Fermilab-Construction Services for IERC CCD Space Humidificaion-372698

Closed Solicitation Posted

Solicitation number
372698_DG
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Illinois 60510, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Energy's Fermi National Accelerator Laboratory seeks construction services for the installation of two humidification units in the Integrated Engineering and Research Center (IERC) CCD laboratory space. This solicitation (RFP 372698_DG) requires a subcontractor to furnish all labor, materials, tools, equipment, transportation, overhead, bonding costs, safety oversight, and quality control necessary to complete the humidification system installation. Key contract requirements include strict adherence to technical specifications and drawings, compliance with comprehensive Environment, Safety, and Health (ES&H) requirements mandated by the Department of Energy, installation of associated plumbing and electrical systems, and achievement of specific project milestones within a 96-calendar-day completion schedule. The procurement will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach, with offerors required to demonstrate 10 years of similar project experience and specific expertise in plumbing and electrical equipment installation. The original proposal deadline of January 7, 2026, has been extended multiple times; the current due date is February 9, 2026, at 5:00 PM Central Time, with a pre-proposal meeting held on December 18, 2025.

This is not a small business set-aside, though the NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) carries a small business size standard of $19.0 million. No current incumbent or contractor is identified in the solicitation documents. The specific contract award value is not disclosed in the available materials, though the subcontract structure indicates firm-fixed-price terms with monthly progress payments including 10% retainage. The project spans 96 calendar days from the Notice to Proceed, with critical milestones including product submittals and shop drawings review by day 21, construction completion by day 66, punch-list resolution by day 86, and final project closeout by day 96. The work will be performed at the Fermi National Accelerator Laboratory located in Batavia, Illinois 60510, specifically within the Integrated Engineering and Research Center Building in DuPage County.

Notice text

The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications.

Files

File Type Posted
Amendment 03 to RFP 372698.pdf PDF
Amendment 02 to RFP 372698.pdf PDF
Amendment 01 to RFP 372698.pdf PDF
Exhibit K_SECTION 220719 - PLUMBING PIPING INSULATION.pdf PDF
Exhibit O_2025 Construction Insurance Requirements.pdf PDF
Exhibit Q_ Payment BondFL-42.pdf PDF
Exhibit X_Wage Determination DBA IL08 _Dated 09_26_2025 Mod 13.pdf PDF
Exhibit Y_ Sample Firm Fixed Subcontract.pdf PDF
1.0 Request for Proposal_ISD_372698_DG_.pdf PDF
Exhibit B_2-6-8 Floor Plans.pdf PDF
Exhibit E_SECTION 013300 - SUBMITTALS.pdf PDF
Exhibit F_014100 Quality Requirements.pdf PDF
Exhibit H_SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING.pdf PDF
Exhibit I_SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT.pdf PDF
Exhibit L_SECTION 221116 - DOMESTIC WATER PIPING.pdf PDF
Exhibit N_FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit S_ Price Proposal Form.pdf PDF
Exhibit T_Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit A_ Statetment of Work.pdf PDF
Exhibit R_Performance Bond FL-40.pdf PDF
Exhibit P_Bid Bond FL-41.pdf PDF
Exhibit U_SF1413-23 (2).pdf PDF
Exhibit C_SECTION 010010 - GENERAL REQUIREMENTS.pdf PDF
Exhibit D_SECTION 013100 - ESH REQUIREMENTS.pdf PDF
Exhibit G_SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING.pdf PDF
Exhibit J_SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT.pdf PDF
Exhibit M_SECTION 221316 - SANITARY WASTE AND VENT PIPING.pdf PDF
Exhibit V_PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
Exhibit W_SARC_Subcontractor Annual RepsCerts Rev 6.pdf PDF
Exhibit Z Site-Map.pdf PDF
Show all 30

Similar open opportunities

Opportunity Agency Set-aside Responses due
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB Batavia, Illinois 60510, United States · NAICS 236210 Fermi National Accelerator Laboratory No set-aside
PIP-II f-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade Illinois 60510, United States · NAICS 236220 Fermi National Accelerator Laboratory Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity