Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_1.0.pdf

PDF 7 MB Posted

Attached to
Malmstrom AFB Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA462619RA014
Issued by
Department of the Air Force Global Strike Command

About this file

This document package includes architectural drawings and specifications for repair and renovation work at Malmstrom Air Force Base Dormitory 655 under Multiple Award Task Order Contract FA462619RA014. The project scope involves replacing all exterior windows and doors with blast-resistant units; replacing gutters and downspouts; providing new interior finishes, flooring, countertops and accessories; and upgrading mechanical, electrical, and fire alarm systems. Renovation work includes installing new plastic laminate cabinetry, solid surface countertops and shower pans, and ceramic tile floors and walls. Mechanical plans show locations for new dryer vents and a mop sink. Electrical drawings cover lighting, power, and communications upgrades. Structural, fire protection, and architectural drawings provide demolition, new construction, and renovation details.

Attach 6 Initial Task Order Drawings Part 1 **PLEASE NOTE THAT THE REMAINING PORTIONS OF THE DRAWINGS WILL BE MADE AVAILABLE ASAP**

View the file

Other files for this federal contract opportunity

Other files attached to Malmstrom AFB Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Q&A__5.docx DOCX document
Amendment_1_FA462619RA0140001.pdf PDF
Addendum__1.pdf PDF
Q&A__4.pdf PDF
Q&A__4_Attachment_2_-_09_72_00_FL_-_Wall_Coverings.pdf PDF
Specifications_-_Table_of_contents_(Amended).pdf PDF
Q&A__4_Attachment_1_-_Cabinet_Bottom.pdf PDF
Q&A__3_Attachment_1_-_Irrigation_mainline_as-builts.PDF PDF
Q&A__3.docx DOCX document
Pre-Proposal_Conference_Sign-in_Roster.pdf PDF
PreProposal_SiteVisit_Minutes.pdf PDF
Q&A__2_Attachment_2_-_08_14_16_FL_-_FLUSH_WOOD_DOORS.pdf PDF
Q&A__2_Attachment_3_-_Drawing_M1.4_Bid_Docs_-_MAFB_Dorm_655.pdf PDF
Q&A__2.docx DOCX document
Q&A__2_Attachment_1_-_Asbestos_Survey.pdf PDF
Attach_6_Drawing_M1.3.pdf PDF
Q&A__1.docx DOCX document
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_5.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_3.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_4.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_2.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_8.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_6.pdf PDF
Attach_6_Drawing_FULL_Set_Repair_Dorm_655_Part_7.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_3.pdf PDF
Attach_11_SECTION_L_Rev1.docx DOCX document
Attach_12_SECTION_M_Revision_5.docx DOCX document
Solicitation_-_FA462619RA014.pdf PDF
Attach_13_Wage_Determinations.docx DOCX document
Attach_4_Full_Submittal_Schedule_Repair_Dorm_655.xls XLS spreadsheet
Attach_14_MATOC_Task_Order_Procedures_Rev4.docx DOCX document
Attach_10_On-Off_Ramp_Procedures_Rev1.docx DOCX document
Attach_7_Installation_Perimeter_Access_Control.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_1.pdf PDF
Attach_3_Bid_Schedule_Repair_Dorm_655.xlsx XLSX spreadsheet
Attach_2_Specifications_Repair_Dorm_655_Part_2.pdf PDF
Attach_2_Specifications_Repair_Dorm_655_Part_4.pdf PDF
Attach_9_Subcontractor_Consent_Rev_1.doc DOC document
Attach_1_MATOC_Statement_of_Work_Rev2.doc DOC document
Attach_5__Schedule_of_Drawings_Repair_Dorm_655.doc DOC document
Attach_8_Past_Performance_Questionaire_Rev1.docx DOCX document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OWNER:

Malmstrom Air Force BaseMalmstrom Air Force BaseMalmstrom Air Force BaseMalmstrom Air Force Base Great Falls, MT

ARCHITECTS:

SMA Architects P.C.SMA Architects P.C.SMA Architects P.C.SMA Architects P.C.

2625 Winne Avenue | Suite 1 Helena, MT 59601 P: 406.442.4933 F: 406.442.4936 Peter Rudd

ENGINEERS:

Structural: Structural: Structural: Structural:

TD&H Engineering 1800 River Drive North Great Falls, MT 59401 P: 406.761.3010 F: 406.727.2872 Scott Mahurin, PE, SE

Mechanical:Mechanical:Mechanical:Mechanical:

Design3 Engineering 1211 24th Street West | Suite 7 Billings, MT 59102 P: 406.245.5599 F: 406.245.9830 Bob Scott, P.E.

Electrical:Electrical:Electrical:Electrical:

TESLa Engineering, LLC P.O. Box 504 Vaughn, MT 59487 P: 406.964.8523 Tava Owens, P.E.

Fire Protection:Fire Protection:Fire Protection:Fire Protection:

Coffman Engineers, Inc.

2011 N 22nd Ave. #4 Bozeman, MT 59718 P: 406.582.1936 Jason Anderson, P.E.

PROJECT TEAM

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

Project No. NZAS 04-1042

PROJECT ADDRESS

ATTACHMENT 6

/5 /2

:0

:2 P

M

COV

03.02.2018

TJR

TM

Cover Sheet

Repair Dormitory 655

PR

Repair Dormitory 655 Bidding Documents (IFB) | 03.02.2018

Malmstrom Air Force Base

Repair Dormitory 655

COV

Bidding Documents (IFB)

SHEET INDEX

A1.4

SECTION NUMBER

N

A1.3 View Scale

View Callout

A1.4

A1.4

A4.1 8

A1.4

301D

A

View Callout North Arrow

Exterior Elevation Callout

Exterior Wall Type Symbol

Building Section Callout

Wall Section Callout

Interior Elevation Callout

Detail View Callout

Door Type Symbol

Window Type Symbol

Interior Wall Type Symbol

Keynote Callout

Level Callout

Floor Level 100'-0"

EW-1

1A

SHEET NUMBER

DIRECTION OF CUT PROJECT NORTH

SECTION NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

DIRECTION OF CUT

DETAIL NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

DIRECTION OF CUT

VIEW NUMBER

SHEET NUMBER

DIRECTION OF VIEW

LEVEL TITLE

LEVEL ELEVATION

SHEET LEGEND

1. CONTRACTOR IS TO VERIFY THE LOCATIONS OF THE EXISTING UTILITIES AND OTHER SERVICE CONNECTIONS AND EXISTING SITE CONDITIONS AND FACILITIES PRIOR TO CONSTRUCTION. CONTRACTOR IS TO NOTIFY

CONTRACTING OFFICER WITH ANY DISCREPANCIES.

2. THE SITE AND EXISTING DORMITORY BUILDING WILL REMAIN UNOCCUPIED THROUGHOUT THE COURSE OF CONSTRUCTION, CONTRACTOR SHALL MINIMIZE DISRUPTIONS TO PERSONNEL, CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY SITE/BUILDING AREA AND ENSURE HAZARDOUS AREAS ARE NOT ACCESSIBLE.

3. IF WORK WILL DISRUPT A PORTION OF THE EXISTING FACILITY, CONTRACTOR IS RESPONSIBLE FOR

COORDINATING AND COMMUNICATING THE DISRUPTIVE WORK WITH THE CONTRACTING OFFICER.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY FACILITIES DURING CONSTRUCTION. ALL WORK SHALL BE CONFINED TO THE IMMEDIATE AREA SURROUNDING THE CONSTRUCTION SITE, MOBILIZATION/ STORAGE/ PARKING AREAS SHALL BE COORDINATED WITH CONTRACTING OFFICER. CONTRACTOR SHALL RESTORE MOBILIZATION/ STAGING/ STORAGE AREAS TO ORIGINAL CONDITION UPON COMPLETION OF THE PROJECT.

5. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE FLAGGING, TEMPORARY FENCING, ETC. REQUIRED FOR A SAFE USE OF THE SITE DURING THE COURSE OF THE PROJECT. THE CONTRACTOR TO PROVIDE ALL SIGNAGE, BARRICADES, FLAGMEN, TEMPORARY FENCING AND SIGNAGE REQUIRED TO PROVIDE SAFE TRAVEL & EXITING TO

THE PUBLIC / STAFF.

