Exhibit L - Deliverables.pdf
PDF 226 KB Posted
- Attached to
- Take Charge Texas Support Services
- Solicitation number
- HHS0014612v2
- Issued by
- Texas
About this file
This is an Exhibit L Deliverables document prepared by the Texas Department of State Health Services (DSHS) for RFO No. HHS0014612v2 related to Take Charge Texas (TCT) Support Services. The deliverables outline a comprehensive set of project management, transition, and operational requirements for the selected contractor. Key deliverables include a Project Kickoff Presentation due within ten business days of contract effectiveness; a Project Plan encompassing transition activities, project schedules, configuration management, support and maintenance procedures, and status reporting due within seven business days; weekly written status reports detailing work progress, issues, and quality metrics; monthly consolidated status reports including service metrics, maintenance scheduling projections covering ninety business days, and ticket reports; a Readiness Assessment Plan and Results Report to confirm user onboarding and operational readiness; a Turnover Plan due within 180 calendar days addressing transition activities, staffing, roles, data management, risk mitigation, and communication protocols; and a System Security Plan submitted within twenty-one calendar days documenting security controls protecting system confidentiality, integrity, and availability. The contractor must maintain current project schedules using Microsoft Project with weekly updates showing sprint completion percentages, variances, and critical path information, with all documentation stored in SharePoint.
The deliverables establish specific quality assurance standards for user acceptance testing, categorizing results as Green (less than 15 percent failed scenarios), Yellow (15 to 25 percent failed scenarios), or Red (exceeding 25 percent failed scenarios or critical issues). The Support and Maintenance Plan must address service request management, production support procedures, outage handling, incident root cause analysis, software updates, and system monitoring processes integrated with existing DSHS standards. Status reports must commence seven business days following contract effectiveness and continue weekly during both the transition phase and operations phase, with monthly consolidated reports due on or before the tenth calendar day of each month. The Turnover Plan requires annual updates on or before January 1st, and the System Security Plan, designated as a living document, must be updated no less than annually as part of the contractor's risk assessment process.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit L – Deliverables
HHS RFO No. HHS0014612v2
EXHIBIT L
DELIVERABLES
RFO No. HHS0014612v2
Exhibit L RFO No. HHS0014612v2 Page 2 of 11
DSHS will process payment for each Deliverable upon written acceptance by DSHS. DSHS will review and provide the Contractor with DSHS’ written notice of acceptance of the Contractor’s
Services, performance and Deliverables as being in compliance with the standards of performance, key performance measures and all other requirements of this Contract.
Del # Deliverable Name Deliverable Description Deliverable Due
Date
DEL-01 Project Kickoff
Presentation
A presentation, coordinated and facilitated by the Contractor, to familiarize Project team members with the Project. The presentation must include the following topics:
a. Project Schedule (high level);
b. objectives and definitions;
c. process;
d. artifacts;
e. roles and responsibilities;
f. keys to success;
g. next steps;
h. questions and answers
(Q&A); and
i. resources (including an updated organizational chart).
On or before ten (10)
Business Days after the Contract Effective
Date.
DEL-02 Project Plan The Project Plan must include:
a. Transition Plan;
b. Project Schedule;
c. Configuration Management;
d. Support and Maintenance
Plan;
e. Weekly Written Status
Reports;
f. Monthly Consolidated
Status Reports; and
On or before seven
(7) Business Days following the
Contract Effective
Exhibit L RFO No. HHS0014612v2 Page 3 of 11
Del # Deliverable Name Deliverable Description Deliverable Due
Date
g. Disaster Recovery Testing
Procedures.
The Project Plan will be updated as required by DSHS and provided to
DSHS to ensure the Project is completed successfully and on time.
DEL-02a Transition Plan The Transition Plan outlines the activities necessary for a seamless transition of services (when
Contractor takes over services from the incumbent service provider) to occur between the Contract
Effective Date and the commencement of Phase II -
Operations. The plan will include:
a. A timeline for the transition to be reviewed and approved by DSHS staff how the
Contractor will transition knowledge from the incumbent service provider to Contractor personnel to fully support the requirements of the
Contract;
b. Establishment of the
Contractor's project management office;
c. On-boarding of the project personnel;
d. On-boarding and/or transfer of technical resources; and
e. Completing the knowledge transfer from the incumbent service provider; and perform all transition activities.
