I-1000504-R03 Phase 2 - Service and Maintenance Check list.pdf
PDF 1 MB Posted
- Attached to
- Ascension Base Operations Support Federal contract opportunity
- Solicitation number
- FA252122R0011
About this file
This document provides details for a Request for Proposal (RFP) for Ascension Base Operations Support services. The RFP seeks proposals for non-personal services to provide base operation services and mission support to the Space Launch Delta 45 and Royal Air Force at Ascension Auxiliary Air Field. Required services include operations and maintenance, tenant and mission support, non-mission communications, airfield management, public health, medical, emergency response, fire protection, security, dining and lodging. The acquisition is a Total Small Business set-aside. Proposals must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module by 1 June 2022. Questions are due by 6 May 2022. The RFP follows on from Solicitation Number FA2521-21-R-0023 under the new number FA252122R0011. The Department of the Air Force Space Command and Ascension Auxiliary Air Field are involved.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© Copyright Emergya Wind Technologies BV, The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
Netherlands.
Emergya Wind Technologies BV
Engineering
Category: Manual Page 1 / 37
Doc code: I-1000504.docx
Created by: DF Creation Date: 20-03-18
Checked by: JB Checked Date: 18-04-18
Approved by: DF Approved Date: 18-04-18
Title:
Phase 2 - Service & Maintenance
Check list
Revision Date Author Approved Description of changes
03 06-03-20 DF DF
Added tool registration and removed oil log cards
02 09-12-19 DF DF
Removed check outer seal yaw and pitch bearing
01 27-06-18 DF DF Added document control
Category: Revision: 03
Title: Phase 2 - Service & Maintenance Check list Page 2 / 37
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
Contents
1 Maintenance information sheet _____________________________________________ 3
2 Maintenance Checklist ___________________________________________________ 4
3 Maintenance Log cards __________________________________________________ 35
3.1 Pitch bearing wear limit log card ___________________________________________________ 35
3.2 Blade angle log card _____________________________________________________________ 36
3.3 Yaw gear teeth log card __________________________________________________________ 36
3.4 Yaw bearing wear limit log card ____________________________________________________ 36
3.5 Generator air gap log card ________________________________________________________ 37
Title: Phase 2 - Service & Maintenance Check list Page 3 / 37
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
1 Maintenance information sheet
Order number:
Project number:
Serial number Nacelle
Turbine and Customer data:
Customer:
Location:
Tower height
Blade diameter
Technician(s)
Tool Registration
Tool Make and Model Serial Number Calibration Date
Electrical Torqueing
Hydraulic Torqueing
Torque multiplier
Mechanical Torque wrench 1
Mechanical Torque wrench 2
Electrical measurement
Mechanical measurement
Date:
Type Maintenance:
visit 500 hrs
½ year 1 year
5 year 10 year
Remarks:
Title: Phase 2 - Service & Maintenance Check list Page 4 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
2 Maintenance Checklist
Note
All paragraph references in the checklist are references to the I-1002050 “Phase 2 – Service & Maintenance manual”.
Tasks without a color code are applicable to all DW52/54/58/61 - Phase 2 turbines
Tasks marked in “Orange” are only applicable to DW58/61
Tasks marked in “Green” are only applicable to DW52/54
Tasks marked in “Purple” are only applicable to the “New” EN 14399 tower bolts h rs m a in te n a n c e
½ y e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n
O th e r m a in t.
te rv a l
Item / Component (Visual) Inspection Maintenance Activity
R e f.
