Attach 1d -- PWS Section 13 - Grounds_28 Feb 22.pdf

PDF 341 KB Posted

Attached to
SOLICITATION NOTICE/ Request for Proposals (RFP) for Keesler Air Force Base (KAFB) Base Operations Support (BOS)
Solicitation number
FA300221R0012
Issued by

View the file

Other files

File Type Posted
Attach 13 - Section L - Instructions Conditions and Notices to Offerors_14 Apr 22.pdf PDF
Attach 24 - Solicitation Questions and Answers-Round 1 thru 3_ 14 Apr 22.pdf PDF
Attach 11 - L and M Quick View_14 Apr 22.pdf PDF
Attach 14 - Section M - Evaluation Factors for Award_14 Apr 22.pdf PDF
Solicitation Amendment FA300221R00120005_SF30 Signed 14 Apr 22.pdf PDF
Attach 6 - Past Performance Information Worksheet_21 Mar 22.pdf PDF
Attach 14 - Section M - Evaluation Factors for Award_21 Mar 22.pdf PDF
Attach 1c -- PWS Section 12 - Installation Engineering_21 Mar 22.pdf PDF
Attach 24 - Solicitation Questions and Answers-Round 1 thru 3_21 Mar 22.pdf PDF
Attach 20 - Section H - Special Contract Requirements_21 Mar 22.pdf PDF
Conformed Copy thru Amendment 0004_31 Mar 2022.pdf PDF
Attach 19 - CLIN Structure Pricing Proposal Worksheet Section B_21 Mar 22.xlsx XLSX spreadsheet
Attach 11 - L and M Quick View_21 Mar 22.pdf PDF
Attach 13 - Section L - Instructions Conditions and Notices to Offerors_21 Mar 22.pdf PDF
Attach 1d-1 -- PWS Section 13 Grounds Maps_28 Feb 22.pdf PDF
Attach 1d -- PWS Section 13 - Grounds_21 Mar 22.pdf PDF
Attach 1g -- PWS Section 23 - Supply_Logistics_21 Mar 22.pdf PDF
Solicitation Amendment FA300221R00120004_SF 30 Signed_31 Mar 2022.pdf PDF
Attach 6 - Past Performance Information Worksheet_28 Feb 22.docx DOCX document
Attach 5 - Quality Assurance Surveillance Plan (QASP)_28 Feb 22.docx DOCX document
Attach 17 - Manpower Matrix Template_28 Feb 22.xlsx XLSX spreadsheet
Attach 9a -Technical Library Index 2 of 2_28 Feb 22.pdf PDF
Attach 22 - Vehicle Matrix Template_28 Feb 22.xlsx XLSX spreadsheet
Attach 1c -- PWS Section 12 - Installation Engineering_28 Feb 22.pdf PDF
Attach 1i -- PWS Section 30 - Human Resources_28 Feb 22.pdf PDF
Solicitation Amendment FA300221R00120003 SF 30 Signed_11 Mar 2022.pdf PDF
Attach 14 - Section M - Evaluation Factors for Award_28 Feb 22.pdf PDF
Conformed Copy thru Amendment 0003_Signed 11 Mar 2022.pdf PDF
Attach 1k -- Mission Essential Contractor Services_28 Feb 22.pdf PDF
Attach 1b -- PWS Section 11 - Operations Management_28 Feb 22.pdf PDF
Attach 2 - Service Contract Labor Standards (SCLS) Wage Determinations_27 Dec 21.pdf PDF
Attach 23 - Subcontractor Consent_Client Authorization Letter Samples_28 Feb 22.docx DOCX document
Attach 1h -- PWS Section 28 - Community Services_28 Feb 22.pdf PDF
Keesler BOS Site Visit Brief_Attendee List_14-15 Dec 2021.pdf PDF
Attach 1 -- PWS Section 2 - All Services_28 Feb 22.pdf PDF
Attach 19 - CLIN Structure Pricing Proposal Worksheet Section B_28 Feb 22.xlsx XLSX spreadsheet
Attach 11 - L and M Quick View_28 Feb 22.pdf PDF
Attach 1g -- PWS Section 23 - Supply_Logistics_28 Feb 22.pdf PDF
Attach 1e -- PWS Section 14 - Emergency Management_28 Feb 22.pdf PDF
Attach 24 - Solicitation Questions and Answers-Round 1 and 2_28 Feb 22.pdf PDF
Attach 1j -- PWS Section 32 - Weather Services_28 Feb 22.pdf PDF
Attach 1f -- PWS Section 15 - Vertical Transportation Equipment_28 Feb 22.pdf PDF
Attach 1a -- PWS Section 10 - Installation Management_28 Feb 22.pdf PDF
Attach 20 - Section H - Special Contract Requirements_28 Feb 22.pdf PDF
Attach 7 - Past Performance Questionnaire_17 Nov 21.docx DOCX document
Attach 12 - Work Breakdown Structure (WBS) Template_28 Feb 22.xlsx XLSX spreadsheet
Attach 16 - Consolidated DD1423s_28 Feb 22.pdf PDF
Attach 1-1 -- Section 2 - All Services Maps_Area Layouts_28 Feb 22.pdf PDF
Attach 13 - Section L - Instructions Conditions and Notices to Offerors_28 Feb 22.pdf PDF
Attach 3 - Davis-Bacon Wage Determinations 7 Jan 22.pdf PDF
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA300221R0012

