Exhibit U_SF1413-23 (2).pdf

PDF 711 KB Posted

Attached to
Fermilab-Construction Services for IERC CCD Space Humidificaion-372698
Solicitation number
372698_DG
Issued by

About this file

This document is a Standard Form 1413 (Statement And Acknowledgment), dated 12/2/2025, for a subcontract between Fermi Forward Discovery Group, LLC (prime contractor) for construction services at Fermilab in Batavia, IL. The specific subcontract involves Construction Services for IERC CCD Space Humidification, with the prime contract number 89243024CSC00002. The form documents the acknowledgment of various labor standards clauses, including Contract Work Hours and Safety Standards Act, Payrolls and Basic Records, and Construction Wage Rate Requirements. The document is signed by Dasia Guthrie, Subcontract Administrator, and is valid through the OMB control number 9000-0066 expiration date of 5/31/2025.

View the file

Other files

File Type Posted
Amendment 03 to RFP 372698.pdf PDF
Amendment 02 to RFP 372698.pdf PDF
Amendment 01 to RFP 372698.pdf PDF
Exhibit A_ Statetment of Work.pdf PDF
Exhibit R_Performance Bond FL-40.pdf PDF
Exhibit P_Bid Bond FL-41.pdf PDF
Exhibit K_SECTION 220719 - PLUMBING PIPING INSULATION.pdf PDF
Exhibit O_2025 Construction Insurance Requirements.pdf PDF
Exhibit Q_ Payment BondFL-42.pdf PDF
Exhibit X_Wage Determination DBA IL08 _Dated 09_26_2025 Mod 13.pdf PDF
Exhibit Y_ Sample Firm Fixed Subcontract.pdf PDF
Exhibit C_SECTION 010010 - GENERAL REQUIREMENTS.pdf PDF
Exhibit D_SECTION 013100 - ESH REQUIREMENTS.pdf PDF
Exhibit G_SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING.pdf PDF
Exhibit J_SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT.pdf PDF
Exhibit M_SECTION 221316 - SANITARY WASTE AND VENT PIPING.pdf PDF
Exhibit V_PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
Exhibit W_SARC_Subcontractor Annual RepsCerts Rev 6.pdf PDF
Exhibit Z Site-Map.pdf PDF
1.0 Request for Proposal_ISD_372698_DG_.pdf PDF
Exhibit B_2-6-8 Floor Plans.pdf PDF
Exhibit E_SECTION 013300 - SUBMITTALS.pdf PDF
Exhibit F_014100 Quality Requirements.pdf PDF
Exhibit H_SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING.pdf PDF
Exhibit I_SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT.pdf PDF
Exhibit L_SECTION 221116 - DOMESTIC WATER PIPING.pdf PDF
Exhibit N_FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit S_ Price Proposal Form.pdf PDF
Exhibit T_Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

Part I - Statement Of Prime Contractor

1. Prime Contract Number 2. Date Subcontract

Awarded

3. Subcontract Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor 5. Subcontractor

a. Name a. Name

b. Street Address b. Street Address

c. City d. State e. ZIP Code c. City d. State e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project 9. Location

10a. Name Of Person Signing 11. By (Signature) 12. Date Signed

10b. Title Of Person Signing

Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800

F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing

15a. Name Of Person Signing 16. By (Signature) 17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any

A C

DB

STANDARD FORM 1413 (REV. 10/2023) BACK

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2025 Part I - Statement Of Prime Contractor

1. Prime Contract Number

2. Date Subcontract Awarded

3. Subcontract Number Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor

5. Subcontractor

a. Name

a. Name

b. Street Address

b. Street Address

c. City

d. State

e. ZIP Code

c. City

d. State

e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project

9. Location 10a. Name Of Person Signing

11. By (Signature)

12. Date Signed 10b. Title Of Person Signing Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing 15a. Name Of Person Signing

16. By (Signature)

17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any A C D B

STANDARD FORM 1413 (REV. 10/2023) BACK

1. Enter the Prime Contract Number. : 89243024CSC000002
4a. Enter the Prime Contractor's Name. : Fermi Forward Discovery Group, LLC
4b. Enter the Prime Contractor's Street Address. : Kirk Road and Wilson Street
4c. Enter the Prime Contractor's City.: Batavia
7a. Enter the Name of the Awarding Firm.:
10a. Enter the Name of the Person signing this form as the Prime Contractor. : Dasia Guthrie
10b. Enter the Title of the Person signing this form as the Prime Contractor. : Subcontract Administrator
8. Enter the Project name.: Construction Services for IERC CCD Space Humidification
9. Enter the Location. : Fermilab, Batavia, IL
7b. Enter a Description of Work completed by the Subcontractor. : Construction Services for IERC CCD Space Humidification
5c. Enter the Subcontractor's City.:
4e. Enter the Prime Contractor's Zone Improvement Plan (ZIP) Code. : 60510
5e. Enter the Subcontractor's Zone Improvement Plan (ZIP) Code. :
4d. Enter the Prime Contractor's State.: IL
5d. Enter the Subcontractor's State.:
3. Enter the Subcontract Number. :
5a. Enter the Subcontractor's Name.:
5b. Enter the Subcontractor's Street Address.:
2. Enter the Date the Subcontract was Awarded (enter 2 digit month, 2 digit day and 4 digit year).:
12. If you are the Prime Contractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).: 2025-12-02
6. Click here to select, "the prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 1
6. Click here to select, "the prime contract does NOT contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
16. Sign here if you are the Subcontractor.:
15b. Enter the Title of the Person Signing this form as the Subcontractor. :
15a. Enter the Name of the Person Signing this form as the Subcontractor. :
17. If you are the Subcontractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).:
14a. Enter the First Name of an Intermediate Subcontractor, If Any. :
14c. Enter the Third Name of an Intermediate Subcontractor, If Any.:
14d. Enter the Fourth Name of an Intermediate Subcontractor, If Any.:
14b. Enter the Second Name of an Intermediate Subcontractor, If Any.:

File details come from the government source that posted it. Updated .