J-1 Specification Package SSP SERM 024-24.pdf

PDF 1 MB Posted

Attached to
U. S. NAVY BARGE YFNX-20 NPTU SOLICITATION
Solicitation number
N40027-23-R-0010
Issued by

About this file

This solicitation seeks proposals for repairs and upgrades to the U.S. Navy barge YFNX-20. Work includes structural repairs to the hull, decking, and overhead areas as well as system upgrades and replacements. Mechanical work comprises cleaning and repairs to voids, piping repairs and replacements for sanitary and bilge systems, and HVAC replacements. Electrical work includes cleaning and repairs to distribution panels, lighting replacements, and upgrades to fire detection and alarm systems. The solicitation requests pricing for base work and options, with proposals due by January 15, 2023 and work to be performed from March to August 2023. The Navy will award a fixed-price contract.

View the file

Other files

File Type Posted
CONFORMED RFP N4002723R00100005.pdf PDF
AMENDMENT 0005 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100004.pdf PDF
YFNX-20 Errata 6.pdf PDF
AMENDMENT 0004 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100003.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV 2.pdf PDF
YFNX-20 Errata 5.pdf PDF
YFNX-20 Errata 4.pdf PDF
AMENDMENT 0003 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 ERRATA Three.pdf PDF
YFNX-20 ERRATA Two.pdf PDF
J-2 Execution Milestone and Key Event Dates REV1.pdf PDF
CONFORMED RFP N4002723R00100002.pdf PDF
AMENDMENT 0002 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 Addendum One.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV1.pdf PDF
YFNX-20 ERRATA One.pdf PDF
J-1 Specification Package SSP SERM 024-24 REV1.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24 Rev 1.xlsx XLSX spreadsheet
N4002723R00100001.pdf PDF
N4002723R00100001 CONFORMED.pdf PDF
N4002723R0010 RFP.pdf PDF
J-4 Small Business Subcontracting Plan.doc DOC document
S-1 Request for Specification Clarification.doc DOC document
Exhibit A CDRL DD 1423-2 NPTU YFNX-20 SSP_024-24.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24.xlsx XLSX spreadsheet
J-3 ERL SERM_024-24 YFNX 20.xls.pdf PDF
J-2 Execution Milestone and Key Event Dates.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SERMC (NMD)

YFNX-20 (RMC 22747)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SERM-024-24

SHIP CHARACTERISTICS

FEET INCHES 110 0LENGTH OVERALL

FEET INCHES 30 0MAX. BEAM AT DESIGN WATERLINE

FEET INCHESEXTREME BEAM INCLUDING APPENDAGES

FEET INCHES 2 0DRAFT (MAX. NAVIGABLE) (FWD.)

FEET INCHES 2 0DRAFT (MAX. NAVIGABLE) (AFT.)

LONG TON 0LIGHT DISPLACEMENT

0 LONG TONFULL LOAD DISPLACEMENT

INCHESFEET 25 0HEIGHT OF MAST ABOVE DESIGN WATERLINE

30 0

INCLUDES ALL CHANGES THROUGH 9/6/2023

INDEX

SHIP: YFNX-20 (RMC 22747) SERM-024-24

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-24 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 09/27/2022 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/27/2022 Original

009-03 Toxic and Hazardous Substance; control 09/27/2022 Original

009-04 Quality Management System; provide 09/27/2022 Original

009-05 Temporary Access; accomplish 09/27/2022 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

09/27/2022 Original

009-07 Confined Space Entry, and Certification; accomplish 09/27/2022 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/28/2023 CH-1

009-10 Asbestos-Containing Material (ACM); control 09/27/2022 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2022 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/27/2022 Original

009-20 Government Property; control 09/27/2022 Original

009-21 Logistics and Technical Data; provide 09/27/2022 Original

009-23 Interference; remove and install 09/29/2022 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/27/2022 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/27/2022 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

09/27/2022 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

09/27/2022 Original

009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 09/30/2022 Original

009-61 Shipboard Use of Fluorocarbons; control 09/27/2022 Original

009-67 Integrated Total Ship Testing; manage 09/27/2022 Original

009-69 Heavy Weather/Mooring Plan; provide 09/27/2022 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/27/2022 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/30/2022 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/30/2022 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/30/2022 Original

009-80 Ship Facilities; maintain 09/27/2022 Original

009-81 Compartment Closeout; accomplish 09/30/2022 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/27/2022 Original

009-84 Threaded Fastener Requirements; accomplish 09/30/2022 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

09/27/2022 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

09/27/2022 Original

009-99 Ship Departure Report; provide 09/27/2022 Original

Page 1 of 4 PLANNED WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-100 Ship's Stability; maintain 09/30/2022 Original