See DEL-02 (Project
Plan).
Exhibit L RFO No. HHS0014612v2 Page 4 of 11
Deliverable Due
Date
DEL-02b Project Schedule The Contractor will provide and keep current a Project Schedule using Microsoft Project (MS
Project) that includes all agile
Project Sprints and Jira Software
Sprint tasks (including references to required plans and documents), activities performed by DSHS and the Contractor, the critical path, dependencies, Work Product, and results.
The Project Schedule will be updated and provided to DSHS
Program Manager (PM) weekly showing JIRA Sprint and task percent completion, variances, changes in scheduled tasks, and any other Project Schedule related changes.
Initial Project
Schedule is due with the Project Plan
(DEL-02).
Updated weekly, thereafter.
DEL-02c Configuration
Management
The Configuration Management document will provide analytics, management techniques, and supporting tools for managing
Project standards, controls and documentation for all Project Sprint
Products for which the Contractor will be responsible. The Contractor must document and report on SRs in Jira to:
a. Ensure Work Products conform to requirements;
b. Ensure changes are properly evaluated, authorized, and implemented;
Exhibit L RFO No. HHS0014612v2 Page 5 of 11
Deliverable Due
Date
c. Ensure all information, data, and necessary documents are kept current, and in a shared location (i.e., SharePoint); and
d. Ensure that prior to each
Sprint’s user acceptance testing (UAT) phase, the
Contractor’s quality assurance (QA) resources, and the program will baseline the test scenarios that will be executed during the UAT phase.
When reporting UAT results categorize them based on the criteria below for quality health of delivery:
• Green: Less than fifteen
(15%) failed test scenarios;
• Yellow: Failed scenarios between fifteen (15%) and twenty-five (25%); and
• Red: More than twenty-five
(25%) failed test scenarios or any critical issue reported.
DEL-02d Support and
Maintenance Plan
The Support and Maintenance Plan must outline the Contractor’s strategies and procedures for maintaining and supporting TCT as well as ensure reliability, security and optimal performance of TCT.
At a minimum, the maintenance
Exhibit L RFO No. HHS0014612v2 Page 6 of 11
Deliverable Due
Date and support plan must include the
Contractor’s approach to:
a. Management of maintenance service request
(SR), production support requests (PSR), information requests and outage requests;
b. Integration of current DSHS processes and standards;
c. Processes for providing maintenance SR support for
DSHS TCT;
d. PSR work processes;
e. Work processes associated with TCT outage requests;
f. Work processes related to incident root cause analysis;
and
g. Software updates and patches; and System monitoring.
DEL-02e Weekly Written
Status Reports
The Contractor must provide the
Weekly Written Status Reports, in a format approved by the DSHS program manager, which at a minimum will include the progress of Deliverables and resolutions to any issues identified by the
Contractor and DSHS staff.
The Weekly Written Status Reports will report progress against the
Project Schedule and must include:
During the Transition
Phase and continued in Operations these reports are due weekly, beginning the first (1st) full week of the
Transition Phase.
Commences seven
(7) Business Days following the
Contract Effective
Exhibit L RFO No. HHS0014612v2 Page 7 of 11
Deliverable Due
Date
a. Contractor’s completed SRs;
b. Contractor’s SRs in progress;
c. Contractor’s work to be initiated during the next week;
d. Assessment of progress against, each SR and the percent completed with details of any slipping tasks;
and
e. Issues requiring DSHS attention which include:
1. Problems that may delay completion of scheduled
Deliverables;
2. Failure or inadequacy of the Contractor in the performance of a contracted Service;
3. Failure or delay of
Contractor or DSHS to perform a SR task;
4. Open issues;
5. Age of open project issues;
6. Number of Defects;
7. High priority risks with mitigation plan;
8. Quality measures
(success criteria achieved compared to success criteria planned);
9. Implementation and technical performance criteria;
Exhibit L RFO No. HHS0014612v2 Page 8 of 11
Deliverable Due
Date
10. Failure, delay or inadequacy of the
Contractor to DSHS in the performance of the respective obligations that may delay completion of scheduled
Deliverables;
11. Proposed corrective actions(s) for each issue reported; and
12. Other information requested by DSHS.
DEL-02f Monthly
Consolidated Status
Reports
The report must provide Monthly
Consolidated Status Reports that must include:
a. service metrics report that indicates whether or not the target metrics for each priority level has been met;
b. SR ticket report that:
1. Identifies relevant details for every SR entered and worked during the previous month, grouped by SR type.
2. Provides HHS IT the ability to view tickets and generate ad hoc reports.
c. Maintenance and enhancement scheduling report that includes a 90-
Business Day projection of planned scheduled maintenance and enhancement work.
During the Transition
Phase and continued in Operations these reports are due on or before the tenth
(10th) Calendar Day of each month.
Exhibit L RFO No. HHS0014612v2 Page 9 of 11
Deliverable Due
Date
DEL-03 Readiness
Assessment Plan
The Contractor must provide a
Readiness Assessment Plan that:
a. Describes how the results of the readiness assessment will be collected and presented to
DSHS to include recommended approaches to resolve any identified problems;
b. Ensures the Contractor’s ability to support incident management;
c. Assesses each user’s ability to deliver services, in terms of users’ ability to successfully log in and use TCT; and
d. Describes the readiness of business procedures, reporting, and secure data export.
On or before seven
(7) Business Days following the
Contract Effective
Date.
DEL-04 Readiness
Assessment Results
Report
The Contractor must provide a
Readiness Assessment Results
Report which confirms:
a. All users have been identified, on-boarded, trained, and registered (logins created);
and
b. Receipt of DSHS written approval of Contractor’s transition and readiness for full operations.
At least two (2) weeks prior to
Operations as specified by DSHS.
DEL-05 Turnover Plan The Turnover Plan shall be a comprehensive document detailing the proposed schedule, activities, and resource requirements
On or before the one-hundredth and eightieth (180th)
Calendar Day
Exhibit L RFO No. HHS0014612v2 Page 10 of 11
Deliverable Due
Date associated with turnover tasks. The
Turnover Plan must include:
a. A schedule for turnover activities, with timelines and milestones specified for key tasks;
b. A staffing plan to support turnover tasks, including knowledge transfer activities;
c. A description of the roles and responsibilities of
Contractor personnel, including subcontractors, during the Turnover Phase;
d. The method for identifying all data, assets, and intellectual property to be turned over;
e. A risk register for the turnover activities that identifies potential risks, prioritizes the risks based on probability and impact, and establishes appropriate risk mitigation strategies;
f. A communication plan to facilitate interaction between Contractor and the incoming service provider or DSHS during the turnover activities; and
g. Any assumptions and dependencies.
The Turnover Plan must be approved, in writing, by DSHS.
following the
Contract Effective
Date.
Updated annually on or before January 1st.
DEL-06 System Security
Plan (SSP)
Develop, execute, maintain and deliver for DSHS approval, a
The initial SSP must be submitted for
Exhibit L RFO No. HHS0014612v2 Page 11 of 11
Deliverable Due
Date
System Security Plan (SSP) to document the current level of security controls within the
Contractor’s solution that protects the confidentiality, integrity and availability (CIA) of the solution and its information. Specific SSP security control requirements are located in Exhibit I, HHS
Information Security and Privacy
Requirements, and further guidance located on the HHS
Vendor Resources site located at:
https://www.hhs.texas.gov/business
/contracting-hhs/vendor-resources.
DSHS approval on or before twenty-one
(21) Calendar Days following the
Contract Effective
Date. The SSP is a living document and will be updated no less than annually as part of the
Contractor’s risk assessment.
https://www.hhs.texas.gov/business/contracting-hhs/vendor-resources https://www.hhs.texas.gov/business/contracting-hhs/vendor-resources