GENERAL NOTES

TYPICAL ABBREVIATIONS

A.F.F. ABOVE FINISHED FLOOR

A.I.B. AIR INFILTRATION BARRIER

ACT ACOUSTIC CEILING TILE

ADD./ ALT. ADDITIVE ALTERNATE

ALUM. ALUMINUM

ARCH. ARCHITECT/ ARCHITECTURAL

ASSEMB. ASSEMBLY

B.O. BOTTOM OF

BLDG. BUILDING

BRD. BOARD

BYND. BEYOND

CJP COMPLETE JOINT PENETRATION

CLR. CLEAR

CMU CONCRETE MASONRY UNIT

COL(S). COLUMN(S)

COMP. COMPOSITE

CONC. CONCRETE

CONT. CONTINUOUS

CONT. CONTRACTOR

CONST. CONSTRUCTION

COORD. COORDINATE

CY CUBIC YARDS

DEF. DEFINITION

DEMO. DEMOLISH

DTL.(S) DETAIL OR DETAILS

(E) EXISTING

EA. EACH

E.W. EXTERIOR WALL

ELEC. ELECTRICAL

ELEV. ELEVATION

EQUIP. EQUIPMENT

EXT. EXTERIOR

EXT. EXTRUDED

F.F. FLOOR FINISH

F.F.L. FINISHED FLOOR LEVEL

FT. FOOT

FIN. FINISHED

FOUND. FOUNDATION

FRP FIBERGLASS REINFORCED PANEL

G.A. GYPSUM ASSOCIATION

GWB GYPSUM WALL BOARD

GYP BOARD GYPSUM WALL BOARD

H.M. HOLLOW METAL

HORIZ. HORIZONTAL

HR. HOUR

HWR HOT WATER RETURN

HWS HOT WATER SEND

INFIL. INFILTRATION

INSUL. INSULATION OR INSULATED

INT. INTERIOR

LAV. LAVATORY

LOC. LOCATION

MAT. MATERIAL

MECH. MECHANICAL/ MECHANICALLY

MEMB. MEMBRANE

MFR. MANUFACTURER

MIN. MINIMUM

MISC. MISCELLANEOUS

MTL. METAL

(N) NEW

NEC. NECESSARY

NIC NOT IN CONTRACT

NOM. NOMINAL

O/ OVER

O.C. ON CENTER

OSB ORIENTED STRAND BOARD

PERIM. PERIMETER

P-LAM. PLASTIC LAMINATE

PLYWD. PLYWOOD

PREFIN. PREFINISHED

PRE-MAN. PRE-MANUFACTURED

PSF POUNDS PER SQUARE FOOT

RA RETURN AIR

R/C ROOF/ CEILING

RECOMM. RECOMMENDATIONS

REQ. REQUIRED/REQUIREMENTS

SA SEND AIR

S.C. SOLID CORE

SCHED. SCHEDULE

SHEATH. SHEATHING

SPEC. SPECIFICATION

SQ. SQUARE

STD. STANDARD

STL. STEEL

STRUCT. STRUCTURAL

TEMP. TEMPORARY

THROUGH. THROUGHOUT

T.O. TOP OF

TYP. TYPICAL

UH UNIT HEATER

U.L. UNDERWRITERS LABORATORIES

U.N.O. UNLESS NOTED OTHERWISE

V.B. VAPOR BARRIER

VERT. VERTICAL

VEST. VESTIBULE

VFY. VERIFY

W/ WITH

WD. WOOD

WIND. WINDOW

WWF WELDED WIRE FABRIC

6. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PERTINENT PHYSICAL STRUCTURES, INCLUDING TREES, IN THE CONSTRUCTION AREA OF THE SITE AND FOR PROVIDING PROPER PROTECTION OF THESE ITEMS DURING

THE CONSTRUCTION PHASE.

7. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING SOD, LANDSCAPING, SIDEWALKS AND SITE FEATURES ADJACENT TO THE BUILDING THAT ARE NOT BEING DEMOLISHED OR REMOVED FROM DAMAGE DURING THE COURSE OF CONSTRUCTION AND FOR THE REPAIR/ REPLACEMENT OF ANY AND ALL DAMAGED FEATURES

UPON COMPLETION OF THE PROJECT.

8. CONTRACTOR QUALITY CONTROL MANAGER IS RESPONSIBLE FOR ORGANIZING/ COORDINATING ALL NECESSARY ON-SITE INSPECTIONS REQUIRED BY GOVERNMENT PERMITTING AGENCIES FOR ALL TRADES

THROUGHOUT CONSTRUCTION.

9. THE CONTRACTORS SHALL BE COGNIZANT OF THE FACT THAT SPECIAL CARE IS REQUIRED DURING THE CONDUCTANCE OF THIS PROJECT. SPECIAL CONSIDERATION SHOULD BE GIVEN TO PROCEDURES WHERE THE EXISTING BUILDING FABRIC IS CUT OR PATCHED, AND PROVISIONS SHALL BE IMPLEMENTED TO PROTECT THOSE AREAS OF THE MAF BUILDING THAT ARE NOT DIRECTLY AFFECTED BY THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL INSPECT THE PROPOSED PROJECT SITE AND CONDITIONS PRIOR TO SUBMISSION OF THEIR PROPOSAL. THE DRAWINGS ARE REPRESENTATIVE OF THE WORK TO BE CONDUCTED, HOWEVER, NOT ALL CONDITIONS ARE DETAILED OR REPRESENTED THAT MAY BE NECESSARY TO COMPLETE THE INTENDED WORK.