009-101 Ship Transit and Berthing; accomplish 09/27/2022 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/27/2022 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/27/2022 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/27/2022 Original

009-111 Schedule and Associated Reports for non-CNO Availabilities; provide and manage

09/30/2022 Original

009-117 Combat Systems, Light-Off Suport; provide 09/30/2022 Original

009-118 CG Deck Loading; accomplish 09/27/2022 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/30/2022 Original

009-122 Temporary Padeye; install and remove 09/30/2022 Original

009-125 Boats Less Than 65 Feet Long; accomplish 10/25/2022 Original

099-001SE General Criteria for Mayport Naval Station (NAVSTA) Availability; accomplish 01/02/2020 Original

099-051SE Non-Hazardous Liquid Waste Removal Operation at Naval Station Mayport;

accomplish

02/08/2022 Original

099-053SE Temporary Hazardous Material (HM)/Hazardous Waste (HW)/Satellite

Accumulation Point (SAP) Storage Units for Ship's Force Use; provide

01/02/2020 Original

099-055SE Cleaning and Pumping; accomplish (CMAV) 02/08/2022 Original

099-058SE Heavy Weather Plan for Naval Station Availabilities; provide 02/08/2022 Original

099-060SE General Environmental Requirements for Naval Station Mayport Availabilities;

accomplish

02/08/2022 Original

099-061SE Temporary Hazardous Material (HM)/Hazardous Waste (HW)/Satellite

Accumulation Point (SAP) Storage Units for Ship's Force Use at Contractor's

Facility; provide

01/02/2020 Original

099-074SE General Safety Requirements; accomplish 01/02/2020 Original

Page 2 of 4 PLANNED WORK

CATEGORY II. FY-24 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-09 Process Control Procedure (PCP); provide and accomplish

09/27/2022 Original

009-11 Insulation and Lagging; accomplish 09/27/2022 Original

009-12 Weld, Fabricate, and Inspect; accomplish 09/27/2022 Original

009-13 Meter, Gauge, Switch, and Thermometer; repair 09/27/2022 Original

009-25 Structural Boundary Test; accomplish 09/29/2022 Original

009-26 Deck Covering; accomplish 09/29/2022 Original

009-32 Cleaning and Painting Requirements; accomplish 09/29/2022 Original

009-37 General Procedure for Woodwork; accomplish 09/29/2022 Original

009-71 Piping System; test 09/27/2022 Original

009-78 Passive Countermeasures System (PCMS) Material;

repair

09/27/2022 Original

009-87 Chemical disinfection Procedures; accomplish 09/27/2022 Original

009-90 Technical Representative; provide 09/27/2022 Original

009-103 Weight and Moment Change Data; provide 09/30/2022 Original

009-114 Mold Remediation; accomplish 09/27/2022 Original

Page 3 of 4 PLANNED WORK

ITEM NO. TITLE

Administrative Purposes; accomplish000-00-001

Accountability of Manhour and Material Reservation; accomplish042-00-001

Underwater Hull, Freeboard and Voids; inspect and repair110-11-001

Tank and Void Cleaning and Pumping; accomplish123-00-001

Deck House Exterior Plating and Roof; repair150-11-001

Hatch; inspect and repair167-11-001

Electrical Power Distribution System Panel and Interior/Exterior Lighting

Fixture Clean, Inspect, Repair and Replacement; accomplish

324-10-001

Fire and Flooding Alarm and Warning System Assessment and Upgrade;

accomplish

436-11-001

Heating, Ventilation, Air Conditioning (HVAC) System Replacement;

accomplish

514-11-001

Sprinkling System; install (OPTION ITEM)522-10-001

Deck Mooring Fixture; inspect and repair582-11-001

Collection, Holding, and Transfer (CHT) System; repair593-11-001

Handrail and Lifeline; inspect and repair612-11-001

Brow Turntable; inspect and repair623-11-001

Deck House Floor Plating; repair and preserve634-11-001

Insulation and Ceiling Tile Replacement; accomplish635-11-001

Bath Room Facility; inspect and repair644-11-001

Deck House Roll Up Door; inspect and repair651-11-001

Temporary Service; provide992-11-001

Regional Maintenance Center (RMC) Office Space; provide992-11-002

Barge Towing Service; provide (OPTION ITEM)992-11-003

Barge Inland Waterway Tow; provide (OPTION ITEM)992-11-004

Drydocking and Undocking; accomplish997-11-001

Hazardous Waste Produced on Naval Vessel; control998-41-001

Page 4 of 4 PLANNED WORK

SHIP: YFNX-20 (RMC 22747) ITEM NO: 000-00-001

COAR: 28 PCN: SERV-L015

LWT FILE NO: 000-003 CMP: NONE

REVISED: 13 MAR 2023 PLANNER: BENNETT, KEITH

SSP: SERM-024-24 1 of 1 ITEM NO: 000-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Administrative Purposes; accomplish