p a ra g ra p h
S e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O K p a ir e d
Y /N
/N .A m a rk s
Y rs
S y m
GENERAL MAINTENANCE
▲ ▲ ▲ ▲ Administration Are you familiar with safety instructions? 1.1.1 N/A
▲ ▲ ▲ ▲ Administration Are you familiar with weather limits? 1.1.2 N/A
▲ ▲ ▲ ▲ Administration You know how to fill in this checklist? 1 N/A
▲ ▲ ▲ ▲ Administration Are all applicable (service) modifications performed? N/A N/A
Title: Phase 2 - Service & Maintenance Check list Page 5 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ ▲ ▲ Administration Checked for remaining items? N/A N/A
▲ ▲ ▲ ▲ Administration Checked turbine history? 1.1.3 N/A
▲ ▲ ▲ ▲ Administration All PPE, tools and material with you? 1.1.4 N/A
▲ ▲ ▲ ▲ Administration
Are you familiar with the maintenance procedures for the phase 2 – Service & Maintenance manual I- 1002050?
All N/A
HSE MAINTENANCE
υ υ υ υ Emergency Stop Button
Activate E-Stop
Confirm Main Breaker opens and turbine stops Alarm 307 and 104 are present Reset fault
12.1.5. 012
▲ ▲ ▲ ▲ First Aid box tower base Inspection sticker
Case integrity Note down expiry date 2.1.1 000
Fire Extinguisher tower base Check inspection sticker Record Date 2.1.2 000
Title: Phase 2 - Service & Maintenance Check list Page 6 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ Stickers and Pictograms
Check if all stickers are present and in good condition
Replace if required 2.1.3 000
▲ ▲ ▲ ▲ Fall Arrest cable
Check for damage
Cable tension
Certification
Record date
Any issues report immediately
10.13.1
▲ ▲ ▲ ▲ Ladder Certification
Damage Record date 10.13.4 007
▲ ▲ ▲ ▲ Service Lift and rescue set
Inspection sticker date
Case is sealed
Correct rope length
If box is open; check vacuum bag
Record date
Replace rope when not vacuum
10.13.5 10.13.6
▲ ▲ ▲ ▲ Attachment Points
Check for cracks/wear
Certification
Security of attachment
Record date 10.13.2 036
▲ ▲ ▲ ▲ Fall Protection Device Certification Record date 10.13.3 036
▲ ▲ ▲ ▲ Fire Extinguisher Nacelle Check inspection sticker Record Date 2.1.2 036
Title: Phase 2 - Service & Maintenance Check list Page 7 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ ▲ ▲ First Aid box Nacelle Inspection sticker
Case integrity Note down expiry date 2.1.1 036
▲ ▲ ▲ ▲ Rescue set
Inspection sticker date
Case is sealed
Correct rope length
If box is open; check vacuum bag
Note inspection date
Replace rope when not vacuum
8.5 036
Lighting & Emergency
Lighting
Check lighting is functioning
Activate RCD in
Converter Cabinet 3F7 Replace Tubes/Fittings if needed
8.6 011
ROTOR MAINTENANCE
▲ All Types of Blades
Visual check with binoculars Check the blade root for cracks in the laminate (Internal)
Check platform
Listen for unusual noises with ≥15rpm (External)
5.3.1 009
Title: Phase 2 - Service & Maintenance Check list Page 8 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ All Types of Blades
Detailed external inspection with binoculars Detailed internal inspection Lightning connection
Listen for unusual noises with ≥15rpm (External)
5.3.2 009 υ υ Check zero alignment 4.12 009 See log card 3.2
Α
DW52/54 Blade studs
5% torque check
500Nm SW36 2.3.1
Α Α 100% torque check
665Nm SW36
Α
DW58/61 Blade studs
5% torque check
560Nm SW36 2.3.1
700Nm SW36 υ
Pitch gearboxes and pinions
Check pinion teeth for wear Check bearing teeth wear at 0° blade angle
Check pinion clearance
(0.3 – 0.4 mm) 4.2
Clearance pinions:
1: …………. mm
2: …………. mm
3: …………. mm
10 φ Replace gearbox oil, Shell Omala GX320 2.9.2
Title: Phase 2 - Service & Maintenance Check list Page 9 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Ψ Ψ Ψ
Lubricate Brevini gearbox Mobil SHC
460WT ±50g per Gearbox
4.6.2.1
Check oil level
Check for leaks & integrity of seals
4.6.1.1 4.6.2.2
Gearbox to Hub M24 bolts
5% torque check 50Nm
SW19
2.3.1
65Nm SW19
▲ ▲ ▲ Pitch Bearing Check inner seal 4.3
Ψ Ψ Ψ Ψ
Cleaning
Lubrication teeth, Klüberplex AG 11-461
4.7.3
Measure pitch bearing raceway & fill out log card
4.4
See log card 3.1
Title: Phase 2 - Service & Maintenance Check list Page 10 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Α Α Overspeed support to Hub 100% torque check M12 bolts, 45Nm SW19 2.3.4
Pitch bearing to Hub M24 bolts
5% torque check
600Nm SW36 2.3.1
750Nm SW36
Ψ Ψ Ψ Ψ DW52/54 Pitch bearing Lubrication 400g
Klüberplex BEM 41-141 per blade
4.7.1
Ψ Ψ Ψ Ψ DW58/61 Pitch bearing Replace Klüberplex BEM
41-141 auto dispensers 4.7.2
▲ ▲ ▲ ▲ Pitch Motor Cable chafing
Connections Report/Repair Damage 2.7 υ υ υ
Check brake gap and adjust when necessary Listen for unusual noise
4.5.1.2
Check lenze drive settings
4.5.1.1 4.5.2.1
Title: Phase 2 - Service & Maintenance Check list Page 11 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m υ υ υ
Overspeed Switch
Check condition
Cabling Functional Test 4.10
▲ ▲ ▲ ▲ Cable Work
Chafing
Correct routing
Excitation junction box
Report/Repair Damage 4.9 υ υ
Lightning Protection Check condition
Continuity test
Measure air gap at bearing 0.5mm maximum
Freedom of movement
4.11
▲ ▲ ▲ ▲ All types of Slip Ring Electrical connections
Alignment 4.13
100% torque check M12 bolts, 45Nm SW19 2.3.4
▲ Slip Ring MR
Clean slip ways starting
5 years post commissioning.
4.13.2
▲ ▲ ▲ ▲ Hub Cleaning 2.5
Title: Phase 2 - Service & Maintenance Check list Page 12 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Α Hub to Main bearing M24 studs
2.3.1
Service brake to Generator
M24 bolts
2.3.1
ROTOR CONTROL CABINET MAINTENANCE
▲ ▲ ▲ ▲ Cable work
Check cables are connected properly Check Cables are undamaged
6.14.1.1 υ υ υ Components Check all components
Check Function of Fans by adjusting Thermostat Check heating by adjusting Thermostat Clean/Replace filters
4.14.1.2
Title: Phase 2 - Service & Maintenance Check list Page 13 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m υ υ υ υ Supercapacitor Perform an EM test listen for smooth operation (no scraping)
4.14.1.3
▲ ▲ ▲ Text on RCC cabinet Is it readable If not clean or replace 4.14.1.4 009
▲ ▲ ▲ ▲ Service Switch Condition Functional Test 4.14.1.5
▲ ▲ ▲ ▲ Limit Switches Condition Functional Test 4.14.1.6
▲ ▲ ▲ ▲ DW 58/61 IPC Sensors Status check 4.14.1.7
▲ ▲ ▲ ▲ Cleaning Clean all grease, oil and dirt from hub and components
4.15
Title: Phase 2 - Service & Maintenance Check list Page 14 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
GENERATOR AND MAIN BEARING MAINTENANCE
▲ ▲ ▲ ▲ Grease outlets
Remove old grease and clean grease outlets Replace bottles if necessary
6.1.1 013 ψ ψ ψ ψ
Grease system
Check for leaks
Check hose connections
Check grease level
Check pump interval.
1 min every:
- IMO 200 min
- RE 720 min
Fill up Reservoir with
Klüberplex BEM 41-141:
- IMO ≤30mm from top
- RE ≤150mm from top Ensure hoses are secure
6.1.2
Disconnect a hose from main bearing, activate grease pump on DMS – check grease is coming out
6.1.2.1
Grease lubrication system
M10 Bolt Connections
100% torque check M10 bolts, 25Nm SW17
2.3.4 015
Title: Phase 2 - Service & Maintenance Check list Page 15 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ ▲ ▲ Distributor Check for leaks Ensure hoses are secure 6.1.3 014
▲ ▲ ▲ ▲ Bearing Seals Check seals are working Clean excess grease (no cleaner to contact seal) 6.2
N λ Main bearing grease sample
Take sample and make sure to label and add information in 6.3 – step 7.
6.3 014
Α Main bearing and Service brake spacer to Generator
M24 bolts
5% torque check
600Nm SW36
2.3.1 015
Α Α 100% torque check
750Nm SW36
2.3.1 015
▲ ▲ ▲ ▲ Cable work
Check cable work, chafing, correct routing and connections
6.5 011
▲ ▲ ▲ ▲ Cleaning
Remove covers and clean generator and generator pipe.
(Converter disabled)
6.6 013
Title: Phase 2 - Service & Maintenance Check list Page 16 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
WEATHER STATION MAINTENANCE
Α
Α
Α M12 Bolt Connections Check for corrosion
100% torque check M12 bolts, 45Nm SW19 2.3.4
▲ ▲ ▲ ▲ Cable work
Check cable, chafing, insulation, correct routing, connections
7.2
▲ ▲ ▲ ▲ Ladder Check earthing of ladder
Check for corrosion Report/Replace 7.3
Wind Vane and Anemometer
Condition
Bearings, rotate by hand and confirm it turns smoothly.
Replace vane paddle if bent Replace cups when damaged
7.3
Check windspeed accuracy υ υ υ Check wind vane alignment 7.4
Title: Phase 2 - Service & Maintenance Check list Page 17 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Weather Station Junction
Box
Damage
Leaks
Shielding
Check Heating, confirm
24v DC in WSJB 7.5
NACELLE MAINTENANCE
▲ ▲ ▲ ▲ Check Parameters Parameters on DMS are correct. See 8.1 Correct if needed 8.1 012
Α Nacelle to Generator M24
Bolt Connections
5% torque check
600Nm SW36 2.3.1
Α Α 100% torque check
750Nm SW36 υ υ υ υ Hydraulic Brake
Check if reservoir filled
(At least half and max 2cm under top)
Check for leaks
Brake pads
Hydraulic Hose
Fill up with Mobil DTE
11 Mineral oil ISO VG
Activate brake at NCC, check brake applied within 5s
Test pressure reaches
~190 Bar in <20s Measure brake pad thickness (minimum 12mm)
8.2 034
Title: Phase 2 - Service & Maintenance Check list Page 18 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
R e m a rk
▲ Hydraulic Brake Bleed hydraulic system 8.2.5 034
* Bleed always after replacing parts
Grease lubrication system
M10 Bolt Connections
2.3.4 015 υ υ υ
Hoisting mechanism
Damage to housing, chain, hook, cable
Check the function of the brake and all controls, up/down/E-stop
8.3
Measure the slipping force (between 480 – 520 kg). Adjust when needed.