N N

VICINITY MAP SITE MAP

Great Falls, MT Malmstrom A.F. Base

Project LocationMalmstrom A.F. Base

Architectural Drawings 2 of 64 A0.00 Architectural Site Plan

3 of 64 A1.00 First Floor Existing/Demolition Plan

4 of 64 A1.01 Second Floor Existing/Demolition Plan

5 of 64 A1.02 Third Floor Existing/Demolition Plan

6 of 64 A2.00 First Floor Renovation Plan

7 of 64 A2.01 Second Floor Renovation Plan

8 of 64 A2.02 Third Floor Renovation Plan

9 of 64 A2.03 First Floor Finish Plan

10 of 64 A2.04 Second Floor Finish Plan

11 of 64 A2.05 Third Floor Finish Plan

12 of 64 A2.06 First Floor Reflected Ceiling Plan

13 of 64 A2.07 Second Floor Reflected Ceiling Plan

14 of 64 A2.08 Third Floor Reflected Ceiling Plan

15 of 64 A3.00 Demolition Exterior Elevations

16 of 64 A3.01 Demolition Exterior Elevations

17 of 64 A3.02 Renovation Exterior Elevations

18 of 64 A3.03 Renovation Exterior Elevations

19 of 64 A4.00 Interior Elevations

Mechanical Drawings 22 of 64 M1.1 1st FLOOR PLUMBING & HV&AC DEMOLITION PLAN

23 of 64 M1.2 2nd FLOOR PLUMBING & HV&AC DEMOLITION PLAN

24 of 64 M1.3 3rd FLOOR PLUMBING & HV&AC DEMOLITION PLAN

25 of 64 M1.4 CORE HEATING WATER RISER DIAGRAMS

26 of 64 M1.5 WING-A HEATING WATER RISER DIAGRAMS

27 of 64 M1.6 WING-B HEATING WATER RISER DIAGRAMS

28 of 64 M2.1 1st FLOOR PLUMBING REVISIONS PLAN

29 of 64 M2.2 2nd FLOOR PLUMBING REVISIONS PLAN

30 of 64 M2.3 3rd FLOOR PLUMBING REVISIONS PLAN

31 of 64 M3.1 1st FLOOR HV&AC REVISIONS PLAN

32 of 64 M3.2 2nd FLOOR HV&AC REVISIONS PLAN

33 of 64 M3.3 3rd FLOOR HV&AC REVISIONS PLAN

34 of 64 M4.1 SCHEDULES

35 of 64 M4.2 SCHEDULES & DETAILS

Electrical Drawings 55 of 64 E1.1 ELECTRICAL SITE PLAN

56 of 64 E2.1 1st FLOOR ELECTRICAL DEMO

57 of 64 E2.2 2nd FLOOR ELECTRICAL DEMO

58 of 64 E2.3 3rd FLOOR ELECTRICAL DEMO

59 of 64 E3.1 1st FLOOR LIGHTING REMODEL

60 of 64 E3.2 2ND FLOOR LIGHTING REMODEL

61 of 64 E3.3 3RD FLOOR LIGHTING REMODEL

62 of 64 E3.4 1ST FLOOR POWER REMODEL

63 of 64 E3.5 2ND FLOOR POWER REMODEL

64 of 64 E3.6 3RD FLOOR POWER REMODEL

Structural Drawings 20 of 64 S1.0 GENERAL STRUCTURAL NOTES

21 of 64 S2.0 STRUCTRUAL DETAILS

Fire Protection Drawings 36 of 64 FA0.00 NOTES AND LEGENDS

37 of 64 FA1.00 FIRST FLOOR DEMO PLAN

38 of 64 FA1.01 SECOND FLOOR DEMO PLAN

39 of 64 FA1.02 THIRD FLOOR DEMO PLAN

40 of 64 FA2.00 FIRST FLOOR NEW WORK PLAN

41 of 64 FA2.01 SECOND FLOOR NEW WORK PLAN

42 of 64 FA2.02 THIRD FLOOR NEW WORK PLAN

43 of 64 FA3.00 FIRST FLOOR LOC ROUTING PLAN

44 of 64 FA3.01 SECOND FLOOR LOC ROUTING PLAN

45 of 64 FA3.02 THIRD FLOOR LOC ROUTING PLAN

46 of 64 FA4.00 ELEVATION DETAILS

47 of 64 FA4.01 PANEL WIRING DETAILS

48 of 64 FA4.02 PANEL WIRING DETAILS

49 of 64 FA4.03 DEVICE WIRING DETAILS

50 of 64 FA5.00 NOTIFICATION RISER DIAGRAM

51 of 64 FA5.01 SLC RISER DIAGRAM

52 of 64 FA6.00 I/O MATRIX

53 of 64 FA7.00 NAC LOAD/LOSS CALCULATIONS

54 of 64 FA7.01 BATTERY CALCULATIONS

1. CONTRACTOR IS TO PHOTOGRAPH AND DOCUMENT ALL EXISTING FIXTURES AND FURNISHINGS PRESENT

THROUGHOUT THE BUILDING PRIOR TO REMOVAL.

2. CONTRACTOR TO REMOVE ALL FIXTURES AND FURNISHINGS THROUGHOUT THE BUILDING PRIOR TO

COMMENCEMENT OF THE PROJECT.

3. CONTRACTOR IS TO TRANSPORT AND STORE ALL FIXTURES AND FURNISHINGS OFF SITE AND OFF MALMSTROM

AIR FORCE BASE.

4. STORAGE AREA TO BE WEATHER TIGHT AND CONTENTS TO BE INSURED.

5. THE CONTRACTOR IS TO TRANSPORT AND REINSTALL ALL FIXTURES AND FURNISHINGS TO THEIR ORIGINAL

LOCATIONS AT THE COMMENCEMENT OF THE PROJECT PRIOR TO FINAL INSPECTION.

FIXTURES AND FURNISHINGS NOTES

Cover - Cover Sheet 1 of 64 COV Cover Sheet

PROJECT TITLED: “REPAIR DORMITORY 655, PROJECT NO. NZAS 04-1042.” THIS

PROJECT PROVIDES FOR THE REPLACEMENT OF ALL EXTERIOR WINDOWS AND DOORS

WITH BLAST RESISTANT UNITS COMPLIANT WITH AT/FP STANDARDS AND THE REQUIRED

ASSOCIATED STRUCTURAL IMPROVEMENTS AND INTERIOR/EXTERIOR WORK NEEDED

FOR THEIR INSTALLATION, THE REPLACEMENT OF THE GUTTER AND DOWNSPOUT

SYSTEMS, NEW INTERIOR FINISHES SUCH AS PAINTING, FLOORING, COUNTER TOPS AND

ACCESSORIES, CABINETRY, AND UPGRADES TO THE MECHANICAL, ELECTRICAL, AND

FIRE ALARM/NOTIFICATION SYSTEMS AS STATED IN THE SOW AND ITS AMENDMENT.

PROJECT SUMMARY

FA4626-19-R-A014

1st Avenue North1st Avenue North1st Avenue North1st Avenue North th S tr ee t N or th th S tr ee t N or th th S tr ee t N or th th S tr ee t N or th

PARKINGPARKINGPARKINGPARKING

P A

R K

IN

G

P A

R K

IN

G

P A

R K

IN

G

P A

R K

IN

G

DORMITORY 655 BUILDINGDORMITORY 655 BUILDINGDORMITORY 655 BUILDINGDORMITORY 655 BUILDING

167' STANDOFF DISTANCE 167' STANDOFF DISTANCE 167' STANDOFF DISTANCE 167' STANDOFF DISTANCE ---- METAL METAL METAL METAL

STUDS/ EIFS, SECOND & THIRD FLOORSTUDS/ EIFS, SECOND & THIRD FLOORSTUDS/ EIFS, SECOND & THIRD FLOORSTUDS/ EIFS, SECOND & THIRD FLOOR

82' STANDOFF DISTANCE 82' STANDOFF DISTANCE 82' STANDOFF DISTANCE 82' STANDOFF DISTANCE ---- METAL METAL METAL METAL

STUDS/ CMU VENEER, FIRST FLOORSTUDS/ CMU VENEER, FIRST FLOORSTUDS/ CMU VENEER, FIRST FLOORSTUDS/ CMU VENEER, FIRST FLOOR

0 80'-0" 120'-0"40'-0"

Graphic Scale: 1" = 40'-0"

Door Type 1 Door Type 2

Blast-Resistant H.M.

Double Door

Insul.

Blast-Resistant H.M.

Single Door

Insul.

S

EE

S C

H

ED

U

LE

SEE SCHEDULE

S

EE

S C

H

ED

U

LE

SEE SCHEDULE

Door Type 3

Blast-Resistant H.M.

Double Door

Insul. W/ Glazing

2' -6

6"

S

EE

S C

H

ED

U

LE

6" 6" 6" 6"

SEE SCHEDULE

Door Type 4

Blast-Resistant H.M.

Single Door

Insul. W/ Glazing

6" 2'

-6

S

EE

S C

H

ED

U

LE

6" 6"

SEE SCHEDULE

Door Type 5

S.C. Wood Single Door

Interior Replacement

Frame Type 1

Blast-Resistant Insul.

H.M.

Frame Type 2

2nd Floor Day Room H.M. 20-Min.

A3.02

A3.02

Window Type A Blast-Resistant Aluminum

Window

A3.02

A3.02

A3.02

A3.02

A3.02

A3.02

4' -0

4'-8"

Window Type B Blast-Resistant Aluminum

Window

A3.02

A3.02

A3.02

A3.02

A3.02

A3.02

4' -0

2'-0"

A3.02

A3.02

A3.02

A3.02

A3.02

A3.02

Window Type C Blast-Resistant Aluminum

Window

A3.02

7' -4

5'-0"6'-2"

2' -0

5'

-4

11'-2"

1. ‘TL’ = TEMPERED LAMINATE GLAZING – SEE SPEC SECTION 088000 FOR BLAST

RESISTANT GLAZING

2. ALL ALUMINUM FRAMES TO BE FACOTRY FINISHED – SEE SPEC

3. ALL H.M. DOORS AND FRAMES TO RECEIVE PAINT FINISH – SEE SPEC.

4. CONTRACTOR TO COORDINATE AND VERIFY FRAME DEPTH AT EACH OPENING

W/WALL TYPE AND DEPTH OF FRAMING

5. VERIFY ALL EXISTING OPENING CONDITIONS/DIMENSIONS ON SITE PRIOR TO THE

SUBMITTAL OF SHOP DRAWINGS

General Notes - Door/Frame Type

1. Dimensions are typically taken to grid, face of masonry, face of concrete, face of stud or door/window openings.

Dimensions to openings are nominal, verify all existing conditions and opening sizes and coordinate with room opening requirements.

2. Existing construction to remain is shown half-tone, typ.

3. See sheet A3.02 for all door and window details.

4. See sheet A0.00 for all door, frame, and window types.

5. Seal, secure, and protect all openings during construction and before leaving site to protect building from any weather damage.

6. Maintain all required exit ways and provide signage to the next closest exit during construction work hours. All required exits shall be operable during non-construction work hours.

7. Coordinate with base security for exit interruptions and security connections and tie ins at all times, as required.

8. All new windows to be prefinished aluminum units, doors and frames to be painted, insulated, hollow metal units, with operability as indicated. See specifications for blast resistance requirements and anchorage.

9. Due to the nature of the window and door replacement project for Building 655, the contractor is responsible for verifying all dimensions, conditions, etc. prior to and during conductance of the project. Plans and details are based on field observations and measurements. Not all conditions may be shown or detailed. Notify contracting officer immediately of any discrepancies or unforeseen conditions encountered during conductance of the project.

General Notes - Window & Exterior Door Replacement

FACILITY IS AN EXISTING THREE STORY, APPROXIMATELY 40 FOOT HIGH, 38,000 SQUARE FOOT BUILDING, CONSTRUCTED WITH A STEEL

STRUCTURAL FRAME AND STEEL STUDS.

NO CHANGE IN USE, OCCUPANCY, CLASSFICATIONS, OR MEANS OF EGRESS IN THIS PROJECT.