1.2 Location of Work:

1.2.1 None.

1.3 Identification:

1.3.1 Not Applicable.

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Prepare and submit each report generated by the requirements of NAVSEA Standard Items and any other required documentation, that is not tied to a specific work item, to the SUPERVISOR.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 042-00-001

COAR: 28 PCN: SERV-L001

SWT FILE NO: 042-001 CMP: NONE

REVISED: 02 OCT 2022 PLANNER: BENNETT, KEITH

SSP: SERM-024-24 1 of 3 ITEM NO: 042-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Accountability of Manhour and Material Reservation;

accomplish

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Accomplish the following, in addition to each specific requirement of the Job Order, for each Work Item which identifies each reservation of manhour or material dollar.

3.2 Identify each task/discrepancy and initiate an estimate of each manhour and material dollar on Reservation Task Request/Control Form (Attachment A) for each discrepancy or task identified to be accomplished under a reservation item or reservation paragraph, entering the date and estimate of labor and material, and deliver the estimate to the

SUPERVISOR.

3.2.1 Each reservation tasking must not be used to accomplish work outside the scope of the specific Work Item identifying a reservation work paragraph.

3.3 Ensure the SUPERVISOR reviews the estimate submitted and if in agreement, must sign the "RMC/NSA Authorization Agreement to Quote" blank, authorizing the work at the manhour and material dollars quoted.

The contractor must then sign the "Contractor Obligation/Agreement to Quote" blank and enter the estimated start date. The RMC/NSA contracts representative must initial the form in the blank provided.

3.3.1 If there is a difference of opinion in the estimate provided by the contractor and RMC/NSA, each manhour and material dollar must be negotiated immediately to resolve the difference. Each negotiated manhour and material dollar must then be entered in the provided"Revised Estimate" blocks with each required signature as indicated in 3.3.

3.4 Ensure the control form has the work completion date, signed and dated by the contractor, and submit to the SUPERVISOR within 2 days after completion of the tasking authorized.

3.5 Submit one legible copy, in approved transferrable media, of a weekly report listing each Work Item with each manhour and material reservation paragraph identified to the SUPERVISOR.

SHIP: YFNX-20 (RMC 22747)

SSP: SERM-024-24 2 of 3 ITEM NO: 042-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.5.1 The report must contain the following: Work Item

number,reservation control form serial number, reservation paragraph number,total of each original manhour and material dollar allocated in each paragraph, manhour and material dollar negotiated for each authorized tasking, and remaining balance of each manhour and material dollar.

3.6 Submit one legible copy, in approved transferrable media, of a final report no later than 5 days after completion of the availability to the

SUPERVISOR.

3.6.1 The report must contain the same information specified in 3.5.1.

3.7 Ensure each reservation manhour and material dollar requirement listed in the individual Work Item is a part of this contract under the original solicitation and award. Therefore they are subject to each provision, term, condition and clause of this contract job order and the Master Ship Repair Agreement (MSRA)/The Agreement for Boat Repair(ABR).

3.7.1 The manhour reservation must include each effort for both prime contractor and sub contractor.

3.8 Verify the balance of each hour remaining in each reservation item after negotiation has concluded, and it is evident that no additional work will be tasked, is subject to a decrease change order.

3.9 Ensure only each actual production manhour expended will be considered towards the contractors obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproductive labor should be included in the pricing for reservation items in the original bid, they must not count towards satisfying the contractors obligation to provide each reserved manhour.

The production manhour reservation must not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item.

3.10 Ensure each material dollar is based on actual cost to the Contractor of acquiring material provided. Each material dollar may include freight or duty which would be reflected on the invoice for the material. The Contractor must not be allowed to add a material handling charge, overhead (including G and A), or profit into the actual cost of material expended toward the reservation.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SSP: SERM-024-24 3 of 3 ITEM NO: 042-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 110-11-001

COAR: 28 PCN: SERM-L001

HULL-L001

CSWT FILE NO: 110-004 (DDG 51) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: CORNWELL, RICHARD

BRIDGER, WRAY

SSP: SERM-024-24 1 of 3 ITEM NO: 110-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Underwater Hull, Freeboard and Voids; inspect and repair

1.2 Location of Work:

1.2.1 Underwater Hull, including Freeboard up to Main Deck, Frame 0- 50, Port and Starboard

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 S9086-DA-STM-010 Rev 3, Hull Structures

2.3 Hull Structures Rev 6, Waterborne Underwater Hull Cleaning of Navy Ships

2.4 T9074-AS-GIB-010/271 Rev 1, Requirements for Nondesructive Testing Methods

2.5 MIL-STD-2035A, Nondestructive Testing Acceptance Criteria

2.6 633-8337791 Rev A, Modification to Anodes

2.7 803-921865 Rev P, Cathodic Protection Hull Zinc Anodes

3. REQUIREMENTS:

3.1 Clean the underwater hull to prepare each surface for visual and ultrasonic inspection using 2.2 and 2.3 for guidance.