8.3.4
Chain hoist M12 Bolt
Connections bolts, 45Nm SW19
Title: Phase 2 - Service & Maintenance Check list Page 19 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
DW58/61 – ≥900kW or Hot climate configurations
Generator cooling fan system
Remove inlet guard and inspect impeller Clean fan internals 8.7.1 017
Inspect vibration absorbers for cracks Report/Replace 8.7.2 018
▲ ▲ ▲ ▲ Inspect seals for cracks Report/Replace 8.7.4 018
Check fan for leaks during operation
8.7.5 018
Α Α Α Cooling fan support to
Nacelle housing M10 bolts
8.7.3 015
Α Α Ladder bracket M12 Bolt
2.3.4 015
▲ ▲ ▲ ▲ Rotor lock Check operation Grease thread slightly with Mobil SHC 460 WT
8.11 014
Α Rotor lock to Generator M24 Bolt Connections
5% torque check
600Nm SW36 2.3.1
Α Α 100% torque check
Title: Phase 2 - Service & Maintenance Check list Page 20 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
YAW SYSTEM MAINTENANCE
υ υ υ Yaw Motors
Cables
Connections
Yaw left and right, listen for unusual sounds Measure current using clamp meter (<2A)
8.8.1 017 υ υ υ
Yaw Gearbox and pinions
Check pinion teeth for wear, parallelism and cracks.
Measure and record backlash at green teeth.
Re-adjust when needed (0.55mm)
8.8.4.1 8.8.4.2
See log card 3.3
10 φ Replace gearbox oil, Shell Omala GX320
2.9.2 014 ψ ψ ψ
Lubricate Brevini gearbox Mobil SHC 460WT ±50g per Gearbox
8.8.2.2.1 014
Oil Level
Check of leaks & integrity of seals
8.8.2.1.1 8.8.2.2.2
Α Yaw Gearbox to Yaw base plate M20 Bolt Connections
5% torque check
320Nm SW36
2.3.1 015
Title: Phase 2 - Service & Maintenance Check list Page 21 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Α Α 100% torque check
400Nm SW36
Α Yaw base plate to Nacelle housing M24 Bolt Connections
5% torque check
600Nm SW36 2.3.1
Α Α 100% torque check
750Nm SW36
Yaw Bearing
Check inner seal 8.8.3.1
Clean grease outlet holes
8.8.3.2 014 ψ ψ ψ ψ
Lubricate internal bearing 400g Mobil SHC
460WT
8.8.3.3 014 ψ ψ ψ ψ Lubricate all teeth with
Klüberplex AG11-461 8.8.4.3
▲ ▲ ▲ ▲ Inspect braking Surface Clean braking surface with acetone 8.8.5
Title: Phase 2 - Service & Maintenance Check list Page 22 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m υ υ
Measure Yaw bearing raceway & fill out log card
8.8.3.4
See log card 3.4
Check bearing teeth for wear and cracks
8.8.4 036 See log card 3.3
Α Yaw bearing to Nacelle housing M24 Bolt Connections
5% torque check
600Nm SW36 2.3.1
Α Α 100% torque check
Yaw brake system Excessive wear
Contamination
Replace puck if not visible in hole 8.8.5
Α Α Set correct brake tension
Yaw brakes to Nacelle housing M16 Bolt Connections
5% torque check
160Nm SW24 2.3.1
Α Α 100% torque check
200Nm SW24
▲ ▲ ▲ ▲ Nacelle Cable Work
Chafing
Insulation
Correct routing
8.17 011
Title: Phase 2 - Service & Maintenance Check list Page 23 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
TWIST SENSOR & CABLE LOOP MAINTENANCE
Twist Sensor
Excessive wear on sensor teeth Cabling
Check clearance (1mm)
8.9 υ υ υ
Check reading on DMS
Test end switches by rotating gear (3.2 L & R)
▲ ▲ ▲ Cable Work
Power cables are not tied together Damage
8.10 011
Α Α Twist sensor M16 Bolt
100% torque check M16 bolts, 110Nm SW24
2.3.4 015
NACELLE CONTROL CABINET MAINTENANCE
Α Α Control Cabinet M8 Bolt
100% torque check M8 bolts, 12Nm SW13
Title: Phase 2 - Service & Maintenance Check list Page 24 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ ▲ ▲ Plug Connections Security of connections to the cabinet side
▲ ▲ ▲ ▲ Cable Work
Damage
Loose Connections
Routing of fibre optic cable
Yaw left and right, listen for unusual sounds Measure current using clamp meter
8.13
▲ ▲ ▲ ▲ Motor Safety Switches Check setting N23Q1, Q3, Q5 (2.5A) 012 υ υ υ Heater
Check setting N12S5
(10°C)
Test function by turning thermostat to a higher value than ambient temperature υ υ υ Smoke Detector Test function by using smoke spray. Confirm alarm in DMS. Reset.
