YFNX-20 ERRATA Three.pdf
PDF 70 KB Posted
- Attached to
- U. S. NAVY BARGE YFNX-20 NPTU SOLICITATION
- Solicitation number
- N40027-23-R-0010
About this file
This document contains an errata notice updating the specification for a federal contract to repair the brow turntable on the U.S. Navy barge YFNX-20. The errata replaces several items in the specification, requiring the removal and replacement of components like chain staples, toggle pins, ladder steps, and turnbuckle assemblies. The repairs must be accomplished in accordance with the references provided and overseen by the contracting supervisor. Inspections are also required of the brow turntable and platform for structural integrity and damage before accomplishment of the repairs. The related federal contract opportunity is solicitation number N40027-23-R-0010 from the Department of the Navy Naval Sea Systems Command to provide unspecified services for the U.S. Navy barge YFNX-20 Naval Pier Transit Unit.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: YFNX-20 (RMC 22747)
SERM-024-24
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
623-11-001
DATED: 9/22/2023 10:57:36AMPage 1 of 1
SHIP: YFNX-20 (RMC 22747) ITEM NO: 623-11-001 (E3)
COAR: 28 PCN: SERM-L014
CSWT FILE NO: 623-010 (CG 47) CMP: NONE
REVISED: 25 SEP 2022 PLANNER: CORNWELL, RICHARD
BENNETT, KEITH
BRIDGER, WRAY
SSP: SERM-024-24 1 of 2 ITEM NO: 623-11-001
ERRATA NO. 3
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Brow Turntable; inspect and repair
1.2 Location of Work:
1.2.1 Main Deck, Frame 6-8, Starboard, Weather
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 804-2255404 Rev D, Accommodation Ladder Upper Rotating Platform Types A, B, and C
2.3 645-5911037 Rev A, Moored Training Ship YFNX 20 Brow Landing Installation
3. REQUIREMENTS:
3.1 Accomplish a visual inspection of the brow turntable, platform assembly for structural integrity, deterioration, pitting, cracking, and each area of damage or distortion.
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
3.2 Accomplish the following repairs to in the location listed in 1.2, using 2.2 and 2.3 for guidance, as designated by the SUPERVISOR:
3.2.1 Remove existing and install new brow turntable and associated support structure.
3.2.1.1 Remove DELETEDexisting and install new 8 EA chain
staple.
(E3)
3.2.1.2 Remove DELETEDexisting and install new 4 EA toggle pin with lanyard.
(E3)
3.2.2 Remove existing and install new a total of 5 linear feet of handrail and 5 linear feet of safety chain.
3.2.3 Remove DELETEDexisting and install new 2 EA ladder step, to include each bushing and fastener.
(E3)
3.2.4 Remove DELETEDexisting and install new 4 EA damaged J hook, padeye, and each associated support bracket.
(E3)
3.2.5 Remove DELETEDexisting and install new each bushing, fastener, CRES quick release pin, toggle pin, and CRES lanyard.
(E3)
SHIP: YFNX-20 (RMC 22747)
SSP: SERM-024-24 2 of 2 ITEM NO: 623-11-001
ERRATA NO. 3
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.6 Disassemble,DELETED clean, inspect, reassemble, and lubricate 2 EA turn buckle assembly.
(E3)
3.2.7 Template exact size, configuration, and location from existing onboard conditions.
3.3 Accomplish each requirement of 009-12 of 2.1, including Table 3, Columns A and C, Lines One through 7.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.