Vance FOS Pre-Proposal/Site Visit 1-On-1 Questions Answers.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3002-13-R-0008
Pre-Proposal Conference/Site Visit
1-On-1 Q&A
7 Jan 2014
Flight Operations Support
Vance AFB, OK
Site Visit
One-On-One Sessions
Questions and Answers
1. What are the number of shifts required or currently being operated for phase and backshop?
Answer: Shifts are based on the Service Provider’s staffing plan.
2. Equitable adjustments for CBA: When offerors bid, if off by any measure for payscale, will there be opportunity for equitable adjustment?
Answer: No.
3. Will the average seniority of employees be provided?
Answer: This information will be provided if it becomes available.
4. Are there any government personnel supporting the maintenance side of the contract?
Answer: No, military/government personnel are performing as Contracting Officer
Representatives.
5. With munitions are there any special munitions handling requirements?
6. Are there munitions requirements for transient munitions?
7. Was the number of aircraft present in the hangars, during the site visit, representative of the number of aircraft?
Answer: Yes.
8. In the avionics shop, is what we saw during the site visit representative of workload?
Answer: Yes, with the stand-up of COMBS the in shop maintenance is minimal.
9. Incumbent employees: Will there be accurate employee records on personnel training available (i.e. certifications, training progress/completion)?
10. Software systems: What will be provided?
Answer: Please see PWS section 2.1.17 for information on Systematic Management and
Reporting Tool (SMART).
11. On T-38s, why was there a spike in maintenance man-hours?
Answer: It was an anomaly due to data integrity.
12. Was any software created by the incumbent?
Answer: No
13. In review of the historical data, we could not find workcenter codes.
Answer: Appendix 3BBM (Vance IMDS Workcenters) was added to PWS, Section 3.
Also, see Off-Equipment workload history IMDS workcenters tab.
14. Is there anyone on flight operations that has to have a classified info security clearance?
Answer: Yes, please see PWS, Section 2, paragraphs 2.1.6.4 – 2.1.6.6.3.
15. Language in the PWS is different than in H-10. PWS section 2.1.21 and H-10 language conflict. If the service provider is non-conforming, they should be afforded time to perform a root cause analysis and take corrective action(s) as opposed to taking money away for every day the problem is not conforming. H-10 currently incentivizes quick responses, but not necessarily quality solutions. Will the Government reconsider H-10 language to correspond with the PWS?
Answer: Yes, H-10 language is being revised to correspond with the PWS.
16. Some of the vehicles in the motor pool are part of the BOS contract for services typically performed as part of the FOS contract. Is there a way that these services will be coordinated with one another?
Answer: Please see Appendix 3, 6, and 21 FF. No Government vehicles will be provided.
The U-drive vehicles in the motor pool are for Government personnel mission related duties.
17. PWS: Paragraph 2.1.18.1.4 references target cost. Is this correct?
Answer: No. PWS, paragraph 2.1.18.1.4 is being revised to read firm fixed price.
18. Is a reduction anticipated in the pilot training program?
Answer: No reduction is anticipated.
19. Section L, (FAR clause 52.215.20), references certified cost and pricing data. Is it your intent to request certified cost and pricing data?
20. What is best value LPTA?
Answer: FAR 15.101 refers to LPTA as part of the best value continuum.
21. Without a record of past performance, past performance can be rated as unknown, but could still be acceptable?
Answer: Yes, see DFARS 215.300 for link to Department of Defense Source Selection
Procedures, Appendix A, paragraph A.2.1.2 note.
22. Aircraft Availability (AA): How often are we trying to fly aircraft and use AA? Normally manning is planned by the number of goes and number of sorties.
Answer: See PWS, paragraphs 3.1.1.6.5 and 3.1.1.6.6. and paragraph 3.2.2., specifically;
the Note that states, “The variable requirement throughout the year is prime fliers and spares (AA G-factor), that based on weather, daylight window, student load, etc. will drive variations in AA aircraft provided to support day to day, week to week and month to month mission changes/demands.”
23. Balancing flying requirement to the health of the fleet: What kind of relief will be provided to the support provider?
Answer: None. Aircraft Availability (AA) is the requirement and a performance objective and threshold.
24. If shelters are not real property, what about the engine test cell and hush house?
Answer: The pads are real property; however, the facilities are classified as equipment items.
25. Is there workload data for flightline shelters?
Answer: See appendix 3BB.2, Item v.
26. Is workload data included in the maintenance flying hour estimate?
27. The requirement for TCMax is new. Is TAS currently used?
Answer: No. See PWS, paragraph 3.1.11.12. Checkmate is currently being used for tool control and per discussion with the TCMax representative ((419) 913-1587), the
Checkmate data will export into the TCMax database.
28. Are there any other AETC contracts that has H-10 clause?
Answer: There are no known AETC contracts with a similar H-10 clause.
29. What is the anticipated reaction of the workforce due to the H-10 clause? Is it intended to incentivize contractor?
Answer: The goal is to monetarily drive higher quality and better performance.
30. The metric threshold in the H-10 clause is very specific on holding 4%. Is there an example where this quality program has been used that was effective?
31. Is there any guidance on how to implement, encourage, or incentivize the workforce to achieve 4%?
32. Has AETC done any metrics on standards that have been met to make sure they are realistic and achievable?
Answer: The metrics are realistic and achievable.
33. The current contract has a standard and then you build up to earn fee, correct?
Answer: Yes, with the award fee in the current contract, fee is obtained through higher performance; however, this contract will not have an award fee.
34. With 17 January 2014 as the due date for questions, what is the anticipated Answer date?
Answer: The anticipated Answer date is 24 January 2014.
35. Vehicle maintenance: Many vehicles are company owned, and the motor pool onsite is maintained by the current contractor. Is that something that will continue with new contract?
Answer: No. The motor pool is under the BOS contract for repair of Government-owned vehicles.
36. Training for fire department at Kegelmen: Will the BOS RFP mandate that fire department be provided training by FOS?
37. Will a manpower seniority list be released?
Answer: This information will be provided if it becomes available.
38. Being LPTA, how do you intend to level the playing field to account for CBA wages?
Answer: Manpower seniority information will be provided if it becomes available.
39. Are small business goals going to remain the same?
40. Will primes be expected to release company names for small business subcontractors or just small business goal percentages?
Answer: Names and percentages shall be released in accordance with Section M.5.3.