Attachment 1d

28 Feb 2022

13-1

Section 13: Grounds Performance Work Statement (PWS)

TABLE OF CONTENTS

SECTION 13-1: DESCRIPTION OF SERVICES

SECTION 13-2: SERVICES SUMMARY

SECTION 13-3: GENERAL INFORMATION

APPENDIX 13A: PUBLICATIONS

APPENDIX 13B: WORKLOAD DATA

APPENDIX 13C: MAPS AND WORK AREA LAYOUT/GOVERNMENT FURNISHED

FACILITIES (GFF)

APPENDIX 13D: CONTRACT DATA REQUIREMENTS LIST (CDRL)

APPENDIX 13E: COLLATERAL TASKS (DUTIES)

APPENDIX 13F: GOVERNMENT FURNISHED PROPERTY (GFP)

APPENDIX 13G: GOVERNMENT FURNISHED TRAINING (GFT)

APPENDIX 13H: ACRONYMS

APPENDIX 13I: OPERATIONS PLANS (OPLANS) AND SUPPORT AGREEMENTS

APPENDIX 13J: SPECIAL TRAINING, CERTIFICATION, AND LICENSING

REQUIREMENTS

13-2

SECTION 13-1

13.1. DESCRIPTION OF SERVICES.

13.1.1. Overview. Provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance.

13.1.2. The Service Provider (SP) shall provide grounds maintenance services in accordance with (IAW) this PWS and/or current Air Force Common Output Level Standards (AFCOLS):

13.1.2.1. Grounds Maintenance Services.

13.1.2.1.1. Provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. Area maps and workloads depicting the service described in this PWS are identified in the Appendix 13B & 13C. SP shall accomplished any work identified in this PWS that is not in 13C. The SP’s performance shall be based on the Contracting Officer Representative (COR) and Contracting Officer’s (CO’s) evaluation of the results required by the Services Summary (SS) and not the method of performance. The evaluation of results will be based on COR surveillance, tenant satisfaction, and customer complaints. Results of the evaluations will be the determining factor for the success or failure of this contract.

13.1.2.1.2. The SP shall comply with applicable federal, regional, state, and local laws and commercial standards.

13.1.2.1.3. The SP shall provide a monthly report to the COR within the second business day of each month, listing all grounds work accomplished. The growing season, considered 1 March through 31 October. All damage caused by the SP or its employees to government property and personal property (to include but not limited to facilities, fences, equipment, trees and shrubs, etc.), due to SP operations shall be reported to the Administrative Contracting Officer (ACO) and COR within 48 hours after the event. SP shall repair or replace within 15 workdays after identification or notification at no additional cost to the Government. If a plant should die or become unhealthy due to damage, the SP shall be responsible for replacing the damaged plant with a plant of same size and type. Plant replacement shall occur within 15 workdays after identification or notification or as otherwise agreed to by the parties. SP shall trim and edge all areas concurrent with mowing with exception of post indicator valve, transformer and fire hydrants, which will be, maintained IAW the current versions of NFPA 1 and UFC 3 -601 Operation and Maintenance, Inspection, Testing, and Maintenance of Fire Protections Systems. SP shall provide Damage and Injury Report

13-3 to CO/COR within 48 hours after the event and repaired or replaced by the SP within 15 workdays after identification or notification. (CDRL 1301, 1302)

13.1.2.2. Perimeter Fence Line. Maintain a 10-foot mow strip along the installation side of the perimeter fence lines. SP shall trim fence lines to prevent vegetation growth in the fence, including removal of vegetation growing up the links of the fence.

13.1.2.3. Dead Animals. Small dead animals are to be collected for disposal in coordination with Operations & Maintenance (O&M) Pest Management.

13.1.2.4. Pest Control. Coordinate with O&M Pest Management.

13.1.2.5. Maintain Improved Grounds. Improved grounds identified in Appendix 13B.1;

workload in the table and drawings.