8.12 012 υ υ υ Acceleration and Vibration
Tightness of sensors in generator frame (Hansford)
Security of attachment to NCC (DIS)
Apply vibration to sensors and ensure values change on DMS (Hansford)
Remove sensor and vibrate, ensure alarm in
DMS (DIS)
8.14.1
Title: Phase 2 - Service & Maintenance Check list Page 25 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m υ υ υ Emergency Stop
Push E-Stop on NCC
Confirm alarm and blades pitched to limit switch
8.14.2 012 υ υ υ Power Supply Measure output (24.5V
DC)
Adjust if necessary
8.14.4 012
▲ ▲ ▲ ▲ PLC
Run LED’s are green
Ready LED’s on each module
8.14.5 012
▲ ▲ ▲ ▲ Nacelle Cleaning Clean and clear Nacelle and all components 8.15
GENERATOR MAINTENANCE
Α
Α
Star and Stator Connection Boxes
Cables
Insulation
Lugs
Nuts
Washers
Overheating
Torque check
Replace defective washers and nuts
9.1
PT100 Temperature
Sensors Compare and record temperatures 9.2
Title: Phase 2 - Service & Maintenance Check list Page 26 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Α Α Rotor poles M12 Bolt
2.3.4
Generator rotor plates M8
Bolt Connections
100% torque check M8 bolts, 12Nm SW13 2.3.4
▲ ▲ ▲ ▲ Stator and Rotor windings Winding insulation condition
Cleaning and remove debris
▲ ▲ ▲ ▲ Excitation cable check Check cable 9.8
▲ ▲ ▲ ▲ Rotor and Stator Frame Paintwork
Water Ingress
Thoroughly inspect welds Report cracks immediately
9.4
Air Gap
Measure with feeler gauge >5mm 9.5.1
Measure gap at 12,3,6 and 9 O’Clock. Record findings.
9.5.2
See log card 3.5
Α
Α DW58/61 Closing Plates
Damage
Security
Confirm the generator is still airtight.
Secure manhole cover
9.6
Title: Phase 2 - Service & Maintenance Check list Page 27 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
▲ ▲ ▲ ▲ Generator Cleaning Clean and clear
Generator and all components
9.3
TOWER MAINTENANCE
Top flange to Yaw bearing
M24 Bolt Connections All Towers
5% torque check
600Nm SW36 2.3.2
M24 “Old” DIN Tower Bolt
Connections
HH35, HH40, HH50, HH75
5% torque check
600Nm SW36 2.3.2
M27 “Old” DIN Tower Bolt
Connections
HH75
5% torque check
888Nm SW41 2.3.2
1110Nm SW41
M30 “Old” DIN Tower Bolt
Connections
HH30, HH40, HH50, HH75
5% torque check
1120Nm SW46 2.3.2
1400Nm SW46
Title: Phase 2 - Service & Maintenance Check list Page 28 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Α
M24 “New” EN 14399 Tower Bolt Connections
HH35, HH40, HH46, HH50,
HH69 and HH75
100% Insp. torque check (see Km) SW41
2.3.3
Α Min. 5% Maint. torque check (see Km) SW41
Α Min. 10% Insp. torque check (see Km) SW41
M27 “New” EN 14399 Tower Bolt Connections
HH75
100% Insp. torque check (see Km) SW46
2.3.3 check (see Km) SW46 check (see Km) SW46
M30 “New” EN 14399 Tower Bolt Connections
HH30, HH40, HH46, HH50,
HH69 and HH75
100% Insp. torque check (see Km) SW50
2.3.3 check (see Km) SW50 check (see Km) SW50
Title: Phase 2 - Service & Maintenance Check list Page 29 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Tower General
Clean the tower 10.2 013
▲ ▲ ▲ ▲ Check for corrosion 10.8 036
▲ ▲ ▲ ▲ Check for paint damage Painting as necessary 10.5 036
Cable Work
Damage, pay extra attention around cable loop Sagging
Tightness of cable clamps
Main power cables must not be ty wrapped together, remove if this is the case.