3.2 Accomplish a visual inspection of the Underwater Hull and interior of voids, including Freeboard up to Main Deck for structural integrity, deterioration, pitting, cracking, and each area of damaged or distortion in each location listed in 1.2, using 2.2 and 2.3 for guidance.

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.2 with sketches listing the type, amount and location of structural damage and deterioration to the SUPERVISOR

3.3 Accomplish an ultrasonic thickness survey of each underwater hull area, in accordance with 2.4, using 2.2 and 2.3 for guidance. The accept or reject criteria must be in accordance with 2.5.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.3.1.1 List in one column the design thickness of plate

SSP: SERM-024-24 2 of 3 ITEM NO: 110-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

inspected, using 2.5 for guidance.

3.3.1.2 List in another column, next to the design thickness, each actual thickness reading taken.

3.3.1.3 List specific location with respect to frame, strake, or measurement from each suitable reference point.

3.4 Accomplish the following repairs as determined by the visual inspection in 3.2 and ultrasonic result of 3.3 in the location listed 1.2, as designated by the SUPERVISOR, using 2.2 and 2.3 for guidance.

3.4.1 Vee-out and weld a total of 2 linear feet of splitting, cracking, deteriorated and damaged weld.

3.4.2 Accomplish base metal repair for a total of 144 square inches of deteriorated and damaged shell plating.

3.4.2.1 Each surface must be ground to sound metal prior to base metal repair.

3.4.2.2 Fill each local pit and groove with weld metal prior to the application of each principal build-up layer.

3.4.2.3 Each surface of completed base metal repair need not be ground smooth if not greater than 1/8 inch above plating surface.

3.4.3 Remove existing and install new a total of 2 square feet of deteriorated and damaged shell plating.

3.4.4 Remove existing and install new a total of 2 linear feet of adjacent support structure.

3.4.5 Remove existing and install new 20 EA Zinc mounting stud.

3.4.6 Chip and grind each surface flush in way of each repair.

3.4.7 Template exact size, configuration, and location from existing shipboard condition.

3.5 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.6 Accomplish the requirements of 009-25 of 2.1 for an air hose or water hose test of each new insert and weld seam. Allowable leakage:

None.

3.7 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 5, for each surface listed in 1.2.

3.8 Remove existing and install new a total of 60 EA exterior zinc anode, using 2.6 for guidance, as designated by the SUPERVISOR.

(I)(G) "TORQUE VERIFICATION"

3.8.1 Torque each zinc anode retaining nut to 35 to 40 foot-pounds in accordance with 2.7.

(V)(G) "RESISTANCE TEST"

3.8.2 Test each zinc anode to verify electrical resistance between anode and hull structure is less than 0.1 Ohm.

3.9 Accomplish the requirements of 009-32 of 2.1 for each new and

SSP: SERM-024-24 3 of 3 ITEM NO: 110-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 123-00-001

COAR: 28 PCN: SERV-L009

CSWT FILE NO: 123-133 (DDG 51) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: BENNETT, KEITH

BRIDGER, WRAY

SSP: SERM-024-24 1 of 2 ITEM NO: 123-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Tank and Void Cleaning and Pumping; accomplish

1.2 Location of Work:

1.2.1 Accessible Void No. One

1.2.2 Accessible Void No. 2

1.2.3 Accessible Void No. 3

1.2.4 Accessible Void No. 4

1.2.5 Accessible Void No. 5

1.2.6 Accessible Void No. 6

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 Unified Facilities Guide Specifications-33 01 50.55, Cleaning of Petroleum Storage Tanks

2.3 S9086-T8-STM-010/CH-593 Rev 7, Pollution Control

2.4 S9086-CM-STM-020/CH-078V2, Volume 2-Gaskets and Packing

2.5 S9086-CJ-STM-010/CH-075 Rev 7, Fasteners

3. REQUIREMENTS:

3.1 Open, ventilate, empty, clean, render dry, and maintain each dry storage void listed in 1.2 including each adjacent tank, space, or each piping system where the scope of repairs will result in a need for certification during the performance of this Job Order, in accordance with 2.2.

