This document is an errata notice updating the specification for a federal contract to replace insulation and ceiling tiles aboard the Moored Training Ship YFNX-20. The notice revises the scope of work to remove and dispose of existing ceiling tiles and insulation from the second deck and main deck, totaling 1,900 and 2,000 square feet respectively. New insulation totaling 1,825 and 2,000 square feet must be installed in the same areas in accordance with the references provided. Additional requirements specify relocating lights, fixtures, and equipment as necessary before installing new ceiling tiles totaling the same amounts. An operational test of all relocated equipment must be conducted upon completion. No government furnished materials are provided.

The related federal contract opportunity is solicitation number N40027-23-R-0010 issued by the Naval Sea Systems Command to replace insulation and ceiling tiles aboard the barge YFNX-20 at the Naval Surface Warfare Center. Offerors are required to meet the revised specifications outlined in the errata notice in response to this solicitation.

View the file

Other files

File Type Posted
CONFORMED RFP N4002723R00100005.pdf PDF
AMENDMENT 0005 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100004.pdf PDF
YFNX-20 Errata 6.pdf PDF
AMENDMENT 0004 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100003.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV 2.pdf PDF
YFNX-20 Errata 5.pdf PDF
YFNX-20 Errata 4.pdf PDF
AMENDMENT 0003 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 ERRATA Three.pdf PDF
J-2 Execution Milestone and Key Event Dates REV1.pdf PDF
CONFORMED RFP N4002723R00100002.pdf PDF
AMENDMENT 0002 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 Addendum One.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV1.pdf PDF
YFNX-20 ERRATA One.pdf PDF
J-1 Specification Package SSP SERM 024-24 REV1.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24 Rev 1.xlsx XLSX spreadsheet
N4002723R00100001.pdf PDF
N4002723R00100001 CONFORMED.pdf PDF
N4002723R0010 RFP.pdf PDF
J-4 Small Business Subcontracting Plan.doc DOC document
S-1 Request for Specification Clarification.doc DOC document
Exhibit A CDRL DD 1423-2 NPTU YFNX-20 SSP_024-24.pdf PDF
J-1 Specification Package SSP SERM 024-24.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24.xlsx XLSX spreadsheet
J-3 ERL SERM_024-24 YFNX 20.xls.pdf PDF
J-2 Execution Milestone and Key Event Dates.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: YFNX-20 (RMC 22747)

SERM-024-24

ERRATA NUMBER:

SPECIFICATION NUMBER:

THE FOLLOWING ITEMS ARE REPLACED:

635-11-001

DATED: 9/21/2023 12:27:12PMPage 1 of 1

SHIP: YFNX-20 (RMC 22747) ITEM NO: 635-11-001 (E2)

COAR: 28 PCN: SERM-L008

SWT FILE NO: 635-083 CMP: NONE

REVISED: 02 OCT 2022 PLANNER: KRIMMER, DAVID

BRIDGER, WRAY

CORNWELL, RICHARD

SSP: SERM-024-24 1 of 2 ITEM NO: 635-11-001

ERRATA NO. 2

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Insulation and Ceiling Tile Replacement; accomplish

1.2 Location of Work:

1.2.1 Second Deck (01 Level)

1.2.2 Main Deck

1.3 Identification:

1.3.1 Quantity (1,900 SF), Ceiling Tile System, For the Location Listed in 1.2.1

1.3.2 Quantity (2,000 SF), Ceiling Tile System, For the Location Listed in 1.2.2

1.3.3 Quantity (1,825 SF), Thermal Overhead Insulation, MIL-I-742, For the Location Listed in 1.2.1

(E2)

1.3.4 Quantity (2,000 SF), Thermal Overhead Insulation, MIL-I-742, For the Location Listed in 1.2.2

(E2)

2. REFERENCES:

2.1 Standard Items

2.2 4-P-8826, Comet III 25'-7"x80'-10 1/8"x25'-0 3/4" 2 Story Building for YFNX-20 Barge at CSNY, 5C (Sheet 2)

2.3 551-5911033 Rev A, Moored Training Ship YFNX 20 Deckhouse Modifications

2.4 302-7029582 Rev B, YFNX-20 Power Distribution and Lighting

3. REQUIREMENTS:

3.1 Remove and dispose of existing ceiling tile system, insulation and lagging from each overhead of each location listed in 1.2, as designated by the SUPERVISOR.

3.2 Accomplish the requirements of 009-11 of 2.1 for installation of new insulation and lagging in the overhead of each location listed in 1.2, in accordance with 2.2.

3.2.1 Accomplish the requirements of 009-12 of 2.1 for each new stud to support insulation and lagging.

3.2.2 Accomplish the requirements of 009-32 of 2.1 for each surface to be insulated with the exception of non-ferrous and corrosion resistant steel (CRES) piping, plating, and vent ducting.

3.2.3 Accomplish the requirements of 009-32 of 2.1 for new

insulation, lagging, and each reusable cover to match each surrounding area.

SHIP: YFNX-20 (RMC 22747)

SSP: SERM-024-24 2 of 2 ITEM NO: 635-11-001

ERRATA NO. 2

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3 Install new each ceiling tile system listed in 1.3 and located in 1.2, using 2.2 through 2.4 for guidance.

3.3.1 Relocate each light, fixture, equipment, pipe, cable, and wire in way of new installation. New installation must be template to suit each existing shipboard condition and offset around each interference not feasible to relocate.

3.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2,3, Columns A, C, and D, Lines One through 7.

(E2)

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of each equipment relocated, using

2.2 through 2.4 for guidance. Verify proper operation.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.