactory CPARS rating on any task order. The Contracting Officer shall make a determination regarding the continuance of any Contractor receiving an UNSATISFACTORY (U) rating. The Contractor may provide written documentation that identifies extenuating circumstances or a performance improvement plan for consideration by the Contracting Officer.

File details come from the government source that posted it. Updated .