3.1.1 Clean each void free of debris, foreign matter, liquid, sludge and slime.

3.1.2 Ensure that each harmful vapor, fume, and mist is ventilated to the exterior of the vessel.

3.1.3 Ensure each void and adjacent space is certified and

maintained throughout the availability.

3.1.4 Submit one legible copy, in approved transferrable media, of a report listing the location, origin, and quantity of each manhole cover removed in 3.1 with respect to its void, ship's frame and distance off centerline to the SUPERVISOR.

3.2 Accomplish the following repairs for each void closure.

SSP: SERM-024-24 2 of 2 ITEM NO: 123-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.1 Weld fill, drill, and tap a total of 2 each stripped manhole cover bolting ring holes for each void.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.2.3 Accomplish the requirements of 009-32 of 2.1 for each surface in the vicinity of void closure, to include manhole cover, manhole ring, sealing area, coaming and each flanged area.

3.3 Inspect each void for cleanliness and completion of each repair prior to final closing. Allowable visible foreign material: None.

3.4 Install each manhole cover, new gasket and each associated part for each void listed in 1.2, and removed in 3.1, in accordance with Tables 078-8-1 and 078-8-2 of 2.4 and Figure 075-4-1 of 2.5.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 150-11-001

COAR: 28 PCN: SERM-L005

CSWT FILE NO: 150-009 (MCM 1) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: CORNWELL, RICHARD

BENNETT, KEITH

BRIDGER, WRAY

SSP: SERM-024-24 1 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Deck House Exterior Plating and Roof; repair

1.2 Location of Work:

1.2.1 Deck House Exterior and Roof Top

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 551-5911033 Rev A, Moored Training Ship YFNX 20 Deckhouse Modifications

2.3 10401 Rev A, Steel Beams Layout Over Barge Floor Deck (Base Beams) for YFNX 20 Barge at CSNY, SC.

2.4 10401, Structural Elevation and Joint View for YFNX 20 Barge at

CSNY, SC.

2.5 P8826, Comet III 25 FT-7 Inch X 80 FT-10 1/8 Inch X 25 FT-0-3/4 Inch 2 Story Building for YFNX 20 Barge at CSNY, SC.

3. REQUIREMENTS:

3.1 Accomplish a visual inspection of each roof panel, deckhouse siding, exterior door, structural member and each associated structural support for structural integrity, deterioration, pitting, cracking, and each area of damage or distortion in each location listed in 1.2.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Accomplish the requirements of 009-25 of 2.1 for a preliminary water hose test of each deckhouse exterior wall panel.

3.3 Accomplish the following repairs in the locations listed in 1.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR:

3.3.1 Remove existing and install new each roof panel.

3.3.1.1 Material must conform to Attachment A.

3.3.2 Remove existing and install new up to 30 EA deckhouse exterior wall panels, as designated by the SUPERVISOR.

3.3.2.1 Material must conform to Attachment B.

3.3.3 Template exact size, configuration, and location from existing condition.

SSP: SERM-024-24 2 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Columns A and C, Lines One through 7.

3.4 Accomplish the requirements of 009-25 of 2.1 for a water hose test of each new roof panel and deckhouse exterior wall panel. Allowable leakage: None.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 53, Columns A, B, E, and G, for the location listed in 1.2.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: SERM-024-24 3 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

A T T A C H M E N T “ A ”

ROOF:

HONEYCOMB ROOF 4" 4 PLY: WITH STEEL REINFORCING CHANNELS:

The roof shall be 4" thick composite sandwich panels. Both sides shall be stucco-embossed aluminum, re-painted white, with a core of 99# 3/411 cell, 11% phenolic-resin impregnated Kraft honeycomb. The top skin shall be bonded to a 1/8" tempered hardboard shock plate. Reinforced channels shall be laminated into the panel along both longitudinal edges.

The honeycomb core shall maintain properties as per Military Specifications ":Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (tlatwise) Shear strength (tlatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural roof panel that will not require support columns.

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fue) contributed Smoke developed

25 or less 15 or less 25 or less

SSP: SERM-024-24 4 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

A T T A C H M E N T “ A ”

ROOF:

HONEYCOMB ROOF 4" 4 PLY: WITH STEEL REINFORCING CHANNELS:

The roof shall be 4" thick composite sandwich panels. Both sides shall be stucco-embossed aluminum, re-painted white, with a core of 99# 3/411 cell, 11% phenolic-resin impregnated Kraft honeycomb. The top skin shall be bonded to a 1/8" tempered hardboard shock plate. Reinforced channels shall be laminated into the panel along both longitudinal edges.