APPLICABLE CODES AND STANDARDS FOR THIS REVIEW:

2015 INTERNATIONAL BUILDING CODE (IBC)

UFC 3-600-01

NFPA 101

OTHER CODES AND STANDARDS APPLY TO OTHER DISCIPLINES BEYOND THOSE INCLUDED HERE. SEE PLANS AND SPECIFICATIONS FOR

OTHER DISCIPLINES.

PER IBC CHAPTER 3, BUILDING IS CLASSFIED AS R-2 OCCUPANCY. SECTION 310 – RESIDENTIAL OCCUPANCIES CONTAINING SLEEPING UNITS OR MORE THAN TWO DWELLING UNITS WHERE THE OCCUPANTS ARE PRIMARILY PERMANENT IN NATURE.

PER NFPA 101, CHAPTER 30, NEW APARTMENT BUILDING.

PER IBC TABLE 601, BUILDING IS CLASSIFIED AS TYPE VB CONSTRUCTION.

PER UFC 3-600-01, CLASSFIED AT TYPE VB AS WELL.

PER UFC 3-600-01, REFERENCING IBC, BUILDING HEIGHT AND AREA COMPLIES. 3 STORIES/60 FEET MAX; EXISTING IS 3

STORIES/APPROXIMATELY 40 FEET.

PER IBC SECTION 506, ALLOWABLE INCREASES IN AREA DUE TO FRONTAGE INCREASE, AND INCREASE DUE TO SPRINKLERING, PROJECT COMPLIES. MAXIMUM ALLOWABLE AREA IS 78,750 SF; ACUTAL BUILDING IS APPROXIMATELY 40,000 SF.

PER UFC 3-600-01, 2-1.3, AND IBC TABLE 601, THERE ARE NO REQUIRED FIRE RESISTANCE RATINGS FOR A SPRINKLERED TYPE VB

CONSTRUCTION FOR LISTED BUILDING ELEMENTS.

PER NFPA 101, AND IBC 707.4, 1-HR RATED SHAFTS ARE REQUIRED AT EXIT STAIRS, ELEVATOR SHAFTS, AND MECHANCIAL SHAFTS.

PROJECT COMPLIES.

PER NFPA 101, 30.3.6, CORRIDORS SERVING AS THE MEANS OF EGRESS ARE REQUIRED TO HAVE A 1-HR RATING WITH 20 MINUTE DOORS.

PROJECT COMPLIES. AT CORRIDOR AREAS WHERE EXISTING GWB IS TO BE REMOVED, PATCHED, AND/OR REPLACED, NEW INSTALLED GWB TO BE 5/8” TYPE X TO MAINTAIN EXSITING CONSTRUCTION AND RATING. PROJECT COMPLIES.

PER NFPA 101, 30.3.7.2 (IBC 708.3, EXCEPTION 2) WITH AN NFPA 13 SPRINKLER SYSTEM, DWELLING UNIT SEPARATION IS REQUIRED.

PARTITIONS ARE TO BE ½-HR RATED BEETWEEN UNITS. HORIZONTAL ASSEMBLIES ARE REQURIED WITH A MINIMUM 1/2=-HR RATING PER NFPA 101 30.3.7.2 (IBC 711.3, EXCEPTION 1). IN ALL AREAS WHERE EXISTING GWB AT WALLS AND CEILINGS IS TO BE REMOVED, PATCHED, OR REPLACED, NEW GWB TO BE INSTALLED TO BE 5/8” TYPE X TO MAINTAIN EXISTING CONSTRUCTION AND RATING. PROJECT

COMPLIES.

PER UFC 3-600-01, 6-1.6, SHOPS, LAUNDRY AREAS, AND OTHER HAZARDOUS AREAS TO BE PROTECTED PER NFPA 101 TABLE

30.3.2.1.1. COMPLIANCE IS SUMMARIZED IN THE FOLLOWING TABLE. THESE REQUIREMENTS ALSO MEET AND EXCEED THE INCIDENTAL

USE SEPARATION REQUIREMENTS OF IBC PARA 508.2 AND TABLE 508.2.

Code Review

EXISTING LAUNDRY AND MECHANCIAL ROOMS ARE SEPARATED BY THE REQUIRED 1-HR CONSTRUCTION AND RATED DOORS AND

COMPLY.

PER NFPA 101, 8.6.6, THE DAY ROOM REQUIRES RATED CONSTRUCTION AND PROTECTED OPENINGS PER NFPA 8.6.6(4). THE ENTRANCE

DOOR TO THE DAY ROOM AT THE SECOND FLOOR WILL BE REPLACED WITH A COMPLIANT DOOR.

BUILDING IS COMPLIANT WITH NFPA 101 REQUIREMENTS FOR NUMBER OF EXITS AND EXIT CAPACITY, TRAVEL DISTANCE, AND STAIRWAY

EGRESS.

Hazardous Area DescriptionHazardous Area DescriptionHazardous Area DescriptionHazardous Area Description Hazardous Area DescriptionHazardous Area DescriptionHazardous Area DescriptionHazardous Area Description Provided by ProjectProvided by ProjectProvided by ProjectProvided by Project

Boiler and fuel-fired heater rooms serving more than a single dwelling unit

1 hour and sprinklers 1 hour and sprinklers

Employee locker rooms 1 hour or sprinklers N/A

Gift or retail shops 1 hour or sprinklers N/A

Bulk laundries 1 hour and sprinklers N/A

Laundries less than or equal to 100 SF outside of dwelling units

1 hour or sprinklers N/A

Maintenance shops 1 hour and sprinklers N/A

Storage rooms outside of dwelling units

1 hour or sprinklers Sprinklers

Laundries greater than 100 SF outside of dwelling units

1 hour and sprinklers 1 hour and sprinklers

Trash collection rooms 1 hour and sprinklers N/A

Horizontal Assemblies

(E) 4" CONC. SLAB O/STEEL DECKING

(E) SUSPENDED STEEL STUD FRAMING FOR GWB CLG.

(N) OR (E) 5/8" TYPE X GWB CEILING

TYPICAL HORIZONTAL FLOOR-CEILING

ASSEMBLY AT FIRST AND SECOND

FLOORS

UL D503 - 2-HR RATING

EXCEEDS REQUIRED 1-HR AT LAUNDRY

AND MECHANICAL, 20-MIN AT

ASSEMBLIES BETWEEN DWELLING UNITS

(E) MTL ROOFING O/STEEL DECKING

(E) STEEL STUD FRAMING FOR GWB CLG.

(N) OR (E) 5/8" TYPE X GWB CEILING

TYPICAL ROOF-CEILING ASSEMBLY AT

THIRD FLOOR

UL P523 SIM - 1-HR RATING MIN.

EXCEEDS REQUIRED 1-HR AT LAUNDRY

AND MECHANICAL, 20-MIN AT

ASSEMBLIES BETWEEN DWELLING UNITS

(E) LIGHT GAUGE STEEL STUD TRUSSES

(E) WIRE SUPPORTED BLANKET INSUL.

Concrete Walk Section Detail

(N) 4" CONC. SIDEWALK O/(N) GRAVEL

BASE COURSE AS REQ. TO MATCH (E)

ADJACENT - VERIFY

RESTORE SLOPE OF (E) GRADE &

LANDSCAPING - VERIFY

2% MAX CROSS SLOPE -

MATCH (E) - VERIFY

MIN. 6" THICKENED EDGE TYP.

1. See sheet A0.00 for all door, frame, and window types.

2. Contractor to assume 25% interior door replacement (Door Type 5) for bidding purposes.

3. Contractor to field verify and document existing condition of all interior wood doors present to determine actual number that require replacement, and coordinate with Contracting Officer.

4. Due to the nature of the window and door replacement project for Building 655, the contractor is responsible for verifying all dimensions, conditions, etc. prior to and during conductance of the project. Plans and details are based on field observations and measurements. Not all conditions may be shown or detailed. Notify contracting officer immediately of any discrepancies or unforeseen conditions encountered during conductance of the project.

General Notes - Interior Door Replacement

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

AMENDMENT 6

/5 /2

:4

:0 P

M

A0.00

03.02.2018

Author

Checker

Architectural Site Plan

Repair Dormitory 655

Designer

A0.00

Bidding Documents (IFB)

N

1" = 40'-0"A0.00

1111 Architectural Site Plan - Standoff Distances & Sidewalk Replacement

Door Types Frame Types

Window Types - Contractor to field verify all rough opening dimensions

Keynotes - Sidewalks 1 Replace existing concrete sidewalk – remove existing sidewalk to nearest joints, replace with new to match existing adjacent finish. See specifications for concrete. Contractor to field verify dimensions of sidewalk area ( approximately 50 SF).

2 Replace existing concrete sidewalk – remove existing sidewalk to nearest joints, replace with new to match existing adjacent finish. Match existing curved layout. See specifications for concrete. Contractor to field verify dimensions of sidewalk area ( approximately 50 SF) and geometry of curved layout.

DOOR TYPES APPLY TO ALL DOORS TO BE

REMOVED/REPLACED. SEE FLOOR PLANS ON

SHEETS A2.00, A2.01, A2.02, AND EXTERIOR

ELEVATIONS ON SHEETS A3.02, A3.03.

FRAME TYPES APPLY TO ALL DOORS TO BE

REMOVED/REPLACED. SEE FLOOR PLANS ON

SHEETS A2.00, A2.01, A2.02, AND EXTERIOR

ELEVATIONS ON SHEETS A3.02, A3.03.

WINDOW TYPES APPLY TO ALL WINDOWS TO

BE REMOVED/REPLACED. SEE FLOOR PLANS

ON SHEETS A2.00, A2.01, A2.02, AND EXTERIOR

ELEVATIONS ON SHEETS A3.02, A3.03.

UP

REF. REF. REF. REF.

REF. REF. REF. REF.

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

UP

D D

D D

W W

W W

R E

F

D D

D D

W W

W W

AAAA AAAA

BBBB BBBB

A3.00

A3.01 2

A3.00

A3.011

10101010

10101010

11111111

11111111

12121212

12121212

13131313

13131313

14141414

14141414

15151515

15151515

16161616

16161616

17171717

17171717

18181818

18181818

CCCC CCCC

DDDD DDDD

EEEE EEEE

FFFF FFFF

GGGG GGGG

HHHH HHHH

IIII IIII

JJJJ JJJJ

KKKK KKKK

LLLL LLLL

MMMM MMMM

NNNN NNNN

OOOO OOOO

PPPP PPPP

Vestibule

Lobby

Corridor

Corridor

Storage

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Stair

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Toilet

Storage

Janitor

Office

Vestibule

Mail

Laundry

Corridor

Stair

Telecomm

Mechanical

Electrical

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Stair

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Corridor

Storage

Elect Closet

Elect Closet

Vending

A

B

1065A

1064A

1117A

1116A

1118A

1058B

A

A

A

1000B

1000A

A

1055A

A

A

A

1063A

A

1051A

1051B

A

A

1050A

1050C

1050B

1053A 1049A

1045A

1045B

A

A

1044A

1044B

1044C

1047A 1043A

1039A

1039B

A

A

1038A

1038B

1038C

1041A 1037A

1033A

1033B

A

A

1032A

1032B

1032C

1035A 1031A

1008A

1008B

A

A

1007A

1007B

1007C

1006A 1010A

1014A

1014B

A

A

1013A

1013B

1013C

1012A 1016A

1020A

1020B

A

A

1019A

1019B

1019C

1018A 1022A

1026A

1026B

A

A

1025A

1025B

1025C

1024A 1028A

B

A

1066A

1070A

1068C

B

1068A

A

A

B

A

1072A

1076A

1074C

1074B

1074A

A

A

B

A

1078A

1082A

1080C

1080B

1080A

A

A

B

A

1084A

1088A

1086C

1086B

1086A

A

A

B

A

1113A

1109A

1111C

1111B

1111A

A

A

B

A

1107A

1103A

1105C

1105B

1105A

A

A

B

A

1101A

1097A

1099C

1099B

1099A

A

A

B

A

1095A

1091A

1093B

1093C

1093A

A

A

1058A

1029B 1029A

1061A

1002A

A1.00

A3.02

A3.02

A3.03

A3.03

0 16'-0" 24'-0"8'-0"

Graphic Scale: 1" = 8'-0"

A1.00

21'-11 3/4" 63'-1 7/8" 124'-8 1/8"

209'-9 3/4"

'-4

/4

'-1

/8

'-6

/8

38'-0 3/4" 114'-2 1/8" 10'-6"

7'-6 1/2" 22'-7 5/8" 16'-10 3/4"

47'-1"

4' -1

1" 1'

-3

/4

'-7

/4

5' -3

/8

4'

-2

/2

4'

-1 0"

'-6

5'

-3

/8

162'-8 3/4"

IIII IIII

JJJJ JJJJ

KKKK KKKK

A1.00

A1.00

A1.00

3' -1

7/

8" 6'

-6

/4

6' -6

/4

/8

4'-6 3/4" 11'-7 3/4"

8'-3 3/8" 7'-11 1/8"6

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

BBBB BBBB

Laundry

Elect Closet

A

13'-7"

'-3

/2

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

1. Contractor to remove all exterior windows and doors per contract documents.

2. Contractor is to protect all existing exterior surfaces from damage during conductance of the project. Contractor shall be responsible for repairs to damage occurring during conductance of the project.

3. Contractor to verify all rough openings for all exterior windows and doors prior to fabrication and installation.

4. Contractor is to protect all existing interior finishes, surfaces, and materials from damage during conductance of the project.

Contractor shall be responsible for repairs to damage occurring during conductance of the project.

5. Contractor to field verify and catalog condition of all interior doors and determine total number for replacement. Coordinate with

Contracting Officer.

6. Contractor to assume 25% replacement all all interior doors for bidding purposes. See Door Types on Sheet A0.00 for Door Type 5.

General Notes - Demolition Plan

1. See notes on Cover Sheet for description of required Work regarding Fixtures and Furnishings.

2. Contractor to coordinate all phases and quantities of items with Facility Manager and Contracting Officer and field verify inventory before proceeding.

3. List of items to be removed and reinstalled in entire facility is as follows - field verify:

General Notes - Fixtures & Furnishings

Dresser 24"x30"x30" 100 lbs 192 (2 per room)

Nightstand 17"x21"x24" 40 lbs 96 (1 per room)

Chair 23"x24"x32" 20 lbs 288 (1 per room/1 kitchen)

Head/footboard 2"x36"x40" 5 lbs 192 (1 pair per room)

Bed Frame 82"x40"x5" 100 lbs 96 (1 per room)

Mattress Twin 96 (1 per room)

Desk 24"x42"x30" 130 lbs 96 (1 per room)

Corner Lamp 96 (1 per room)

Portable Fan 96 (1 per room)

Kitchen Table 26"x26"x36" 50 lbs 96 (1 per room)

Microwave 96 (1 per room)

Refrigerator 30"x30"x72" 100 lbs 96 (1 per room)

Range 25"x30"x36" 150 lbs 96 (1 per room)

Washer 12 (4 per floor)

Dryer 12 (4 per floor)

Love Seat 1 (Room 1057)

Chair 1 (Room 1057)

3 shelf stand 1 (Room 1057)

End Table 1 (Room 1057)

Wall TV (flat) 1 (Room 1057)

Cabinet 36"x18"x30" 1 (Day Room)

Coffee Table 48"x24"x16" 1 (Day Room)

Portable Fans 2 (Day Room)

Sofa 84"x36"x40" 1 (Day Room)

Pool Table 96"x48"x36" 1 (Day Room)

Stools 2 (Day Room)

Cue Rack 1 (Day Room)

Ping Pong 1 (Day Room)

Pictures 17 (Day Room)

Framed Gloves 2 (Day Room)

ITEM DIMENSIONS WEIGHT QUANTITY

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

AMENDMENT 6

/5 /2

:0

:1 P

M

A1.00

03.02.2018

Author

Checker

First Floor Existing/Demolition Plan

Repair Dormitory 655

Designer

A1.00

Bidding Documents (IFB)

1/8" = 1'-0"A1.00

1111 First Floor Existing/Demo Plan 1/4" = 1'-0"A1.00

2222 Typ. Dwelling Unit Demo Plan

Keynotes - First Floor Demolition Plan 1 Remove (E) closet shelving system & components down to bare walls

2 Remove (E) vanity top, sink, fixtures, and soap, towel, and toothbrush holders. Remove all vanity cabinet floor panels

3 Remove (E) window and GWB at interior wall surface as required for installation of new structural components – min. 12” back/to nearest stud – verify – floor to ceiling at each window, each unit.