10.4
▲ ▲ ▲ ▲ Welding
Flange welds
Door welds
Can welds
Report any cracks immediately 10.7
▲ ▲ ▲ ▲ Step
Fixings
Earthing of steps to tower Corrosion
Door holding device position
Torque check bolt connections 10.6
Title: Phase 2 - Service & Maintenance Check list Page 30 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m ψ ψ ψ ψ Door
Rubber door seal
Security of brass holding blocks Adjustment of mechanism Check wear of surge absorber
Check function of door lock Lubricate door hinges with Mobil 460WT (Not Marine)
10.9 018 υ υ υ
Lighting & Emergency Lightning
Check condition
All tubes are working
Test emergency lightning by tripping 3F7 in converter.
10.10 011
PARAMETERS CHECKS
υ υ υ υ Nacelle position
Check untwisted direction is correct
Confirm using compass
Adjust when >5°
11.1 012
Title: Phase 2 - Service & Maintenance Check list Page 31 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
CONVERTER CABINET MAINTENANCE
υ υ υ Smoke Detector Test function by using smoke spray. Confirm alarm in DMS. Reset.
12.1.2 011
Low Voltage and High Current Connections
Visual check of security
Overheating
Discoloration
12.1.3 011 υ υ υ υ Residual Current Device
Push test button on 3F7
Ensure emergency lightning is activated Reset 3F7
12.1.4 011
▲ ▲ ▲ ▲ Pump and Fans Functional test
Check and clean radiator is necessary
12.1.6
Cable Work, Panels and
Generator Coils.
Damage
Routing
Check panels are secured and undamaged
Report damage or missing items
12.1.7 011
Title: Phase 2 - Service & Maintenance Check list Page 32 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
Setec cooling system
Check for leaks
Check liquid Level 12.2.1 φ Replace cooling liquid every 5 years
12.2.2 014
Freqcon cooling system
Check intake filters Replace when cannot be cleaned
12.3.2 018
Visual inspect electrical connections, corrosion, damage and contamination
12.3.1
Φ
Replace cooling liquid every 2 years Measure expansion tank pressure (between 0.8 -
1.2 bar)
12.3.3 12.3.4
Title: Phase 2 - Service & Maintenance Check list Page 33 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
AFTER MAINTENANCE
▲ ▲ ▲ ▲ Check control system
Check clamps on relays, auxiliary contacts and contactors
Replace when needed 14.1 012
▲ ▲ ▲ ▲ Finishing up
Check oil trays
All covers & cabinets closed
Clean all surfaces, rags, empty packages and tools
Return switches to
“remove control” Reset Backman PLC when modem is present Turn off internal lights
14.2 012 λ
Update Software
Update PLC software 15.1 012 λ Update Converter software
15.2 012
Title: Phase 2 - Service & Maintenance Check list Page 34 / 37
Symbol meaning: Α = Tightening bolts ▲ = General/visual φ = Replace ψ = Lubricating υ = Test / Measure λ = On request
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The Netherlands.
h rs m a in te n a n e a r m a in te n a n e a r m a in te n a n e a r m a in te n a n e r m a rv e f.
