This document provides a schedule of drawings for the repair of Dormitory 655 at Malmstrom Air Force Base under Solicitation FA462619RA014. Key details include specifications for architectural, structural, mechanical, fire alarm/mass notification, electrical, and plumbing renovations to modernize three floors of the dormitory. The schedule lists over 50 drawings covering site plans, demolition plans, renovation plans, finish plans, reflected ceiling plans, elevations, riser diagrams, and technical details. Renovations include updating HVAC, electrical, and plumbing systems as well as interior renovations. The solicitation is for a Multiple Award Task Order Contract to be awarded by the Department of the Air Force Global Strike Command.

Attach 5 Initial Task Order Schedule of Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Malmstrom AFB Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Q&A__5.docx DOCX document
Q&A__4.pdf PDF
Q&A__4_Attachment_2_-_09_72_00_FL_-_Wall_Coverings.pdf PDF
Specifications_-_Table_of_contents_(Amended).pdf PDF
Q&A__4_Attachment_1_-_Cabinet_Bottom.pdf PDF
Amendment_1_FA462619RA0140001.pdf PDF
Addendum__1.pdf PDF
Q&A__3_Attachment_1_-_Irrigation_mainline_as-builts.PDF PDF
Q&A__3.docx DOCX document
PreProposal_SiteVisit_Minutes.pdf PDF
Pre-Proposal_Conference_Sign-in_Roster.pdf PDF
Q&A__2.docx DOCX document
Q&A__2_Attachment_1_-_Asbestos_Survey.pdf PDF
Q&A__2_Attachment_2_-_08_14_16_FL_-_FLUSH_WOOD_DOORS.pdf PDF
Q&A__2_Attachment_3_-_Drawing_M1.4_Bid_Docs_-_MAFB_Dorm_655.pdf PDF
Attach_6_Drawing_M1.3.pdf PDF
Q&A__1.docx DOCX document
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_8.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_6.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_3.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_4.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_7.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_5.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_1.0.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_4.pdf PDF
Attach_4_Full_Submittal_Schedule_Repair_Dorm_655.xls XLS spreadsheet
Attach_14_MATOC_Task_Order_Procedures_Rev4.docx DOCX document
Attach_10_On-Off_Ramp_Procedures_Rev1.docx DOCX document
Attach_7_Installation_Perimeter_Access_Control.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_1.pdf PDF
Attach_3_Bid_Schedule_Repair_Dorm_655.xlsx XLSX spreadsheet
Attach_9_Subcontractor_Consent_Rev_1.doc DOC document
Attach_1_MATOC_Statement_of_Work_Rev2.doc DOC document
Attach_8_Past_Performance_Questionaire_Rev1.docx DOCX document
Attach_2_Specifications_Repair_Dorm_655_Part_3.pdf PDF
Attach_11_SECTION_L_Rev1.docx DOCX document
Attach_12_SECTION_M_Revision_5.docx DOCX document
Solicitation_-_FA462619RA014.pdf PDF
Attach_13_Wage_Determinations.docx DOCX document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR DORMITORY 655