4 Remove (E) kitchen cabinets, appliances, top, sink, fixtures, etc. as required for replacement/access to kitchen window to be removed

5 Remove (E) tile shower walls, base, trim, fixtures, drywall as req. for installation of (N) shower unit and fixtures.

6 Remove (E) sheet vinyl flooring

7 Remove (E) tile flooring

8 Remove (E) stair treads/riser covers for replacement

9 Remove (E) insul. h.m. door and frame, interior wall gwb/finishes as req. for installation of new structural components – min. 12” back/to nearest stud – verify – floor to ceiling at each exterior door

10 Remove (for reinstallation) all window coverings at all windows - Store off-site per requirements for fixtures & furnishings - See spec./ General notes

11 Remove (E) plastic laminate top and cabinet – coordinate with mechancial

12 (E) dryer – remove, store off-site, and reinstall – see general notes/specifications

13 (E) washer – remove, store off-site, and reinstall – see general notes/specifications

15 (E) floor drain to remain – coord. w/mechanical

16 Demo (E) exterior wall as req. for (N) dryer vents – see mechanical for locations and sizing

17 (E) electrical outlets – relocate as required for new washer and dryer locations – see mech/elect. – patch & repair GWB wall surfaces as required for installation of outlets at new locations

18 Remove & reinstall (E) wall base

19 Remove & reinstall (E) window shades

20 Remove (E) Carpeting

21 Remove (E) wd. trim

22 (E) Range hood - Remove & reinstall

1/2" = 1'-0"A1.00

4444 Demo Int. Elev. @ Window Type A - Typ. First Floor

1/2" = 1'-0"A1.00

5555 Demo Int. Elev. @ Window Type B - Typ. 1st Floor

N N

1/4" = 1'-0"A1.00

3333 First Floor Laundry Demo Plan

N

UP

REF. REF. REF. REF.

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

UP

D D

D D

W W

W W

R E

F

D D

D D

W W

W W

AAAA AAAA

BBBB BBBB

A3.00

A3.01 2

A3.00

A3.011

10101010

10101010

11111111

11111111

12121212

12121212

13131313

13131313

14141414

14141414

15151515

15151515

16161616

16161616

17171717

17171717

18181818

18181818

CCCC CCCC

DDDD DDDD

EEEE EEEE

FFFF FFFF

GGGG GGGG

HHHH HHHH

IIII IIII

JJJJ JJJJ

KKKK KKKK

LLLL LLLL

MMMM MMMM

NNNN NNNN

OOOO OOOO

PPPP PPPP

Stair

Corridor

Storage

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Stair

2027Corridor

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Storage

Janitor

Day Room

Laundry

Telecomm

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Stair

Corridor

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

2104 Bathroom

Bedroom

Closet

Storage

Elect.

Elect.

Vending

2109A

2108A

2110A

2057A

A 20

A

A

A

A

2049A

2049B

A

A

2050A

2050B

2050C

2052A 2048A

2043A

2043B

A

A

2044A

2044B

2044C

2046A 2042A

2037A

2037B

A

A

2038A

2038B

2038C

2040A 2036A

2031A

2031B

A

A

2032A

2032B

2032C

2034A 2030A

2005A

2005B

A

A

2006A

2006B

2006C

422 2008A

2011A

2011B

A

A

2012A

2012B

2012C

2010A 2014A

2017A

2017B

A

A

2018A

2018B

2018C

2016A 2020A

2023A

2023B

A

A

2024A

2024B

2024C

2022A 2026A

B

A

2106A

2102A

2105C

2105B

2105A

A

A

B

A

2100A

2096A

2099C

2099B

2099A

A

A

B

A

2094A

2090A

2093C

2093B

2093A

A

A

B

A

2088A

2084A

2087C

2087B

2087A

A

A

B

A 2058A

2062A

2061C

2061B

2061A

A

A

B

A

2064A

2068A

2067C

2067B

2067A

A

B

A

2070A

2074A

2073C

2073B

2073A

A

A

B

A

2076A

2080A

2079C

2079B

2079A

A

A

A

2027A

A

2001B

A1.01

A3.02

A3.02

A3.03

A3.03

0 16'-0" 24'-0"8'-0"

Graphic Scale: 1" = 8'-0"

A1.01

21'-11 3/4" 63'-1 7/8" 124'-8 1/8"

209'-9 3/4"

'-4

/4

'-1

/8

'-6

/8

38'-0 3/4" 114'-2 1/8" 10'-6"

7'-6 1/2" 22'-7 5/8" 16'-10 3/4"

47'-1"

4' -1

1" 1'

-3

/4

'-7

/4

5' -3

/8

4'

-2

/2

4'

-1 0"

'-6

5'

-3

/8

162'-8 3/4"

IIII IIII

JJJJ JJJJ

KKKK KKKK

A1.01

A1.01

A1.01

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

4'-6 3/4" 11'-7 3/4"

/8

6' -6

/4

6'

-6

/4

3' -1

7/

8"

8'-3 3/8" 7'-11 1/8"

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

4 4

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

4 4

BBBB BBBB

A

Laundry

Elect.

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

13'-7"

'-3

/2

1. Contractor to remove all exterior windows and doors per contract documents.

2. Contractor is to protect all existing exterior surfaces from damage during conductance of the project. Contractor shall be responsible for repairs to damage occurring during conductance of the project.

3. Contractor to verify all rough openings for all exterior windows and doors prior to fabrication and installation.

4. Contractor is to protect all existing interior finishes, surfaces, and materials from damage during conductance of the project.

Contractor shall be responsible for repairs to damage occurring during conductance of the project.

5. Contractor to field verify and catalog condition of all interior doors and determine total number for replacement. Coordinate with

Contracting Officer.

6. Contractor to assume 25% replacement all all interior doors for bidding purposes. See Door Types on Sheet A0.00 for Door Type 5.

General Notes - Demolition Plan

1. See notes on Cover Sheet for description of required Work regarding Fixtures and Furnishings.

2. Contractor to coordinate all phases and quantities of items with Facility Manager and Contracting Officer and field verify inventory before proceeding.

3. List of items to be removed and reinstalled in entire facility is as follows - field verify:

General Notes - Fixtures & Furnishings

Dresser 24"x30"x30" 100 lbs 192 (2 per room)

Nightstand 17"x21"x24" 40 lbs 96 (1 per room)

Chair 23"x24"x32" 20 lbs 288 (1 per room/1 kitchen)

Head/footboard 2"x36"x40" 5 lbs 192 (1 pair per room)

Bed Frame 82"x40"x5" 100 lbs 96 (1 per room)

Mattress Twin 96 (1 per room)

Desk 24"x42"x30" 130 lbs 96 (1 per room)

Corner Lamp 96 (1 per room)

Portable Fan 96 (1 per room)

Kitchen Table 26"x26"x36" 50 lbs 96 (1 per room)

Microwave 96 (1 per room)

Refrigerator 30"x30"x72" 100 lbs 96 (1 per room)

Range 25"x30"x36" 150 lbs 96 (1 per room)

Washer 12 (4 per floor)

Dryer 12 (4 per floor)

Love Seat 1 (Room 1057)

Chair 1 (Room 1057)

3 shelf stand 1 (Room 1057)

End Table 1 (Room 1057)

Wall TV (flat) 1 (Room 1057)

Cabinet 36"x18"x30" 1 (Day Room)

Coffee Table 48"x24"x16" 1 (Day Room)

Portable Fans 2 (Day Room)

Sofa 84"x36"x40" 1 (Day Room)

Pool Table 96"x48"x36" 1 (Day Room)

Stools 2 (Day Room)

Cue Rack 1 (Day Room)

Ping Pong 1 (Day Room)

Pictures 17 (Day Room)

Framed Gloves 2 (Day Room)

ITEM DIMENSIONS WEIGHT QUANTITY

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

AMENDMENT 6

/5 /2

:0

:2 P

M

A1.01

03.02.2018

Author

Checker

Second Floor Existing/Demolition Plan

Repair Dormitory 655

Designer

A1.01

Bidding Documents (IFB)

1/8" = 1'-0"A1.01

1111 Second Floor Existing/Demo Plan 1/4" = 1'-0"A1.01

2222 Typ. Dwelling Unit Demo Plan 2nd Floor

Keynotes - 2nd & 3rd Floor Demolition Plans 1 Remove (E) closet shelving system & components down to bare walls

2 Remove (E) vanity top, sink, fixtures, and soap, towel, and toothbrush holders. Remove all vanity cabinet floor panels

3 Remove (E) window – remove (E) gwb at head, jamb, sill, as req. for removal of window only – new structural components to be installed from exterior

4 Remove (E) kitchen cabinets, appliances, top, sink, fixtures, etc. as required for replacement/access to kitchen window to be removed

5 Remove (E) tile shower walls, base, trim, fixtures, drywall as req. for installation of (N) shower unit and fixtures.

6 Remove (E) sheet vinyl flooring

7 Remove (E) tile flooring

8 Remove (E) stair treads/riser covers for replacement

10 Remove (for reinstallation) all window coverings at all windows - Store off-site per requirements for fixtures & furnishings - See spec./ General notes

11 Remove (E) plastic laminate top and cabinet – coordinate with mechancial

12 (E) dryer – remove, store off-site, and reinstall – see general notes/specifications

13 (E) washer – remove, store off-site, and reinstall – see general notes/specifications