13.1.2.5.1. Mow. Mow all improved grounds to look well-manicured with a neat and professional appearance. Maintain grass height between 2- and 4-inches uniform in appearance, free of skips, gaps, rutting, or scalping. The SP shall be required to pick up debris, natural and manmade, prior to mowing any area. The SP shall remove or mulch grass clippings when visible after mowing, before leaving work area. Removed debris shall be disposed of IAW the base’s solid waste management plan. In the event, an area cannot be mowed, due to zero turn and/or a large riding type mower cannot access area due to size restrictions, SP shall mow the area using an alternative method, etc.

13.1.2.5.2. Edge. Edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within the improved grounds so that grass height matches surrounding area grasses.

Edging shall include removal of vegetation from expansion joints and cracks in sidewalks, driveways, curbs and other hard surfaces. Grass, vegetation, and weeds shall be cut back no more than ½-inch from the surface edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping, rutting, and uneven or rough cutting.

13.1.2.5.3. Trim. Trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots, bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. The SP shall remove or mulch grass clippings when visible after trimming, before leaving work area.

13.1.2.5.4. Weed Control. Control weeds in identified improved grounds through execution of a weed control program appropriate for the area to maintain a professional appearance. Restore grounds made barren and remove weeds to the level of care of the surrounding area (i.e. semi-improved, improved, etc.). SP shall only use herbicides defined in Department of Defense (DoD) and Air Force (AF) documents. The SP shall submit a monthly report to the COR within the second business day of each month, identifying all hazardous material and herbicide use. (CDRL 1304)

13-4

13.1.2.5.5. Munitions Storage Area. Maintain grass within five (5) feet from munition igloo/bunker/magazine vent stacks to improved grounds standard of 2- to 4-inches in height. SP shall not apply herbicide to minimize ground erosion. Additionally, SP shall maintain between 2-and 4- inches in height areas within 50 feet of designated Potential Explosive Sites (PES) to minimize fire hazards. All adjacent concrete areas shall be trimmed and edged to maintain improved grounds standards.

13.1.2.6. Irrigation. The SP shall maintain, adjust, and repair identified lawn irrigation systems during the growing season (if systems are returned to normal use post winterization).

13.1.2.6.1. Maintenance of Irrigation Systems. Maintenance includes, but is not limited to, draining and charging systems, replacing damaged or broken control devices and sprinkler heads, and repair of ruptured pipes. Maintain equipment and systems to be efficient and in good operational working order. Replacement of pumps, controllers, clocks/timers, or backflow prevention devices is not included in routine maintenance of irrigation systems. The irrigation systems to be maintained and related workload data identified in Appendix 13B.1. Workload. The SP shall submit a monthly report to the COR within the second business day of each month, of all work accomplished to the irrigation systems (if systems are returned to normal use post winterization). (CDRL 1303)

13.1.2.7. Remove Debris/Police Grounds. Perform general litter patrol in areas of improved grounds identified in Appendix 13B.1. Remove and dispose of natural debris, (tree limbs, dry brush, rodent habitats, dead animals, etc.), and ma n-made debris within 48 hours IAW the Base Waste Management Plan. Police areas to maintain a neat and professional appearance.

13.1.2.7.1. Leaf Removal. Remove leaves in areas of improved grounds to maintain a neat and professional appearance. At all other times leaf removal is a part of debris and litter removal to maintain a neat and professional appearance. Leaves must be disposed IAW the Base Solid Waste Management Plan.

13.1.2.8. Lawn Conditioning.

13.1.2.8.1. Fertilization. The SP shall have a government approved pH adjustment and fertilizer application program. At a minimum annually, the SP shall perform a laboratory test of the soil in improved grounds and apply fertilizer and other soil amendments to bring soil condition to a suitable level for the vegetation being treated. Provide soil test results to COR within two (2) business days prior to fertilization application. (CDRL 1305)

13.1.2.8.2. Lawn Renovation.

13.1.2.8.2.1. The SP shall renovate lawns in improved grounds once a year, issued via separate work order, as identified by the CO or COR. Renovate deteriorated lawn area to match surrounding

13-5 areas. The SP shall seed, sprig, or sod IAW Keesler Air Force Base (AFB) approved landscaping guide. Areas damaged by the SP shall repair at no cost to the Government.

13.1.2.8.2.2. Lawn Repair. The SP shall renovate lawns in improved grounds, issued via separate work order, as identified by the CO or COR. Renovate deteriorated lawn area to match surrounding areas. The SP shall seed, sprig, or sod IAW Keesler AFB approved landscaping guide. This work will be performed under the Emergency and Special Services CLIN. Areas damaged by the SP, shall repair at no cost to the Government.

13.1.2.8.3. Prune Shrubs, Hedges, and Other Plants. The SP shall prune/trim shrubs and other plants to maintain their natural growth characteristics to enhance the beauty and health of the plant.

Hedges shall be maintained to their natural mature height and shape. Shrubs, plants, hedges, and ground cover/vines shall be pruned/trimmed 12 inches away from buildings, fences, curbing, sidewalks, and other fixed obstacles. All ground cover and plants shall be kept within the bed borders. All plants around landscape and ground lights shall be pruned/trimmed to allow light usage for its intended purpose. Shrubs and hedges located on street corners, curb easements, etc.

shall be pruned/trimmed to keep from obstructing view of oncoming traffic. Areas beneath and around shrubs and hedges shall be kept free (clean) of all grass, weeds, vegetation, and debris.

Volunteer tree growth seedlings shall be removed at no additional cost to the Government.

13.1.2.9. Maintain Semi-Improved Grounds. Semi-improved grounds identified in Appendix 13B.1. Workload.

13.1.2.9.1. Mow. The SP shall maintain grass height between 4 and 10 inches in all semi-improved grounds areas. Maintain a uniform appearance in all areas. Where possible, maintain adjacent areas at or near the same grass heights.

13.1.2.9.2. Trim. Trim grass and weeds around trees, shrubs, buildings, fences, poles, fire hydrants, parking lots, bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on semi - improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing.

13.1.2.10. Maintain Bird Area Strike Hazard (BASH). BASH areas are identified in Appendix 13B, para 13B.1.

13.1.2.10.1. Mow. SP shall maintain Grass, weeds and vegetation between 7- to 14-inches; the grass shall not be shorter than 7 inches in height to prevent dust and debris on the airfield and never be more than 14 inches in height to prevent bird habitation. Approved plant growth regulators may be used to reduce mowing frequency. The SP shall begin mowing operations at the active Airfield surfaces and move to the outermost area. This causes insects and animals to move toward the inside of the field and away from the runway. The SP shall be responsible for ensuring the removal of all

13-6 foreign objects and debris, produced by grounds maintenance, off all taxiways and aircraft parking aprons before leaving the work area.

13.1.2.10.2. Airfield Light Fixtures. The SP shall maintain a 10-foot-wide path between 4 to 6 inches in height around the perimeter of the airfield pavement to include trimming around runway and taxiway lights and other fixed obstacles and temporary obstacles/objects. This service also includes the requirement that grass, vegetation and weeds shall not extend over the edge of concrete, pads, taxiways, runways, and paved or asphalt areas.

13.1.2.10.3. Herbicides and Insecticides. Coordinate with O&M Entomology to follow the BASH plan to minimize seeds and flowers that attract insects /birds.

13.1.2.10.4. Airfield Coordination. Coordinate all activities on the airfield by contacting Airfield Management.

13.1.2.10.5. Flight-Line Drivers. SP must complete training prior to operating vehicles or mowers on the flight line. All employees working on airfield grounds shall be required to have an AF Form 483, Certificate of Competency (flight-line driver’s license) with them at all times. Vehicles must have a valid Privately Operated Vehicle (POV) pass issued by Airfield Management prior to operating on the flight line. No equipment will be left unattended while working in these areas.

The SP shall be responsible for ensuring the removal of all foreign objects and debris, produced by grounds maintenance, off of all taxiways, runways, and aircraft parking aprons before leaving the work area.

13.1.2.10.6. Airfield Tower Communications. SP personnel shall be radio-equipped to maintain constant two-way radio contact with the control tower and Airfield Management when operating near runways, overruns, and taxiways. The SP personnel shall maintain contact with the control tower when operating on or within 150 feet of the runway. The SP shall provide all communication equipment required for this contract. The Government will provide the transceiver frequency to the SP. All equipment shall be Very High Frequency (VHF) type with a minimum five-mile range and shall have private line capability. The SP shall be responsible for any changes to radio types that the base makes in the course of this contract, i.e., frequency changes. The SP personnel shall respond immediately to the directions of the Air Traffic Control tower personnel.

13.1.2.11. Maintain Un-Improved Grounds. Un-improved grounds identified in Appendix 13B.1.

SP shall maintain grass and vegetation in un-improved grounds to prevent woody encroachment.

The SP shall mow un-improved grounds four times per year to Semi-Improved mowing standards.

The SP shall notify the COR prior to the mowing event, when Unimproved mowing will take place.

13.1.2.11.1. Maintain Turkey Creek Gas line. Mow un-improved grounds four times per year to Semi-Improved mowing standards.

13-7

13.1.2.11.2. Maintain Vegetative Beds, Inert Beds, Rock Beds and Related Areas. Maintain vegetative beds, inert beds, rock beds, parking lot beds, and related areas as identified (see Appendix 3B.1.) to present a neat and professional appearance. Maintenance activities may include, but are not limited to, fertilizing, watering, weeding, mulching, and repairing or replacing of damaged plants and shrubs. When replacing plants, shrubs, and performing repairs, conform to good Xeriscaping practices for the area. To include trimming around the vegetative beds.

13.1.2.11.3. Maintain Surface Drainage Ditches. Maintain surface drainage ditches (identified in Appendix 13B.1.) to be free of shrubs, trees, silt and trash to prevent erosion and ensure continuous flow of water.

13.1.2.11.4. Maintain Retention Ponds. Maintain retention ponds to be clear and obstacle free of shrubs, trees, silt and trash to ensure continuous flow of water into the pond area. Maintenance activities shall be based on requirement to keep the ponds free flowing and not to be based upon level of grounds maintenance to the adjacent grounds.

13.1.2.12. Special Requirements. The SP shall be responsible for removing all debris generated from all tree related operations. All non-emergency work shall be completed within five (5) workdays from the date identified by the COR unless noted otherwise within subsections.

13.1.2.13. Trees. Identify monthly and/or as needed to the COR trees that pose public safety hazards or threats to structures/buildings. Prune or trim trees previously identified after receiving direction from the CO or COR. These hazards include minimum safety clearances, which are 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, 4 feet over buildings, and 1 foot from buildings. Topping and de-horning are not permitted. Trimming or pruning of trees that touch or hang over utility poles or power lines is the responsibility of the SP. Do not trim and/or prune trees that touch or hang over energized utility poles or power lines without assistance from Utilities Privatization SP. Coordinate with Utilities Privatization SP, if trees need to be trimmed from around power lines. Minimum clearance from primary lines (over 600 volts) shall be 8 feet.

Minimum clearance from secondary lines (under 600 volts, i.e. electric service drops, telephone, and cable TV) shall be 4 feet.

13.1.2.13.1. Tree Care. The SP shall brace, cable, guy (to keep tree vertical), and deep water all damaged trees after identification. The SP shall remove all guy wires, cables, straps, and stakes when the trees remain vertical (normally, after one growing season). The SP shall adjust wires, cables, and straps as required, to prevent girdling. Remove all debris generated from trimming or pruning operations.

13.1.2.13.1.1. Trees Standards. The SP shall perform all tree work IAW contract specifications and the following tree care standards, latest addition, unless otherwise directed by the CO.

13-8

ANSI A300 - Standard Practices for Tree Care Operations including referenced Combined Federal Regulations (Utility Pruning and Emergency Service Restoration) ANSI A300 (Part 1) – Tree Pruning ANSI A300 (Part 3) – Tree Support Systems (Cabling, Bracing, and Guying) ANSI Z60.1 – American Standards for Nursery Stock ANSI Z133 – Arboricultural Operations – Safety Requirements

13.1.2.13.1.2. Emergency Spot Pruning/Trimming. Complete an emergency spot pruning/trimming within one (1) workday from the request date. Typically, emergency spot pruning/trimming includes removal of dead and/or broken limbs or removal of limbs for required clearances.

13.1.2.13.1.3. Tree and Stump Removal. Perform stump and perimeter roots removal by completely removing, and by cutting and grinding all growth to a minimum of 8 inches below grade. Stumps shall be ground within one (1) workday of the tree removal. Stump-grinding debris shall be removed the same day grinding is performed. The SP shall backfill with topsoil, and lay sod to match the existing ground grade and the type of grass. The SP shall maintain the patch area IAW manufacturer’s recommendation until the grass has become established.

13.1.2.13.1.4. Trees identified for removal shall be considered within the following categories, Large, Medium, Small and Sapling, as based on their diameter. The diameter of the tree shall be determined by measuring 4.5 feet above the ground. Trees with multiple trunks shall measure as follows: All trunk diameters shall be measured; Largest trunk diameter shall be recorded; each remaining trunk diameter shall be halved; All values will then be added together to obtain the final tree diameter.

13.1.2.13.1.4.1. Large Trees: Diameter 36” and above, remove within 10 workdays from the work order date.

13.1.2.13.1.4.2. Medium Trees: Diameter 24” to less than 36”, remove within 10 workdays from the work order date.

13.1.2.13.1.4.3. Small Trees: Diameter 3” to less than 24”, remove within 5 duty days from the work order date.

13.1.2.13.1.4.4. Saplings: Diameter 3” and smaller, remove within 2 workdays from the work order date.

13.1.2.13.2. Emergency Tree and Stump Removal. The SP shall apply the following timeframe for emergency tree and stump removal:

Large Trees: Remove within 2 workdays from the request date Medium Trees: Remove within 2 workdays from the request date Small Trees: Remove within 1 working day from the request date

13-9

13.1.2.14. Emergency Services. Upon notification of an emergency, the SP shall respond within one (1) hour to the CO and COR and initiate emergency services. Upon receiving direction by the CO, SP personnel shall begin emergency work within two hours. Oral work orders for emergency services to minimize damages or mitigate hazardous conditions shall confirm, with written notification to the CO and COR.

13.1.2.15. Special Services.

13.1.2.15.1. Special Lawn Cuts. The SP shall, upon CO or COR notification, perform special cuts.

The intent is for a trade-off so that when a special cut is requested before it would normally be due under this PWS, then the next regular cut would be delayed by same amount of time the special cut was performed early. The Government may also request special cuts under a one-time alternately funded task.

13.1.2.15.2. Planting Trees, Shrubs, and Vegetative Beds. The SP shall, upon notification by the CO or COR, perform planting of trees, shrubs, and vegetative beds such as, removal and disposal of trees, shrubs, or vegetative beds being replaced this work will be issued via separate work order.

Replacement shall occur within 15 days after removal unless otherwise agreed upon by the CO or COR and performance of maintenance after planting to include watering, pruning, and insect and disease prevention to promote survivability.

13-10

SECTION 13-2

13.2. SERVICES SUMMARY.

Performance Objective PWS Reference

Performance Threshold

13.2.1. Maintain Improved grounds

IAW standard Grounds Maintenance

PWS

13.1.2.5. No more than 3 discrepancies and/or

customer complaints per month

13.1.2.9 Maintain Semi-Improved

Grounds IAW standard Grounds Maintenance PWS

13.1.2.9 No more than 3 discrepancies and/or

complaints per month

13.2.2. Maintain Airfield Grounds

IAW standard Grounds Maintenance

PWS

13.1.2.10.1. No more than 2 discrepancies and/or

customer complaints per month

13.2.3. Maintain Unimproved grounds

IAW standard Grounds Maintenance

PWS

13.1.2.11. No more than 3 discrepancies and/or

customer complaints per month

13-11

SECTION 13-3

13.3. GENERAL INFORMATION. See Section 2 – All Services PWS, Section 2-3.

13-12

APPENDIX 13A

13A.1. PUBLICATIONS.

Number Date Title AFMAN32-1053 05 Aug 19 Integrated Pest Management Program AFI 91-212 30 May 18 Bird Aircraft Strike Hazard (BASH) Management

Program ANSI A300 – Part 1 2017 Edition Standard Practices for Tree Care Operations – Tree

Pruning Standard ANSI A300 – Part 3 2013 Edition Standard Practices for Tree Care Operations –

Supplemental Support Systems ANSI Z60.1 2014 Edition Standard for Nursery Stock ANSI Z133.1 2017 Edition Safety Standard (for Arboriculture Operations) DODI 4150.07 26 Dec 19 DoD Pest Management Program, Change 2 DODM 4150.07 Vol 1 22 Jan 20 DoD Pest Management Program Elements and

Implementation: Structure and Operation FIFRA 2003 Federal Insecticide, Fungicide, and Rodenticide Act 40 CFR 150-189 Most Current Protection of Environment, Pesticide Program

13-13

APPENDIX 13B

13B.1. WORKLOAD DATA.

13B.1.1. Estimated Grounds Workload.

Standard Description Qty Unit Events per Growing Season

Events Per Non-Growing

Season Keesler AFB

Improved - Estimated Mow Improved Grounds 444 Acres 27-40 0-6 Edge Improved Grounds 1,006,599 LF 27-40 0-3 Trim Improved Grounds 920,921 LF 27-40 0-3 Trim Perimeter Fence (total base)

37,412 LF 12-16 0-3

Trim Security Fence 30,265 LF 12-16 0-3 Trim Fire Hydrants, PIVS, transformers

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Leaf Removal 222 Acres 26-34 0-6 Fertilizer and/or Lime (add improved ground)

162 Acres 142 Acres 3 X year

20 Acres 1 x per year

Renovate Lawns ( add improved grounds)

1 Acre 3-8 0-2

Prune Shrubs and Other Plants 2,367 Each Year - Corley Street Property 14,400 SF 27-40 0-6 Semi-Improved - Estimated Mow Semi-Improved Grounds 111 Acres 15-18 0-2 Trim Fire Hydrants, PIVS, transformers

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Semi-Improved (BASH) - Estimated Mow BASH Grounds 142 Acres 27-40 0-3 Trim BASH Grounds 37,948 LF 12-16 0-3 Unimproved/MISC - Estimated Mow Unimproved Grounds 0 Acres 1 0-1 Turkey Creek - High Pressure gas line Mowing

13 miles 30 foot wide

3 1

Trim Fire Hydrants, PIVS, transformers

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Per Para 13.1.2.1.3

Pest Control 162 Acres 142 Acres 3 X year

20 Acres Yr

Herbicide Treatment 162 Acres 142 Acres 3 X year

20 Acres Yr

13-14

Standard Description Qty Unit Events per Growing Season

Events Per Non-Growing

Season Irrigation 35.56 Acres 8-16 0-25 Vegetative Beds, Rock Beds, and Related Areas

210,627 SF 0-34 0-6

Surface Drainage Ditches and Outfalls

5200 LF 6-8 0-3

Prune Shrubs and Other Plants

* Crepe Myrtles are counted as trees

4,000 Each 12-24 0-4

Tree Pruning (Estimated only, must be ALL BASE)

2,260 Each All Year

Special Cuts 6 Each Year - Plant Trees, Shrubs, and Vegetative Beds

40 Each Year -

Shrub Removal 10 Each Year -

Standard Description Qty Unit Acre Ditches 3,293.33 LF - Retention Ponds 106669.53 Sq Ft 2.45

13B.1.2. Irrigation System Locations.

Location Acres Type Larcher Boulevard Valve/L Street .45 Automatic Larcher Boulevard Valve/C Street .98 Automatic Larcher Boulevard Controller/E Street .87 Automatic Larcher Boulevard Valve /H Street 1.31 Automatic Larcher Boulevard Valve /Gate 3 .20 Automatic Berm/Larcher at Gate 3 .078 Automatic Officer’s Club (Building 3200) 1.23 Automatic Gate 7 .20 Automatic Base Operations (Building 0233) .66 Automatic 7 Level Training (Building 4329) .74 Automatic 7 Level Dorms (Buildings 2503 – 2505) 2.64 Automatic 403rd HQ (Building 0223) .79 Automatic Vosler Center (Building 2602) .47 Automatic Muse Manor (Building 2101) .13 Automatic Communications (Building 1101) 1.12 Automatic Student Dormitory (Building 6965) 5.09 Automatic Chiller Plant (Building 7405) .46 Automatic Student Dormitory (Building7404) .88 Automatic Auto Hobby Shop (Building 6013) .30 Automatic

13-15

Location Acres Type Soccer Field (Block 16) 3.54 Automatic Ball Field (Block 19) 1.74 Automatic Wing Headquarters (Building 2816) .31 Automatic Temporary Living Facility (57 block) 3 Automatic Gate 1 .06 Automatic Student Dormitory (Building 6950) 3.1 Automatic Student Dormitory (Building 6955) 3.1 Automatic Training Support Facility (Building 7310) 1.17 Automatic Student Dormitory (Building 7315) 3.1 Automatic Student Dormitory (Building 7320) 3.1 Automatic Transportation (Building 4431) .45 Automatic Jones Hall to Gerrard Hall (Buildings 6901, 6902, 6903, 6918) 2.17 Automatic Azalea Dining Hall (Building 6960) 4.27 Automatic Parade Field (Block 73) 4.82 Automatic Softball Field 4 (Block 75) 1.33 Manual Softball Field 5 (Block 75) 1.33 Manual Weather School (Building 4332) .59 Manual 2nd AF (Building 2804) .89 Manual Flagpole (Front of Building 2804) .25 Manual Softball Diamond 9 (Block 68) 1.25 Manual Softball, Diamond 10 (Block 68) 1.25 Manual Base Exchange .87 Automatic Larcher Chapel .22 Automatic Jones Hall (Building 6905) 2.35 Automatic

13-16

APPENDIX 13C

13C.1. MAPS AND WORK AREA LAYOUT/GOVERNEMENT FURNISHED

FACILITIES (GFF).

13C.1.1. Maps and Work Area Layout. See also Section 2- All Services PWS, Appendix, 2C:

Maps and Area Layout/GFF

13C.1.1.1. Grounds Area. See Attach 1d1 – Grounds Areas.

13C.1.1.2. Ditches and Retention Ponds. See Attach 1d1 – Ditches and Retention Ponds.

13C.1.1.3. Flower Beds Grounds. See Attach 1d1 – Flower Beds Grounds.

13C.1.2. GFF. See Section 2- All Services PWS, Appendix, 2C: Maps and Area Layout/GFF

13-17

APPENDIX 13D

13D.1. CONTRACT DATA REQUIREMENTS LIST (CDRL). The SP is required to provide the data as indicated below to the COR. All reports, submittals, logs, and information provided to the Government shall be electronic and compatible with Microsoft Office, such as Excel, Word, and others. “Compatible” means the document can be opened using the appropriate Microsoft Office component without any discernible effect on the text (e.g., loss of data) or the formatting of the document:

Report Title Description/Form Submit Through/To Date Due PWS Reference

GROUNDS

1301. Work Report The SP shall provide a monthly report listing all grounds work accomplished

COR Second business day of each month

13.1.2.1.3

1302. Damage and Injury Reports

Listing of SP caused damage and injuries

CO/COR Within 48 hours after the event and repaired or replaced by the SP with 15 workdays after identification or notification.

13.1.2.1.3

1303. Irrigation System Maintenance and Repair Report

Any work accomplished on the irrigation systems.

COR Second business day of each month

13.1.2.6.1

1304. Hazardous Materials/Herbicides Inventory and Usage Report

Usage report identifying hazardous material and herbicide use.

COR Second business day of each month

13.1.2.5.4

1305. Soils Report Report/results of any soil testing accomplished for fertilization

COR Two days prior business to fertilization

13.1.2.8.1

13-18

APPENDIX 13E

13E. COLLATERAL TASKS (DUTIES). Reserved.

13-19

APPENDIX 13F

13F.1. GOVERNMENT FURNISHED PROPERTY (GFP). See Section 2 – All Services PWS, Appendix 2F, GFP.

13-20

APPENDIX 13G

13G.1. GOVERNMENT FURNISHED TRAINING.

Course Location Type of Training Approximate Length

1. Keesler AFB Flight Line Vehicle Operator Training

Keesler AFB Contractor Hands-On 1-3 Duty Days

NOTES:

1. Training course titles, location, type and length are subject to change as the needs of the Air

Force and policy change.

2. The Government has a NTE annual cost for all Government Furnished Training (GFT). It is the SP’s responsibility to fund all required/necessary personnel training once the government exhausts available funding. The Government will provide access to GFT with proper coordination through the respective functional areas and ACO approval, regardless of who provides the funding.

3. Courses listed in ‘J’ Appendices, under Special Training, Certification, or Licensing Requirement` column are required and will be funded by SP.

13-21

APPENDIX 13H

13H.1. ACRONYMS.

Acronym Definition

ACO Administrative Contracting Officer AF Air Force AFB Air Force Base AF Form Air Force Form AFI Air Force Instruction AFMAN Air Force Manual ANSI American National Standards Institute BASH Bird Air Strike Hazard BLDG Building BOS Base Operating Support CE Civil Engineer CDRL Contract Data Requirement List CO Contracting Officer COR Contracting Officer Representative DoD Department of Defense DoDI Department of Defense Instruction GFE Government Furnished Equipment GFF Government Furnished Facilities GFT Government Furnished Training HQ Headquarters HQ AETC Headquarters Air Education and Training Command HQ USAF Headquarters United States Air Force IAW In Accordance With IG Inspector General IPM Integrated Pest Management IPMIS Integrated Pest Management Information System ISWM Integrated Solid Waste Management LF Linear Feet MCP Maintenance Control Program MDG Medical Group NA Not Applicable O&M Operations and Maintenance

13-22

Acronym Definition

PES Potential Explosive Sites PPE Personal Protective Equipment PWS Performance Work Statement USAF United States Air Force VHF Very High Frequency

13-23

APPENDIX 13I

13I.1 OPERATIONS PLANS (OPLAN) AND SUPPORT AGREEMENTS. See Section 2 – All Services PWS, Appendix 2I, OPLAN and Support Agreements.

13-24

APPENDIX 13J

13J.1. SPECIAL TRAINING, CERTIFICATION, AND LICENSING REQUIREMENTS.

See also Section 11 – Operations Management PWS, Appendix 11J, Special Training, Certification, and Licensing Requirements for Entomology Certification.

Position At Least

Special Training, Certification, or

Licensing Requirement

Required by Statue, Institution, Organization, or Instruction

1. Person responsible for Lawn/Landscape Irrigation Systems

License Required by the State of Mississippi

State of Mississippi State of Mississippi

File details come from the government source that posted it. Updated .