p a ra g ra e rv ic e m a n u a l
R A n u m b e r
C h e c k e d b y
W a s i t O
K N
O p a ir e d
Y /N
/N m a rk s
Y rs
S y m
ADMINISTRATION
▲ ▲ ▲ ▲ Filled in Turbine Log Book Service, Technician
Names
14.3 N/A
▲ ▲ ▲ ▲ Filled in Service Report Checklist complete 14.3 N/A
▲ ▲ ▲ ▲ Filled in MDRs - N/A
Filled in Modification
Checklists
- N/A
▲ ▲ ▲ ▲ All documents sent or filed - N/A
Title: Phase 2 - Service & Maintenance Check list Page 35 / 37
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
3 Maintenance Log cards
3.1 Pitch bearing wear limit log card
Pitch bearing Blade 1 - Max. Acceptable increase of bearing clearance1 2.34 mm
Measuring points
A B C D
First measurement (500 hrs service)
2nd measurement (5 years)
B – A < 2.6 mm
3rd measurement (10 years)
C – A < 2.6 mm
4th measurement (15 years)
D – A < 2.6 mm
Date
Wind speed (m/s)
Pitch bearing Blade 2 - Max. Acceptable increase of bearing clearance1 2.34 mm
Measuring points
A B C D
First measurement (500 hrs service)
2nd measurement (5 years)
B – A < 2.6 mm
3rd measurement (10 years)
C – A < 2.6 mm
4th measurement (15 years)
D – A < 2.6 mm
Date
Wind speed (m/s)
Pitch bearing Blade 3 - Max. Acceptable increase of bearing clearance1 2.34 mm
Measuring points
A B C D
First measurement (500 hrs service)
2nd measurement (5 years)
B – A < 2.6 mm
3rd measurement (10 years)
C – A < 2.6 mm
4th measurement (15 years)
D – A < 2.6 mm
Date
Wind speed (m/s)
1 Maximum acceptable bearing clearance is based on the IMO 12-501300/4-08525 bearing
Title: Phase 2 - Service & Maintenance Check list Page 36 / 37
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
3.2 Blade angle log card
Blade First measurement
(with 500 hours service)
2nd measurement
(5 years)
3rd measurement
(10 years)
4th measurement
(15 years)
3.3 Yaw gear teeth log card
Forward This log card to Quality after each maintenance:
Description Unit Pinion 1 Pinion 2 Pinion 3
Backlash [mm]
Parallelism Side A Contact percentage [%]
Parallelism Side B Contact percentage [%]
Yaw Motors Manufacturer
Readjusted backlash Y/N
Yaw Pucks working with wind >7m/s?
Y/N – Wind speed [m/s]:
3.4 Yaw bearing wear limit log card
Yaw bearing - Max. Acceptable increase of bearing clearance 1.2 mm
Measuring points
A B C D
First measurement
(500 hrs service)
2nd measurement
(5 years)
B – A < 1.2 mm
3rd measurement
(10 years)
C – A < 1.2 mm
4th measurement
(15 years)
D – A < 1.2 mm
Date
Wind speed (m/s)
Title: Phase 2 - Service & Maintenance Check list Page 37 / 37
© Copyright Emergya Wind Technologies B.V., The Netherlands. Reproduction and/or disclosure to third parties of this document or any part thereof, or use of any information contained therein for purposes other than provided for by this document, is not permitted, except with the prior and express permission of Emergya Wind Technologies BV, The
3.5 Generator air gap log card
Air gap dimensions in [mm] at vertical position: 5.55±0.45mm
3 o’clock 6 o’clock 9 o’clock 12 o’clock
Front Back Front Back Front Back Front Back
Date
Wind speed (m/s)
| 1 Maintenance information sheet |
| 2 Maintenance Checklist |
| 3 Maintenance Log cards |
| 3.1 Pitch bearing wear limit log card |
| 3.2 Blade angle log card |
| 3.3 Yaw gear teeth log card |
| 3.4 Yaw bearing wear limit log card |
| 3.5 Generator air gap log card |
File details come from the government source that posted it. Updated .