This exhibit outlines quality control, safety, and technical data requirements for solicitation N40027-23-R-0010 from the Department of the Navy Naval Sea Systems Command for work on the barge YFNX-20 at the NPTU shipyard in Charleston. The contractor must submit welding and non-destructive testing procedures for approval, maintain lists of qualified personnel, and provide reports and scheduling data as required by the work items. The contractor will also furnish provisioning documentation and logistics data for government furnished and contractor furnished equipment, as well as new technical manuals for any commercial or government equipment installed.

View the file

Other files

File Type Posted
CONFORMED RFP N4002723R00100005.pdf PDF
AMENDMENT 0005 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100004.pdf PDF
YFNX-20 Errata 6.pdf PDF
AMENDMENT 0004 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100003.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV 2.pdf PDF
YFNX-20 Errata 5.pdf PDF
YFNX-20 Errata 4.pdf PDF
AMENDMENT 0003 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 ERRATA Three.pdf PDF
YFNX-20 ERRATA Two.pdf PDF
J-2 Execution Milestone and Key Event Dates REV1.pdf PDF
CONFORMED RFP N4002723R00100002.pdf PDF
AMENDMENT 0002 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 Addendum One.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV1.pdf PDF
YFNX-20 ERRATA One.pdf PDF
J-1 Specification Package SSP SERM 024-24 REV1.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24 Rev 1.xlsx XLSX spreadsheet
N4002723R00100001.pdf PDF
N4002723R00100001 CONFORMED.pdf PDF
N4002723R0010 RFP.pdf PDF
J-4 Small Business Subcontracting Plan.doc DOC document
S-1 Request for Specification Clarification.doc DOC document
J-1 Specification Package SSP SERM 024-24.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24.xlsx XLSX spreadsheet
J-3 ERL SERM_024-24 YFNX 20.xls.pdf PDF
J-2 Execution Milestone and Key Event Dates.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSP:

CONTRACT DATA REQUIREMENTS LIST

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract / PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

D. SYSTEM / ITEM

E. CONTRACT / PR NO. F. CONTRACTOR

A

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

A0001

A0002

2. Title of Data Item

2. Title of Data Item

SI 009-04: QUALITY SYSTEM

SI 009-07: FIRE PREVENTION / HOUSEKEEPING

3. Subtitle

3. Subtitle

5. Contract Reference Section C

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

6. Requiring Office SUPSHIP Code

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Contractor's Written Quality System

In accordance with Section C of the solicitation and Gas Free Procedure

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

15. TOTAL

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-2, JUN 90

1059/183 S/N 0102-LF-010-5600

Previous editions are obsolete PAGE 1 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes

Yes

As Required

As Required

As Required

As Required

End of Task Order

End of Task Order

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

A0003

A0004

2. Title of Data Item

2. Title of Data Item

009-09: PROCESS CONTROL PROCEDURE

SI 009-12: WELDING, FABRICATION AND INSPECTION REQUIREMENTS

3. Subtitle

3. Subtitle

5. Contract Reference Section C

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

6. Requiring Office SUPSHIP Code

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Description of Process Control Procedure

In accordance with Section C of the solicitation and Qualify and submit welding/brazing/NDT procedures which have not been previously approved. Previously approved procedures may be submitted by number only.

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

15. TOTAL

15. TOTAL

Previous editions are obsolete PAGE 2 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes

Yes

As Required

As Required

As Required

As Required

End of Task Order

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

A0005

A0006

2. Title of Data Item

2. Title of Data Item

SI 009-12: WELDING, FABRICATION AND INSPECTION REQUIREMENTS

SI-009-20: GOVERNMENT PROPERTY

3. Subtitle

3. Subtitle

5. Contract Reference Section C

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

6. Requiring Office SUPSHIP Code

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Maintain list of qualified welders, brazers and non-destructive test personnel

In accordance with Section C of the solicitation and Description of property control system

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

15. TOTAL

15. TOTAL

Previous editions are obsolete PAGE 3 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes

Yes

As Required

As Required

As Required

As Required

End of Task Order

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

A0007

A0008

2. Title of Data Item

2. Title of Data Item

SI 009-39: TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) for

NEW TECHNICAL MANUALS FOR COMMERCIAL EQUIPMENT /

COMPONENT

SI 009-41: TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) for a TOPICALLY STRUCTURED TECHNICAL MANUAL

3. Subtitle

3. Subtitle

5. Contract Reference Section C

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

6. Requiring Office SUPSHIP Code

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Provide new Technical Manuals for commercial equipment when specified by the work item. The number of copies (*) as specified by the Standard Item.

In accordance with Section C of the solicitation and Provide new topically structured Technical Manuals when specified by the work item. The number of copies (*) as specified by the Standard Item.

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

15. TOTAL

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-2, JUN 90

1059/183 S/N 0102-LF-010-5600

Previous editions are obsolete PAGE 4 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes

Yes

As Required

As Required

As Required

As Required

End of Task Order

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

A0009

2. Title of Data Item

2. Title of Data Item

3. Subtitle

3. Subtitle

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

5. Contract Reference 6. Requiring Office Section C SUPSHIP Code

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Provide completed reports and scheduling data specified by the work item.

I.

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

1 4 1

15. TOTAL

15. TOTAL

1 4 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-2, JUN 90

1059/183 S/N 0102-LF-010-5600

Previous editions are obsolete PAGE 5 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes As Required As Required

End of Task Order

SI 009-08: SHIPBOARD FIRE PROTECTION AND FIRE PREVENTION;

Accomplish

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing

B

Form Approved OBM No. 0704-0188

1. Data Item

1. Data Item

B0001

B0002

2. Title of Data Item

2. Title of Data Item

SI 009-19: PROVISIONING TECHNICAL DOCUMENTATION

SI 009-21: LOGISTICS AND TECHNICAL DATA

3. Subtitle

3. Subtitle

5. Contract Reference Section C

5. Contract Reference Section C

6. Requiring Office SUPSHIP Code

6. Requiring Office SUPSHIP Code

200 and 500

4. Authority (Date Acquisition Document No)

4. Authority (Date Acquisition Document No)

9. Dist Statement Required

9. Dist Statement Required

8. APP Code

8. APP Code

10. Freq.

10. Freq.

11. As Of Date

11. As Of Date

12. Date of 1st Submission

12. Date of 1st Submission

13. Date of Sub. Submission

13. Date of Sub. Submission

14. Distribution

14. Distribution

a. Addressee

a. Addressee

b. Copies

b. Copies

Final

Final

Draft

Draft

Reg

Reg

Rep

Rep

16. Remarks

16. Remarks

In accordance with Section C of the solicitation and Provide provisioning technical documentation for contractor furnished hull, machinery and electrical components or equipment required to accomplish work in these items.

In accordance with Section C of the solicitation and Provide logistic and technical data for all GFM and CFM equipment or components installed or permanently removed. Provide weight and moment changes resulting from work accomplished.

7. DD250 Req.

7. DD250 Req.

Supervisor

Supervisor

15. TOTAL

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-2, JUN 90

1059/183 S/N 0102-LF-010-5600

Previous editions are obsolete PAGE 6 OF

(2 Data Items)

TDP: TM: OTHER: X

SHIP REPAIR (HM&E)

Yes As Required As Required

PM NAME (LAST, FIRST): Ralph L Lofton, PM
USS SHIP (FFG-XX): YFNX-20
SERM-XXX-XX: 024-24
Date: 8/21/23
TYPE OF AVAIL (I:
E:
RAV/TAV, PMA): NPTU Charleston

Text4: SI 009-60: SCHEDULE ASSOCIATED REPORTS FOR AVAILABILITIES OVER 9 WEEKS IN DURATION; PROVIDE AND MANAGE