NZAS 04-1042

MALMSTROM AFB, MT

FA4626-19-R-A014

SCHEDULE OF DRAWINGS

SD-1

ATTACHMENT 5

REPAIR DORMITORY 655

NZAS 04-1042

MALMSTROM AIR FORCE BASE, montana

FA4626-18-R-0030

Schedule of Drawings

DRAWINGS

COV

COVER SHEET

PROJECT INFORMATION

SHEET INDEX

VICINITY MAP

LEGEND AND ABBREVIATIONS

GENERAL NOTES

ARCHITECTURAL

A0.00

ARCHITECTURAL SITE PLAN

A1.00

FIRST FLOOR EXISTING/DEMOLITION PLAN

A1.01

SECOND FLOOR EXISTING/DEMOLITION PLAN

A1.02

THIRD FLOOR EXISTING/DEMOLITION PLAN

A2.00

FIRST FLOOR RENOVATION PLAN

A2.01

SECOND FLOOR RENOVATION PLAN

A2.02

THIRD FLOOR RENOVATION PLAN

A2.03

FIRST FLOOR FINISH PLAN

A2.04

SECOND FLOOR FINISH PLAN

A2.05

THIRD FLOOR FINISH PLAN

A2.06

FIRST FLOOR REFLECTED CEILING PLAN

A2.07

SECOND FLOOR REFLECTED CEILING PLAN

A2.08

THIRD FLOOR REFLECTED CEILING PLAN

A3.00

DEMOLITION EXTERIOR ELEVATIONS

A3.01

DEMOLITION EXTERIOR ELEVATIONS

A3.02

RENOVATION EXTERIOR ELEVATIONS

A3.03

RENOVATION EXTERIOR ELEVATIONS

A4.0

INTERIOR ELEVATIONS & DETAILS

STRUCTURAL

S1.0

GENERAL STRUCTURAL NOTES

S2.0

TYPICAL DETAILS

MECHANICAL

M1.1 1st FLOOR PLUMBING & HV&AC DEMOLITION PLAN M1.2 2nd FLOOR PLUMBING & HV&AC DEMOLITION PLAN

M1.3 3rd FLOOR PLUMBING & HV&AC DEMOLITION PLAN

M1.4 CORE HEATING WATER RISER DIAGRAMS

M1.5 WING-A HEATING WATER RISER DIAGRAMS

M1.6 WING-B HEATING WATER RISER DIAGRAMS

M2.1 1st FLOOR PLUMBING REVISIONS PLAN

M2.2 2nd FLOOR PLUMBING REVISIONS PLAN

M2.3 3rd FLOOR PLUMBING REVISIONS PLAN

M3.1 1st FLOOR HV&AC REVISIONS PLAN

M3.2 2nd FLOOR HV&AC REVISIONS PLAN

M3.3 3rd FLOOR HV&AC REVISIONS PLAN

M4.1 DETAILS

M4.2 SCHEDULES & DETAILS

FIRE ALARM/MASS NOTIFICATION

FA0.00

NOTES AND LEGENDS

FA1.00

FIRST FLOOR DEMO PLAN

FA1.01

SECOND FLOOR DEMO PLAN

FA1.02

THIRD FLOOR DEMO PLAN

FA2.00

FIRST FLOOR NEW WORK PLAN

FA2.01

SECOND FLOOR NEW WORK PLAN

FA2.02

THIRD FLOOR NEW WORK PLAN

FA3.00

FIRST FLOOR NEW WORK PLAN

FA3.01

SECOND FLOOR NEW WORK PLAN

FA3.02

THIRD FLOOR NEW WORK PLAN

FA4.00

ELEVATION DETAILS

FA4.01

PANEL WIRING DETAILS

FA4.02

PANEL WIRING DETAILS

FA4.03

DEVICE WIRING DETAILS

FA5.00

NOTIFICATION RISER DIAGRAM

FA5.01

SLC RISER DIAGRAM

FA6.00

I/O MATRIX

FA7.00

NAC LOAD/LOSS CALCULATIONS

FA7.01

BATTERY CALCULATIONS

ELECTRICAL

E1.1

ELECTRICAL SITE PLAN

E2.1 1St FLOOR ELECTRICAL DEMO E2.2 2nd FLOOR ELECTRICAL DEMO

E2.3 3rd FLOOR ELECTRICAL DEMO

E3.1 1St FLOOR LIGHTING REMODEL E3.2 2nd FLOOR LIGHTING REMODEL

E3.3 3rd FLOOR LIGHTING REMODEL

E3.4 1St FLOOR POWER REMODEL E3.5 2nd FLOOR POWER REMODEL

E3.6 3rd FLOOR POWER REMODEL

END OF SCHEDULE OF DRAWINGS