The honeycomb core shall maintain properties as per Military Specifications ":Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (tlatwise) Shear strength (tlatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural roof panel that will not require support columns.

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fue) contributed Smoke developed

25 or less

SSP: SERM-024-24 5 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

SSP: SERM-024-24 6 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT “B”

EXTERIOR WALLS:

ALUMINUM EXTERIOR ALUMINUM INTERIOR (AB/BA)

The walls shall be 3" thick composite sandwich panels. The interior and exterior facings shall be .024 stucco-embossed aluminum, pre-painted white or beige, bonded to an 1/8" tempered hardboard shock plate. The core shall be of 99# 3/4" cell, 11% phenolic-resin impregnated Kraft honeycomb. Panel division/finish strips shall consist of color coordinated vinyl 11H" connectors that shall not protrude more than 1/16" beyond the :finished wall panel

The honeycomb core shall maintain properties as per Military Specifications "Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (flatwise) Shear strength (flatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800 PSI

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural panel that will not require support columns every 4'. ·

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fuel contributed Smoke developed

25 or less

SSP: SERM-024-24 7 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT “B”

EXTERIOR WALLS:

ALUMINUM EXTERIOR ALUMINUM INTERIOR (AB/BA)

The walls shall be 3" thick composite sandwich panels. The interior and exterior facings shall be .024 stucco-embossed aluminum, pre-painted white or beige, bonded to an 1/8" tempered hardboard shock plate. The core shall be of 99# 3/4" cell, 11% phenolic-resin impregnated Kraft honeycomb. Panel division/finish strips shall consist of color coordinated vinyl 11H" connectors that shall not protrude more than 1/16" beyond the :finished wall panel

The honeycomb core shall maintain properties as per Military Specifications "Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (flatwise) Shear strength (flatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800 PSI

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural panel that will not require support columns every 4'. ·

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fuel contributed Smoke developed

25 or less

SSP: SERM-024-24 8 of 8 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 167-11-001

COAR: 28 PCN: SERM-L013

CSWT FILE NO: 167-016 (DDG 51) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: CORNWELL, RICHARD

BRIDGER, WRAY

SSP: SERM-024-24 1 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hatch; inspect and repair

1.2 Location of Work:

1.2.1 Main Deck, Frame 3-5, Centerline

1.2.2 Main Deck, Frame 5-7, Centerline

1.2.3 Main Deck, Frame 9-11, Centerline

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures

2.3 605-2540769 Rev D, Label Plate Standards

3. REQUIREMENTS:

3.1 Remove, disassemble, clean, and inspect, each hatch, hatch panel, coaming, gasket channel, knife edge and operating mechanism, for wear and defect, using 2.2 for guidance. Retain each part for reassembly.

3.1.1 Remove existing gasket from each gasket retainer channel.

3.1.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of 3.2, and the description and quantity of each part requiring replacement as a result of 3.1 to the SUPERVISOR.

3.2 Accomplish the following repairs of each hatch and coaming assembly, in the locations listed in 1.2, using 2.2 for guidance, as designated by the SUPERVISOR.

3.2.1 Accomplish base metal repair for a total of 432 square inches of deteriorated hatch knife edge.

3.2.1.1 Each surface must be ground to sound metal prior to base metal repair.

3.2.1.2 Fill each local pit and groove with weld material prior to application of each principal build up layer.

3.2.1.3 Each surface of completed base metal repair need not be ground smooth if not greater than 1/8 inch above plating surface.

3.2.2 Remove existing and install new for a total of One square foot of deteriorated hatch panel.

3.2.3 Remove existing and install new for a total of 2 linear feet of deteriorated gasket retainer channel.

SSP: SERM-024-24 2 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.4 Chip and grind each surface flush in way of each removal.

3.2.5 Template exact size, configuration, and location from each existing onboard condition.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.4 Assemble, install, and align the hatch and coaming assembly removed in 3.2, in the location listed in 1.2, using each part retained in 3.2, using 2.2 for guidance.

3.4.1 Install new rubber silicone gasket conforming to ZZ-R-765, Grade 25, Class 2B.

3.4.2 Apply zinc dust-petrolatum antiseize compound conforming to commercial specification A-A-59313 to all fastener thread.

3.4.3 Lubricate each exposed working part, using general purpose grease conforming to MIL-DTL-23549.

3.4.4 Adjust each dog, hinge, and wedge for positive dogging action.

3.4.5 Accomplish adjustments and alignment to correct discrepancies resulting from 3.5.

3.5 Accomplish the requirements of 009-25 of 2.1 for a chalk test of the hatch and coaming assembly repaired in 3.3. Chalk imprint must be in the center three-fifths of the width of the gasket with 100 percent contact.

3.6 Accomplish the requirements of 009-25 of 2.1 for a air hose test of each hatch and coaming assembly in each location listed in 1.2. Allowable leakage: None.

(V)(G) "OPERATIONAL TEST"

3.7 Accomplish an operational test of the hatch. Test the hatch by raising and lowering 2 times. Allowable binding and sticking: None.

3.7.1 Accomplish each adjustment and alignment to correct each discrepancy resulting from 3.9, using 2.2 for guidance.

3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.9 Install new each label plate in accordance with 2.3.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: SERM-024-24 3 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 324-10-001

COAR: 28 PCN: SERM-L010

CSWT FILE NO: 324-002 (LCS 1) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: NEWSOME, TERRY

BRIDGER, WRAY

KRIMMER, DAVID

SSP: SERM-024-24 1 of 4 ITEM NO: 324-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Electrical Power Distribution System Panel and

Interior/Exterior Lighting Fixture Clean, Inspect, Repair and Replacement; accomplish

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Quantity (One EA), 480 VAC Power Distribution Panel 480-1

1.3.2 Quantity (2 EA), 120 VAC Power Distribution Panel No. 120-1 and 120-2

1.3.3 Quantity (One EA), 240 VAC Power Distribution Panel No. 120-3

1.3.4 Quantity (One EA), 240/120 VAC Power Distribution Panel No.

120-4

1.3.5 Quantity (One EA), 480 VAC Shore Power Connection Box and Splice Box

1.3.6 Quantity (3 EA), 480 VAC Shore Power Circuit Breakers

1.3.7 Quantity (One EA), 480/120 VAC, 75KVA, Transformer

1.3.8 Quantity (95 EA), Lighting, Fluorescent, Flush MTD, Type: F, 160 Watt, Item No. 9, as Shown on Sheet One of 2.4

1.3.9 Quantity (38 EA), Lighting, Fluorescent, Sym: 333.1, 60 Watt, Item No. 10, as Shown on Sheet One of 2.4

1.3.10 Quantity (16 EA), Lighting, Emergency, 110 VAC, Part No. ELU- 4-H7555, Item No. One, as Shown on Sheet One of 2.4

1.3.11 Quantity (8 EA), Floodlight, Model: TFS-705-120LP, Item No.

6, as Shown on Sheet One of 2.4

1.3.12 Quantity (38 EA), Lighting Fixture, Weatherdeck, Part No.

VXHB15GP, Item No. 13, as Shown on Sheet One of 2.4

2. REFERENCES:

2.1 Standard Items

2.2 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.3 S9086-KC-STM-010/CH-300 Rev 11, Electric Plant General

2.4 7029582 Rev B, YFNX Power Distribution and Lighting

2.5 MIL-STD-1310H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP) Mitigation, and Safety

SSP: SERM-024-24 2 of 4 ITEM NO: 324-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.6 605-2540769 Rev D, Label Plate Standards

3. REQUIREMENTS:

3.1 Ensure each source of power has been secured, tagged and tested prior to work on any Power Distribution Panel. Restore each source of power after completion of work, cleanup, tag clearing and installation of each removed switchboard protective cover.

3.2 Accomplish in-place cleaning and inspection of the equipment listed in 1.3.1 through 1.3.7, and located in 1.2, using 2.2 through 2.4 for guidance.

3.2.1 Verify each circuit label is correct to its corresponding designation on each panel label schedule.

3.2.2 Visually inspect each component prior to cleaning to detect evidence of casualties or deteriorating conditions that may not be apparent after cleaning.

3.2.3 Clean interior surfaces of each enclosure, including internal components and wiring, free of foreign matter, leaving no residue or injurious effects.

3.2.4 Accomplish a infrared and visual inspection of internal electrical components, panel and connection including but not limited to circuit breakers, closing and tripping coils, instrumentation, relays for low voltage, overcurrent and reverse power, governor/voltage regulator system, and transformers for current, power and instrumentation control to identify damaged or missing parts.

3.2.5 Inspect for indication of heat-stressed or discolored

insulation, including bus supports, cable sleeving or other insulation on relays, transformers and other coils.

3.2.6 Inspect each component for wear, defects, corrosion, deterioration and loose connections.

3.2.7 Inspect and test the 120 VAC, 240 VAC and 480 VAC electrical grounding system.

3.2.8 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.2.1 through 3.2.8, including recommendation for outdated electrical equipment upgrade or replacement to the SUPERVISOR.