14 Remove (E) sheet vinyl flooring

15 (E) floor drain to remain – coord. w/mechanical

16 Demo (E) exterior wall as req. for (N) dryer vents – see mechanical for locations and sizing

17 (E) electrical outlets – relocate as required for new washer and dryer locations – see mech/elect. – patch & repair GWB wall surfaces as required for installation of outlets at new locations

18 Remove & reinstall (E) wall base

19 Remove & reinstall (E) window shades

20 Remove (E) Carpeting

21 Remove (E) Door & frame, adjacent construction as required for installation of (N) HM frame and SC wd. door

22 Remove & reinstall (E) wd. trim

23 (E) Range hood - Remove & reinstall

1/2" = 1'-0"A1.01

3333 Demo Int. Elev. @ Window Type A - Typ. 2nd Floor

1/2" = 1'-0"A1.01

4444 Demo Int. Elev. @ Window Type B - Typ. 2nd Floor

N N

1/4" = 1'-0"A1.01

5555 Second Floor Laundry Demo Plan

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

D D

D D

W W

W W

R E

F

D D

D D

W W

W W

AAAA AAAA

BBBB BBBB

A3.00

A3.01 2

A3.00

A3.011

10101010

10101010

11111111

11111111

12121212

12121212

13131313

13131313

14141414

14141414

15151515

15151515

16161616

16161616

17171717

17171717

18181818

18181818

CCCC CCCC

DDDD DDDD

EEEE EEEE

FFFF FFFF

GGGG GGGG

HHHH HHHH

IIII IIII

JJJJ JJJJ

KKKK KKKK

LLLL LLLL

MMMM MMMM

NNNN NNNN

OOOO OOOO

PPPP PPPP

Stair

Corridor

Storage

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Stair

Corridor

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Storage

Janitor

Day Room/Open to Below

Laundry

Telecomm

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Stair

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Bedroom

Closet

Kitchen

Bathroom

Bedroom

Closet

Storage

Electrical

Electrical

Corridor

Vending

3108A

3107A

3057A

A

A

A

3049A

3049B

A

A

3050A

3050B

3050C

3052A 3048A

3043A

3043B

A

A

3044A

3044B

3044C

3046A 3042A

3037A

3037B

A

A

3038A

3038B

3038C

3040A 3036A

3031A

3031B

A

A

3032A

3032B

3032C

3034A 3030A

3005A

3005B

A

A

3006A

3006B

3006C

3004A 3008A

3011A

3011B

A

A

3012A

3012B

3012C

3010A 3014A

3017A

3017B

A

A

3018A

3018B

3018C

3016A 3020A

3023A

3023B

A

A

3024A

3024B

3024C

3022A 3026A

A

A

3105A

3101A

3104C

3104B

3104A

A

A

B

A

3099A

3095A

3098C

3098B

3098A

A

A

B

A

3093A

3089A

3092C

3092B

3092A

A

A

B

A

3087A

3083A

3086C

3086B

3086A

A

A

B

A

3058A

3062A

3061C

3061B

3061A

A

A

B

A

3064A

3068A

3067C

3067B

3067A

A

A

B

A

3070A

3074A

3073C

3073B

3073A

A

A

B

A

3076A

3080A

3079C

3079B

3079A

A

A

3109A

A

A

3027A

A

3001B

A

A1.02

A3.02

A3.02

A3.03

A3.03

0 16'-0" 24'-0"8'-0"

Graphic Scale: 1" = 8'-0"

A1.02

21'-11 3/4" 63'-1 7/8" 124'-8 1/8"

209'-9 3/4"

'-0

/8

'-6

/4

'-6

/8

38'-0 3/4" 114'-2 1/8" 10'-6"

7'-6 1/2" 22'-7 5/8" 16'-10 3/4"

47'-1"

4' -1

1" 1'

-3

/4

'-7

/4

5' -3

/8

4'

-2

/2

4'

-1 0"

'-6

5'

-3

/8

162'-8 3/4"

IIII IIII

JJJJ JJJJ

KKKK KKKK

A1.02

A1.02

A1.02

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

3' -1

7/

8" 6'

-6

/4

6' -6

/4

/8

4'-6 3/4" 11'-7 3/4"

8'-3 3/8" 7'-11 1/8"

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

4 4

0 4'-0" 6'-0"2'-0"

Graphic Scale: 1" = 2'-0"

4 4

BBBB BBBB

13'-7"

'-3

/2

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

1. Contractor to remove all exterior windows and doors per contract documents.

2. Contractor is to protect all existing exterior surfaces from damage during conductance of the project. Contractor shall be responsible for repairs to damage occurring during conductance of the project.

3. Contractor to verify all rough openings for all exterior windows and doors prior to fabrication and installation.

4. Contractor is to protect all existing interior finishes, surfaces, and materials from damage during conductance of the project.

Contractor shall be responsible for repairs to damage occurring during conductance of the project.

5. Contractor to field verify and catalog condition of all interior doors and determine total number for replacement. Coordinate with

Contracting Officer.

6. Contractor to assume 25% replacement all all interior doors for bidding purposes. See Door Types on Sheet A0.00 for Door Type 5.

General Notes - Demolition Plan

1. See notes on Cover Sheet for description of required Work regarding Fixtures and Furnishings.

2. Contractor to coordinate all phases and quantities of items with Facility Manager and Contracting Officer and field verify inventory before proceeding.

3. List of items to be removed and reinstalled in entire facility is as follows - field verify:

General Notes - Fixtures & Furnishings

Dresser 24"x30"x30" 100 lbs 192 (2 per room)

Nightstand 17"x21"x24" 40 lbs 96 (1 per room)

Chair 23"x24"x32" 20 lbs 288 (1 per room/1 kitchen)

Head/footboard 2"x36"x40" 5 lbs 192 (1 pair per room)

Bed Frame 82"x40"x5" 100 lbs 96 (1 per room)

Mattress Twin 96 (1 per room)

Desk 24"x42"x30" 130 lbs 96 (1 per room)

Corner Lamp 96 (1 per room)

Portable Fan 96 (1 per room)

Kitchen Table 26"x26"x36" 50 lbs 96 (1 per room)

Microwave 96 (1 per room)

Refrigerator 30"x30"x72" 100 lbs 96 (1 per room)

Range 25"x30"x36" 150 lbs 96 (1 per room)

Washer 12 (4 per floor)

Dryer 12 (4 per floor)

Love Seat 1 (Room 1057)

Chair 1 (Room 1057)

3 shelf stand 1 (Room 1057)

End Table 1 (Room 1057)

Wall TV (flat) 1 (Room 1057)

Cabinet 36"x18"x30" 1 (Day Room)

Coffee Table 48"x24"x16" 1 (Day Room)

Portable Fans 2 (Day Room)

Sofa 84"x36"x40" 1 (Day Room)

Pool Table 96"x48"x36" 1 (Day Room)

Stools 2 (Day Room)

Cue Rack 1 (Day Room)

Ping Pong 1 (Day Room)

Pictures 17 (Day Room)

Framed Gloves 2 (Day Room)

ITEM DIMENSIONS WEIGHT QUANTITY

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

AMENDMENT 6

/5 /2

:0

:3 P

M

A1.02

03.02.2018

Author

Checker

Third Floor Existing/Demolition Plan

Repair Dormitory 655

Designer

A1.02

Bidding Documents (IFB)

1/8" = 1'-0"A1.02

1111 Third Floor Existing/Demo Plan

Keynotes - 2nd & 3rd Floor Demolition Plans 1 Remove (E) closet shelving system & components down to bare walls

2 Remove (E) vanity top, sink, fixtures, and soap, towel, and toothbrush holders. Remove all vanity cabinet floor panels

3 Remove (E) window – remove (E) gwb at head, jamb, sill, as req. for removal of window only – new structural components to be installed from exterior

4 Remove (E) kitchen cabinets, appliances, top, sink, fixtures, etc. as required for replacement/access to kitchen window to be removed

5 Remove (E) tile shower walls, base, trim, fixtures, drywall as req. for installation of (N) shower unit and fixtures.

6 Remove (E) sheet vinyl flooring

7 Remove (E) tile flooring

8 Remove (E) stair treads/riser covers for replacement

10 Remove (for reinstallation) all window coverings at all windows - Store off-site per requirements for fixtures & furnishings - See spec./ General notes

11 Remove (E) plastic laminate top and cabinet – coordinate with mechancial

12 (E) dryer – remove, store off-site, and reinstall – see general notes/specifications

13 (E) washer – remove, store off-site, and reinstall – see general notes/specifications

14 Remove (E) sheet vinyl flooring

15 (E) floor drain to remain – coord. w/mechanical

16 Demo (E) exterior wall as req. for (N) dryer vents – see mechanical for locations and sizing

17 (E) electrical outlets – relocate as required for new washer and dryer locations – see mech/elect. – patch & repair GWB wall surfaces as required for installation of outlets at new locations

18 Remove & reinstall (E) wall base

19 Remove & reinstall (E) window shades

20 Remove (E) Carpeting

21 Remove (E) Door & frame, adjacent construction as required for installation of (N) HM frame and SC wd. door

22 Remove & reinstall (E) wd. trim

23 (E) Range hood - Remove & reinstall

1/4" = 1'-0"A1.02

2222 Typ. Dwelling Unit Demo Plan 3rd Floor

1/2" = 1'-0"A1.02

3333 Demo Int. Elev. @ Window Type A - Typ. 3rd Floor

1/2" = 1'-0"A1.02

4444 Demo Int. Elev. @ Window Type B - Typ. 3rd Floor

N N

1/4" = 1'-0"A1.02

5555 Third Floor Laundry Demo Plan

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

R E

F

UP

UP

DDDD

W W

W W

DDDD

W W

W W

R E

F

AAAA AAAA

BBBB BBBB

A3.00

A3.01

A3.00

A3.01

10101010

10101010

11111111

11111111

12121212

12121212

13131313

13131313

14141414

14141414

15151515

15151515

16161616

16161616

17171717

17171717

18181818

18181818

CCCC CCCC

DDDD DDDD

EEEE EEEE

FFFF FFFF

GGGG GGGG

HHHH HHHH

IIII IIII

JJJJ JJJJ

KKKK KKKK

LLLL LLLL

MMMM MMMM

NNNN NNNN

OOOO OOOO

PPPP PPPP

Vestibule

Lobby

Corridor

Corridor

Storage

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Stair

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Toilet

Storage

Janitor

Office

Vestibule

Mail

Laundry

Corridor

Stair

Telecomm

Mechanical

Electrical

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Stair

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Bedroom

Closet

Bathroom

Kitchen

Bedroom

Closet

Corridor

Storage

Elect Closet

Elect Closet

Vending

B

1117A

1116A

1118A

1058B

A

A

1000B

A

1055A

A

A

A

1063A

A

1051A

1051B

A

A

1050A

1050C

1050B

1053A 1049A

1045A

1045B

A

A

1044A

1044B

1044C

1047A 1043A

1039A

1039B

A

A

1038A

1038B

1038C

1041A 1037A

1033A

1033B

A

A

1032A

1032B

1032C

1035A 1031A

1008A

1008B

A

A

1007A

1007B

1007C

1006A 1010A

1014A

1014B

A

A

1013A

1013B

1013C

1012A 1016A

1020A

1020B

A

A

1019A

1019B

1019C

1018A 1022A

1026A

1026B

A

A

1025A

1025B

1025C

1024A 1028A

B

A

1066A

1070A

1068C

B

1068A

A

A

B

A

1072A

1076A

1074C

1074B

1074A

A

A

B

A

1078A

1082A

1080C

1080B

1080A

A

A

B

A

1084A

1088A

1086C

1086B

1086A

A

A

B

A

1113A

1109A

1111C

1111B

1111A

A

A

B

A

1107A

1103A

1105C

1105B

1105A

A

A

B

A

1101A

1097A

1099C

1099B

1099A

A

A

B

A

1095A

1091A

1093B

1093C

1093A

A

A

1029B

1061A

1002A

A2.00

TYP.

A3.02

A3.02

A3.031

A3.03 2

0 16'-0" 24'-0"8'-0"

Graphic Scale: 1" = 8'-0"

A2.00

A

A

A

A

1065A

1064A 1029A

A A A A A A A A

A A A A A A A A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

AA

AA

B B B B

B B B B

B

B

B

B

B

B

B

B

21'-11 3/4" 63'-1 7/8" 124'-8 1/8"

209'-9 3/4"

'-4

/4

'-1

/8

'-6

/8

38'-0 3/4" 114'-2 1/8" 10'-6"

7'-6 1/2" 22'-7 5/8" 16'-10 3/4"

47'-1"

4' -1

1" 1'

-3

/4

'-7

/4

5' -3

/8

4'

-2

/2

4'

-1 0"

'-6

5'

-3

/8

162'-8 3/4"

15 15 15 15 15 15 15

1515151515

A2.00

BBBB BBBB

A4.00

A4.00

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

'-3

/2

13'-7"

A

IIII IIII

KKKK KKKK

A4.00

A4.00

A4.00

A4.00

A4.00

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

A4.00

REV.

A4.00

REV.

A4.00

18 REV.

3' -1

7/

8" 6'

-6

/4

6' -6

/2

/8

4'-6 3/4" 11'-7 3/4"

8'-8" 7'-11 1/8"

9 A

B

A

A4.00

1. See Finish Plans, sheets A2.03, A2.04, A2.05 for all new interior finishes and flooring throughout. Not all rooms receive new interior finishes or flooring. Verify and coordinate required work with schedules shown on these sheets.

2. Assume for bidding purposes 25% replacement on all interior wood doors – contractor to verify door conditions throughout. See Door Types, sheet A0.00, for replacement door Type 5 information. Reuse existing door hardware at all replaced interior solid core wood doors. Notify contracting officer of actual quantity of interior doors prior to replacement.

3. All spaces to receive Work in this Project shall be free and clear of removable fixtures and furnishings prior to the start of Work. See specifications and General Notes on Cover Sheet for clarification, and coordinate removal, storage, inventory and documentation, and reinstallation with Facility Manager and Contracting Officer.

4. See enlarged floor plans of typical resident rooms, bathrooms, and laundry rooms for information on extent of renovation work and refinishing and new construction/cabinetry/fixtures.

5. Work shown on enlarged floor plans is typical of all resident and laundry interior spaces at each floor and applies to all rooms of those types.

General Notes - Floor Plan

DDDD DDDD

Janitor

A

A4.00

3'-8"

4' -0

0 8'-0" 12'-0"4'-0"

Graphic Scale: 1" = 4'-0"

P lo t D a te

OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE OFFICE SIGNATURE DATE

BASE CIVIL ENGINEER

CHIEF ENGINEER

PROJECT ENGINEER

CE OPERATIONS

FIRE CHIEF

ENVIRONMENTAL ENG.

COMMUNICATIONS

USING AGENCY

BIO-ENVIRONMENTAL

SAFETY

AT/RPEC REP

REV. DATE DESCRIPTION DRAWN APPR'D

DRAWN BY

DESIGNED BY

REVIEWED BY

SCALE DATE PLATE

PAGE OF

PROJECT NUMBERS

ACAD DRAWING NUMBER

RECORD FILE NUMBER

GLOBAL STRIKE COMMAND

MALMSTROM AIR FORCE BASE, MONTANA

copyright 2014 SMA, P.C.

AS SHOWN

NZAS-04-1042

AMENDMENT 6

/5 /2

:0

:3 P

M

A2.00

03.02.2018

Author

Checker

First Floor Renovation Plan

Repair Dormitory 655

Designer

A2.00

Bidding Documents (IFB)

1/8" = 1'-0"A2.00

1111 First Floor Renovation Plan

Keynotes - Renovation Floor Plan 1 (N) Plastic laminate closet cabinetry system – typical - see interior elevations

2 (N) solid surface top & new plastic laminate lavatory cabinet – see interior elevations

3 (N) solid surface shower pan & tile finish – see interior elevations/finish plans

4 Reinstall (E) refrigerator

5 Reinstall (E) range

6 Reinstall (E) upper cabinets & range hood

7 Reinstall (E) sink in (N) solid surface top

8 (N) solid surface counter top

9 Patch, repair, repaint wall for installation of (N) steel frame and blast resistant window – see struct., interior elevations, finish schedule

10 Reinstall (E) dryers at outside wall – coord. w/mech.

11 (E) floor drain to remain

12 Reinstall (E) washers – coord. w/mech.

13 (N) 4'-0" wide plastic laminate counter w/(2) support brackets, 4"in from each end - see detail

14 (N) plastic laminate cabinets and top – see interior elevations

15 (N) Prefin. mtl. downspout - See exterior elevations

16 Skim & refinish (E) EIFS at wall surfaces indicated with a dashed line form corner to corner - See exterior elevations - Other wall planes to recieve only spot patching & repairs to bird & wind damage

17 (N) Mop sink - See Mech.

N

1/4" = 1'-0"A2.00

3333 First Floor Typ. Laundry Enlarged Plan 1/4" = 1'-0"A2.00

2222 First Floor Typ. Enlarged Plan

Note: See sheet A0.00 for door & frame types

Door Schedule First Floor

Door # Width X Height Door Type

Frame Type

Fire Rating Hardware Head Detail Jamb Detail Comments

First…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .