Attach 12 - Work Breakdown Structure (WBS) Template_28 Feb 22.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- FA300221R0012
View the file
Other files
Show 40 more
Latest 50 of 104 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Keesler WBS
| PWS PARA | REQUIREMENT | CLIN | LABOR CATEGORY/ | |||||
| POSITION | LABOR CLASS CBA/Exempt | # of FTEs | Position Description | Cross Utilization Information | ||||
| EXAMPLE | EXAMPLE | EXAMPLE | EXAMPLE | EXAMPLE | EXAMPLE | EXAMPLE | EXAMPLE | |
| 23.1.2.3 | Asset Management | |||||||
| CLIN 0001 | Supply Technician | CBA | ||||||
| 1 | Responsible for stocking, storing, issuing, receiving (i.e., HAZMAT, Mobility), inspection management, transferring, and accountability for DoD supplies and equipment to include HAZMAT and Mobility items. |
Warehouse Technician
| 23.1.2.4 | Central Storage | CLIN 0002 | Warehouse Technican | CBA | |
| 1 | Perform warehouse management functions to include storing and accounting for all in-warehouse supply and equipment to include classified and sensitive items, Nuclear Weapons Related Materials (NWRM) IAW AFI 20-110, War Consumables Distribution Objective (WCDO) items; selecting items to be issued, shipped or transferred; conducting warehouse validations; maintaining central locator functions; performing warehouse inspection functions; and managing the staging area for delivery of items. | Supply Technician |
&"-,Bold"Work Breakdown Structure (WPS) Template FA300221R0012 Attachment 12 28 Feb 22
File details come from the government source that posted it. Updated .