3.2.9 Tighten each bolt, screw, and electrical connection hardware.

3.2.10 Bond and ground each equipment in accordance with 2.5.

3.3 Accomplish an assessment and operational test of each

interior/exterior, emergency and flood lighting listed in 1.3.8 through

1.3.12 and located in 1.2, using 2.2 through 2.4 for guidance.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3, including recommendation for repairing interior/exterior, emergency and flood lighting or replacement to the SUPERVISOR.

3.4 Accomplish the repair of each existing lighting fixture listed in

1.3.8 through 1.3.12, and located in 1.2, using 2.2 through 2.4 for

SSP: SERM-024-24 3 of 4 ITEM NO: 324-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

guidance, as designated by the SUPERVISOR.

3.5 Install new or missing each lighting fixture listed in 1.3.8 through 1.3.12, and located in 1.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR.

3.6 Remove two EA exterior lighting fixture, associated wiring, and 12 FT by 12 FT bolted security sign from aft HVAC platform, using 2.3 and

2.4 for guidance, as designated by the SUPERVISOR.

3.6.1 Remove each unused foundation, cable hanger, wireway, bracket, and stud.

3.6.2 Chip and grind each surface flush in way of removals.

3.7 Weatherproof and seal connectors exposed to the weather in accordance with 2.2.

3.8 Provide 5 mandays of labor and 1,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized manday and dollar amounts, remaining funds will be subject to recoupment. The contractor is not authorized to exceed these limits.

(V)(G) "CLEANLINESS INSPECTION"

3.9 Accomplish a visual inspection of each power distribution panel prior to clearing of tagout to ensure that no foreign material or debris remain in the unit after completion of work and cleaning.

(V)(G) "FUNCTIONAL TEST"

3.10 Accomplish a functional test of each power distribution panel and lighting fixture listed in 1.3, and located in 1.2, using 2.2 through 2.5 for guidance.

3.10.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.9 to the SUPERVISOR.

3.11 Fabricate and install each new label plate for each found missing or wrong designation, in accordance with 2.2 and 2.4, using 2.6 for guidance.

3.11.1 Install new label plate for each electrical outlet, indicating panel and circuit designation.

3.12 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

5.2 PUSH MATERIAL:

SSP: SERM-024-24 4 of 4 ITEM NO: 324-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 436-11-001

COAR: 28 PCN: SERM-L009

CSWT FILE NO: 436-007 (CG 47) CMP: NONE

REVISED: 25 SEP 2022 PLANNER: NEWSOME, TERRY

BRIDGER, WRAY

KRIMMER, DAVID

SSP: SERM-024-24 1 of 2 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Fire and Flooding Alarm and Warning System Assessment and Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Quantity (One EA), Control Panel, Honeywell Fire-Lite

1.3.2 Quantity (20 EA), Detector, Thermal Fire, Model DT-135CS

1.3.3 Quantity (6 EA), Liquid Level Switch, Type IC/R1-U

1.3.4 Quantity (4 EA), Horn, Model HDC-24

1.3.5 Quantity (4 EA), Bell, Model MBDC-6

1.3.6 Quantity (1,000 FT), Cable, Type: LSDCOP 1-1/2, Item No. 22, as Shown on Sheet One of 2.2, NSN: 6145-01-202-2776

2. REFERENCES:

2.1 Standard Items

2.2 7029583, Fire and Flooding Alarms

2.3 7029582 Rev B, YFNX-20, Power Distribution and Lighting

2.4 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.5 MIL-STD-1310H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP) Mitigation, and Safety

2.6 605-2540769 Rev D, Label Plate Standards

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1 for the services of an authorized original equipment manufacturer (OEM) service provider to remove, disassemble, inspect, repair, reassemble, test, adjust, and provide each special tool and drawing for each equipment listed in 1.3 and located in 1.2.

3.2 Remove existing and install new the equipment listed in 1.3, using

2.2 through 2.5 for guidance, as designated by the SUPERVISOR.

3.2.1 Install new an additional 2 EA Thermal Fire Detector, one EA Horn, and one EA Bell (for a total of 12 EA Thermal Fire Detector, 6 EA Horn, and 6 EA Bell) for each void.

3.2.2 Ensure each Liquid Level Switch is installed in accordance wiht General Note 10 of 2.2.

SSP: SERM-024-24 2 of 2 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.3 Remove existing and install new One EA smoke detector (for a total of 6 EA) for each void.

3.2.3.1 Ensure each smoke detector is powered (hardwired) from power distribution system.

3.2.4 Template exact size, configuration, and location from each existing shipboard condition.

3.2.5 Accomplish the requirements of 009-12 of 2.1,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .