This document is an amendment to a solicitation for barge maintenance and repair services. The Navy seeks preservation and replacement services for systems onboard the YFNX-20 NPTU barge, including underwater hull preservation, HVAC system replacement, and drydocking. The amendment provides clarification to work specifications, incorporates errata updates, and adjusts milestones and contract clauses. Offerors must submit pricing in accordance with instructions by November 27, 2023 to be eligible for work including towing and maintenance from November 2023 to April 2024 at the Naval Station in Mayport, Florida or other potential contractor locations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4002724PRYFNX20
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NPTU BARGE YNFX-20 SSP SERM 024-24 RFP N4002723R0010
AMENDMENT 0004.
SEE SECTION SF30-BLOCK 14 CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Oct-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4002723R0010
X 9B. DATED (SEE ITEM 11)
06-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Oct-2023
CODE
COMMANDER SOUTHEAST REGIONAL MAINTENANCE
P.O. BOX 280057
MAYPORT NAVAL STATION
JACKSONVILLE FL 32228-0057
N40027 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4002723R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to:
- clarify specifications;
- incorporate ERRATA Six;
- and update Sections F, I and J.
QUESTION 014 Work Item 623-11-001 Upon review of specification and references and conducting ship check on 09/12/2023 contractor has the need for some clarification.
With the exception of the 5 linear feet of handrail (3.2.2), contractor was unable to identify lines 3.2.1.1 through
3.2.6 during ship check or in the references.
Would the government please re-asses and correct if needed?
Reference 2.2 GN #7 states to “Fabricate a rolling stairway …. Per section view “2-A” of reference 1. If contractor is accomplish this step such reference would be required. Also this reference would be required to accomplish Detail “3” of reference 2.2 unless a length is provided by the government.
Would the government please review this GN along with detail “3” of reference 2.2 and if applicable please provide reference 645-5910938 “Personnel/ Service brow with rolling stairway”?
ANSWER 014 Work Item 623-11-001 No, GN#7 referenced in contractor’s question is located in reference 2.3 vice 2.2. Reference 2.3 is listed for guidance. Reference 2.3 GN#7 “Fabricate a rolling stairway…” is not a requirement of work item. These changes are incorporated under ERRATA Three.
QUESTION 020 Work Item 436-11-001 Multiple sources state that the equipment stated in paragraph 1.3 is obsolete and cannot be quoted. Can the government modify the spec to include equipment that is available?
ANSWER 020 Work Item 436-11-001 Yes, paragraph 1.3 is modified to read “or equivalent” and these changes are incorporated under ERRATA Five.
QUESTION 021 Work Item 110-11-001 Work Item 110-11-001 calls for preservation of the Underwater Hull, including Freeboard up to Main Deck, Frame 0-50, Port and Starboard. Per the docking plan there are only 13 frames. Can you verify the portion of the Underwater Hull and Freeboard that are to be preserved?
ANSWER 021 Work Item 110-11-001 Yes, added paragraph 3.8 to accomplish the requirements of 009-32 of 2.1, including Table 2, Lines One, 1A, 2, 3 or 4, Columns A, B and G for each surface listed in paragraph 1.2. These changes are incorporated under ERRATA Five.
QUESTION 022 Work Item 631-11-001
Upon review of the work package contractor identified that IAW attachment B of 150-11-001 for panel replacement, it states that: “The interior and exterior facings shall be .024 “stucco-embossed aluminum”. This are very thin surfaces.
Specification paragraph 3.1 calls out for: “009-32 of 2.1, including Table 3, Lines 25, 26, or 27, Columns A, B, and D,” This section of the 009-32 Table #3 is for steel surfaces in interior spaces.
It is the contractor believe that a more subtle Table/ line, like Table #3 Line 31 be appropriate for the type of surfaces been dealt with.
Would the government please review and provide clarification if needed?
ANSWER 022 Work Item 631-11-001 Yes, paragraph 3.1 was changed to read Table 3, Line 31 and these changes are incorporated under ERRATA Five.
QUESTION 024 Work Item 110-11-001 Upon review of the specification contractor noted that there is only one requirement for the surface preparation of the locations listed in 1.2 Table one, Line 5, is for the underwater hull up to the boot top line. There is no requirement listed for the freeboard.
Would the government please review and provide which table and line is to be followed for the freeboard preparation/ painting?
ANSWER 024 Work Item 110-11-001 See Answer 019 under Amendment 0003.
QUESTION 026 Work Item 436-11-001 Paragraph 3.1 directs the Contractor to “accomplish the requirements of 009-90 of 2.1 for the services of an authorized original equipment manufacturer (OEM) service provider to remove, disassemble, inspect, repair, reassemble, test, adjust, and provide each special tool and drawing for each equipment listed in 1.3 and located in 1.2.”
Paragraph 3.2 directs the Contractor to “remove existing and install new the equipment listed in 1.3...”
OEM has identified that “DT-135CS is obsolete and no longer available.”
Will the government provide known source, provide as GFM, or allow for alternative equivalents?
ANSWER 026 Work Item 436-11-001 Yes, paragraph 1.3 is modified to read “or equivalent” and these changes are incorporated under ERRATA Five.
QUESTION 028 Work Item 992-11-004 Will Navy self-insure the vessel for the tow?
ANSWER 028 Work Item 992-11-004 Yes, tow insurance is not required.
QUESTION 032 Solicitation The solicitation excludes the pools/front loads for Cat I and II NAVSEA standard Items 009-03 para 3.3.1, 009-10 3.2.1.1, and 009-32 para 3.1.2.1.
The information available in the solicitation and the references for the vessel do not provide sufficient data to determine what costs to include for removal of hazardous materials.
Does the YFNX-20 NPTU barge contain asbestos and lead based or other heavy metal paint? If so, please identify locations and projected quantities.
If the Government is unsure if hazardous materials are installed, or of the quantities and locations are unknown, request the government invoke the pools/front loads for Cat I and II NAVSEA standard Items 009-03 para 3.3.1, 009-10 3.2.1.1, and 009-32 para 3.1.2.
ANSWER 032 Solicitation Presence of asbestos and lead based or other heavy metal paint is unknown. Paragraph 3.1.1 of NSI 009-03 (initial determination) is required.
No, the government will not invoke pools/front loads, Use Attachment A (009-03) under Repair and Berthing Barge (YRB, YRBM) for man-days/material costs.
QUESTION 033 Work Item 436-11-001 Paragraph 3.1 requires the services of an OEM service provider. Contractor has exhausted all our known sources for this type of work, receiving no positive response for service of this system.
Can Govt provide a POC for a vendor to accomplish this work and/or meet 009-90 OEM service provider requirements?
ANSWER 033 Work Item 436-11-001 Yes. The known Original Equipment Manufacturer (OEM) is listed below and this change is incorporated under ERRATA Six:
Siemens Building Technology Stephen (Matt) Moore Senior Sales Executive, Fire Safety and Security 6737 W. Washington Street Suite 3125 West Allis, WI 53214 Mobile: (414)514-9129 Email: moore@siemens.com
QUESTION 034 Solicitation The Solicitation lists two Option Items for towing and states ""the Contracting Officer may exercise, if at all, any of the Option Items"".
The solicitation also listed the award dates for the two towing Option 992-11-033 and 992-11-004 items as A+3. If A represents Availability start, that will not provide sufficient time to arrange for the tow by the milestone date.
1. Please confirm that the Contracting Officer will award one of the two towing Option Items.
2. Please confirm that each contractor is only to price the Option item for towing that is applicable to the location of the contractor's facility - either 992-11-003 in Charleston area for a local tow or 992-11-004 at a facility that will require an inland tow.
3. Please confirm that the applicable towing Option item will be awarded upon award of the contract in order to support the towing milestone date.
4. Please define ""A"" in regards to the Option item award dates.
ANSWER 034 Solicitation The option exercise dates for Work Items 992-11-003 and 992-11-004 was changed to no later than A-19.
Offerors shall submit their proposals in accordance with the preparation instructions under Section L Instructions to Offerors, paragraph 10, VOLUME I: Price Proposal and S-2.
QUESTION 036 Solicitation This Bid Question is a follow-up to the government answers to BQ 017, 025, and 030 of Amendment 003, which requested a vender source for the panels meeting the requirements of attachment A and B. KCON Construction declined to Bid the work item. A request for a quote to Endure Products Inc, Miami was requested on 9/27/2023, and to date, they have not responded. In addition to requesting a quote via EMAIL, an attempt to call Endure Products Inc using the number on the web page was also to no avail.
Since the alternative panels (BQ 030) are not desired and contractor has exhausted all efforts to locate the panels meeting the requirements of Attachment A and B, Can the Government provide the panels as GFM of provide a POC and phone number of the known source?
ANSWER 036 Solicitation Yes, a known source is Panel Built Inc., 866.977.3584, www.panelbuilt.com. This change is incorporated under ERRATA Six.
SECTION F - DELIVERIES OR PERFORMANCE
The following have been modified:
MILESTONES
KEY EVENT/MILESTONE WORKSHEET
EVENT
START DATE
COMPLETE DATE
Start of Availability 27 November 2023
Tow prep/Tow (Key Event) 28 November 2023 7 December 2023
Docking 8 December 2023
20% Open/Inspect Complete (All) 29 December 2023
25% Conference 5 January 2024
50% Conference 16 February 2024
Fleeting 18 March 2024
75% Conference 22 March 2024
Undocking 22 March 2024
Work Complete 19 April 2024
Tow to NPTU (Key Event) 19 April 2024 25 April 2024
Complete Availability 26 April 2024
CONTROLLING WORK ITEMS
WORK ITEM
NUMBER
WORK ITEM TITLE
110-11-001 Underwater Hull Survey; accomplish
514-11-001 Heating, Ventilation, Air Conditioning (HVAC) System Replacement; accomplish
997-11-001 Dry-docking and Undocking; accomplish
SECTION I - CONTRACT CLAUSES
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
(a) By written notice to the Contractor, the Contracting Officer may exercise, if at all, any of the Option Items identified in Section B and require the Contractor to provide, within the performance period specified in Section F, the work described in Section C for such Option(s) Item(s) at the estimated cost and base fee set forth in Section B.
The option(s) may be exercised after the Contractor’s receipt of the Specification Work Package prepared by the Planning Supervisor in accordance with the procedures stated in Section C, but in any event, the Option(s) shall be exercised, if at all, on or before the following dates:
WORK
ITEM
SHORT TITLE EXERCISE
NLT
522-10-001 Sprinkling System; install (OPTION ITEM) A+3
631-11-001 Deck House Interior Bulkhead; preserve (OPTION
ITEM)
A+3
992-11-003 Barge Towing Service; provide (OPTION ITEM) A-19 992-11-004 Barge Inland Waterway Tow; provide (OPTION ITEM) A-19
(b) Contract Data Requirements List, DD 1423, Exhibits A, B and C shall be applicable to any exercised optional items identified under Section B.
(End of Clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
EXHIBIT AND ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:
Attachment S-1 Request for Specification Clarification, 1page
Attachment S-2 Cost Data Break Down, Rev 1 (1 page)
The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:
Attachment J-1 Specification Package SSP SERM-024-24 REV 1 (80 pages) , ERRATA One (19 pages), ERRATA Two (3 pages), ERRATA Three (3 pages), ERRATA Four (5 pages), ERRATA Five (14 pages), ERRATA Six (14 pages), Addendum One (2 pages)
Attachment J-2 Execution Milestones and Key Event Dates REV 1 (1 page)
Attachment J-3 Event Readiness List Rev 2 (1 page)
Attachment J-4 Small Business Subcontracting Plan (Large Business Only), 2 pages