This document contains a federal contract specification update and opportunity. The specification update is for repair and replacement of deck house exterior plating and roofing on barge YFNX-20, including removal and installation of new honeycomb composite roof and wall panels conforming to military specifications for strength, flame resistance, and water intrusion testing. The update also requires assessment and upgrade of the barge's fire and flooding alarm and warning system, including removal and installation of a new control panel, thermal detectors, liquid level switches, horns, bells, and cable. The contractor must utilize an authorized OEM service provider, template locations from existing conditions, bond and ground equipment, and accomplish operational testing.

The related federal contract opportunity is solicitation number N40027-23-R-0010 issued by the Naval Sea Systems Command Department of the Navy to accomplish the work specified on barge YFNX-20 at the Naval Postgraduate Training Unit.

View the file

Other files

File Type Posted
CONFORMED RFP N4002723R00100005.pdf PDF
AMENDMENT 0005 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100004.pdf PDF
AMENDMENT 0004 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
CONFORMED RFP N4002723R00100003.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV 2.pdf PDF
YFNX-20 Errata 5.pdf PDF
YFNX-20 Errata 4.pdf PDF
AMENDMENT 0003 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 ERRATA Three.pdf PDF
YFNX-20 ERRATA Two.pdf PDF
J-2 Execution Milestone and Key Event Dates REV1.pdf PDF
CONFORMED RFP N4002723R00100002.pdf PDF
AMENDMENT 0002 RFP N4002723R0010 USN BARGE NPTU SERM-024-24.pdf PDF
YFNX-20 Addendum One.pdf PDF
J-3 ERL SERM_024-24 YFNX 20 REV1.pdf PDF
YFNX-20 ERRATA One.pdf PDF
J-1 Specification Package SSP SERM 024-24 REV1.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24 Rev 1.xlsx XLSX spreadsheet
N4002723R00100001.pdf PDF
N4002723R00100001 CONFORMED.pdf PDF
N4002723R0010 RFP.pdf PDF
J-4 Small Business Subcontracting Plan.doc DOC document
S-1 Request for Specification Clarification.doc DOC document
Exhibit A CDRL DD 1423-2 NPTU YFNX-20 SSP_024-24.pdf PDF
J-1 Specification Package SSP SERM 024-24.pdf PDF
S-2 Cost Data Break Down YFNX-20 SERM-024-24.xlsx XLSX spreadsheet
J-3 ERL SERM_024-24 YFNX 20.xls.pdf PDF
J-2 Execution Milestone and Key Event Dates.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: YFNX-20 (RMC 22747)

SERM-024-24

ERRATA NUMBER:

SPECIFICATION NUMBER:

THE FOLLOWING ITEMS ARE REPLACED:

150-11-001

436-11-001

DATED: 10/4/2023 5:16:20PMPage 1 of 1

SHIP: YFNX-20 (RMC 22747) ITEM NO: 150-11-001 (E6)

COAR: 28 PCN: SERM-L005

CSWT FILE NO: 150-009 (MCM 1) CMP: NONE

REVISED: 02 OCT 2022 PLANNER: CORNWELL, RICHARD

BENNETT, KEITH

BRIDGER, WRAY

SSP: SERM-024-24 1 of 10 ITEM NO: 150-11-001

ERRATA NO. 6

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Deck House Exterior Plating and Roof; repair

1.2 Location of Work:

1.2.1 Deck House Exterior and Roof Top

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 551-5911033 Rev A, Moored Training Ship YFNX 20 Deckhouse Modifications

2.3 10401 Rev A, Steel Beams Layout Over Barge Floor Deck (Base Beams) for YFNX 20 Barge at CSNY, SC.

2.4 10401, Structural Elevation and Joint View for YFNX 20 Barge at

CSNY, SC.

2.5 P8826, Comet III 25 FT-7 Inch X 80 FT-10 1/8 Inch X 25 FT-0-3/4 Inch 2 Story Building for YFNX 20 Barge at CSNY, SC.

3. REQUIREMENTS:

3.1 Accomplish a visual inspection of each roof panel, deckhouse siding, exterior door, structural member and each associated structural support for structural integrity, deterioration, pitting, cracking, and each area of damage or distortion in each location listed in 1.2.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Accomplish the requirements of 009-25 of 2.1 for a preliminary water hose test of each deckhouse exterior wall panel.

3.3 Accomplish the following repairs in the locations listed in 1.2, using 2.2 through 2.5 for guidance, as designated by the SUPERVISOR:

3.3.1 Remove existing and install new each roof panel.

3.3.1.1 Material must conform to Attachment A.

3.3.2 Remove existing and install new up to 30 EA deckhouse exterior wall panels, as designated by the SUPERVISOR.

3.3.2.1 Material must conform to Attachment B.

3.3.3 Template exact size, configuration, and location from existing

SSP: SERM-024-24 2 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

condition.

3.3.4 Accomplish the requirements of 009-12 of 2.1, including Table 3, Columns A and C, Lines One through 7.

3.4 Accomplish the requirements of 009-25 of 2.1 for a water hose test of each new roof panel and deckhouse exterior wall panel. Allowable leakage: None.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 53, Columns A, B, E, and G, for the location listed in 1.2.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.Known source for Bulkhead and Roof Panels:

Panel Built Inc.

Phone (800) 636-3873

(E6)

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SSP: SERM-024-24 3 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

A T T A C H M E N T “ A ”

ROOF:

HONEYCOMB ROOF 4" 4 PLY: WITH STEEL REINFORCING CHANNELS:

The roof shall be 4" thick composite sandwich panels. Both sides shall be stucco-embossed aluminum, re-painted white, with a core of 99# 3/411 cell, 11% phenolic-resin impregnated Kraft honeycomb. The top skin shall be bonded to a 1/8" tempered hardboard shock plate. Reinforced channels shall be laminated into the panel along both longitudinal edges.

The honeycomb core shall maintain properties as per Military Specifications ":Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (tlatwise) Shear strength (tlatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural roof panel that will not require support columns.

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fue) contributed Smoke developed

25 or less 15 or less 25 or less

SSP: SERM-024-24 4 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

SSP: SERM-024-24 5 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

A T T A C H M E N T “ A ”

ROOF:

HONEYCOMB ROOF 4" 4 PLY: WITH STEEL REINFORCING CHANNELS:

The roof shall be 4" thick composite sandwich panels. Both sides shall be stucco-embossed aluminum, re-painted white, with a core of 99# 3/411 cell, 11% phenolic-resin impregnated Kraft honeycomb. The top skin shall be bonded to a 1/8" tempered hardboard shock plate. Reinforced channels shall be laminated into the panel along both longitudinal edges.

The honeycomb core shall maintain properties as per Military Specifications ":Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (tlatwise) Shear strength (tlatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural roof panel that will not require support columns.

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fue) contributed Smoke developed

25 or less

SSP: SERM-024-24 6 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

SSP: SERM-024-24 7 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT “B”

EXTERIOR WALLS:

ALUMINUM EXTERIOR ALUMINUM INTERIOR (AB/BA)

The walls shall be 3" thick composite sandwich panels. The interior and exterior facings shall be .024 stucco-embossed aluminum, pre-painted white or beige, bonded to an 1/8" tempered hardboard shock plate. The core shall be of 99# 3/4" cell, 11% phenolic-resin impregnated Kraft honeycomb. Panel division/finish strips shall consist of color coordinated vinyl 11H" connectors that shall not protrude more than 1/16" beyond the :finished wall panel

The honeycomb core shall maintain properties as per Military Specifications "Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (flatwise) Shear strength (flatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800 PSI

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural panel that will not require support columns every 4'. ·

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fuel contributed Smoke developed

25 or less

SSP: SERM-024-24 8 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

SSP: SERM-024-24 9 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT “B”

EXTERIOR WALLS:

ALUMINUM EXTERIOR ALUMINUM INTERIOR (AB/BA)

The walls shall be 3" thick composite sandwich panels. The interior and exterior facings shall be .024 stucco-embossed aluminum, pre-painted white or beige, bonded to an 1/8" tempered hardboard shock plate. The core shall be of 99# 3/4" cell, 11% phenolic-resin impregnated Kraft honeycomb. Panel division/finish strips shall consist of color coordinated vinyl 11H" connectors that shall not protrude more than 1/16" beyond the :finished wall panel

The honeycomb core shall maintain properties as per Military Specifications "Mil-B-28658D". Core shall have the following mechanical properties;

Dry compressive strength (flatwise) Shear strength (flatwise) Shear Modulus (flatwise)

90PSI

27PSI

1,800 PSI

The wet strength shall be not less than 60% of the dry strength after being tested per paragraph 4.5.1.3 of Mil-B-28658D.

The entire panel shall be laminated together using a neoprene adhesive and a combination of heat and pressure. The panels shall have formed edge connectors that are capable of being friction locked without mechanical fasteners using a full length joint without through metal connectors. Joint shall allow lateral expansion and contraction. This shall result in a structural panel that will not require support columns every 4'. ·

When tested in accordance with paragraphs 4.5.1.4.5 of Mil-B-28658D, the panel and core shall have the following Flame Spread ratings;

Flame spread Fuel contributed Smoke developed

25 or less

SSP: SERM-024-24 10 of 10 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S.

SHIP: YFNX-20 (RMC 22747) ITEM NO: 436-11-001 (E6)

COAR: 28 PCN: SERM-L009

CSWT FILE NO: 436-007 (CG 47) CMP: NONE

REVISED: 25 SEP 2022 PLANNER: NEWSOME, TERRY

BENNETT, KEITH

BRIDGER, WRAY

KRIMMER, DAVID

SSP: SERM-024-24 1 of 3 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Fire and Flooding Alarm and Warning System Assessment and Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout the Barge

1.3 Identification:

1.3.1 Quantity (One EA), Control Panel, Honeywell Fire-Lite or equivalent

(E5)

1.3.2 Quantity (20 EA), Detector, Thermal Fire, Model DT-135CS or equivalent

(E5)

1.3.3 Quantity (6 EA), Liquid Level Switch, Type IC/R1-U or

equivalent

(E5)

1.3.4 Quantity (4 EA), Horn, Model HDC-24 or equivalent (E5)

1.3.5 Quantity (4 EA), Bell, Model MBDC-6 or equivalent (E5)

1.3.6 Quantity (1,000 FT), Cable, Type: LSDCOP 1-1/2, Item No. 22, as Shown on Sheet One of 2.2, NSN: 6145-01-202-2776 or equivalent

(E5)

2. REFERENCES:

2.1 Standard Items

2.2 7029583,401-7029583, Fire and Flooding Alarms (E1)

2.3 7029582 302-7029582 Rev B, YFNX-20, Power Distribution and Lighting (E1)

2.4 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.5 MIL-STD-1310H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP) Mitigation, and Safety

2.6 605-2540769 Rev D, Label Plate Standards

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1 for the services of an authorized original equipment manufacturer (OEM) service provider to remove, disassemble, inspect, repair, install, reassemble, test, adjust, and provide each special tool and drawing for each equipment listed in

1.3 and located in 1.2.

(E5)

3.2 Remove existing and install new the equipment listed in 1.3, using

SSP: SERM-024-24 2 of 3 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.2 through 2.5 for guidance, as designated by the SUPERVISOR.

3.2.1 Install new an additional 2 EA Thermal Fire Detector, one EA Horn, and one EA Bell (for a total of 12 EA Thermal Fire Detector, 6 EA Horn, and 6 EA Bell) for each void.

3.2.2 Ensure each Liquid Level Switch is installed in accordance wiht General Note 10 of 2.2.

3.2.3 Remove existing and install new One EA smoke detector (for a total of 6 EA) for each void.

3.2.3.1 Ensure each smoke detector is powered (hardwired) from power distribution system.

3.2.4 Template exact size, configuration, and location from each existing shipboard condition.

3.2.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A and D, Lines One through 7.

3.2.6 Electrical equipment and cable removal and installation must conform to the requirements of 2.4.

3.2.7 Bond and ground equipment in accordance with 2.5.

3.2.8 Remove each unused clip, hanger, electrical button, and stud from overhead, deck and each bulkhead.

3.2.9 Chip and grind each surface flush in way of removals.

3.2.10 Accomplish the requirements of 009-25 of 2.2, for a air hose test of each new and disturbed penetration. Allowable leakage: None.

3.3 Provide 5 mandays of labor and 1,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR. If the total costs are less than the authorized manday and dollar amounts, remaining funds will be subject to recoupment.

The contractor is not authorized to exceed these limits.

(Q)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test the fire and flooding detection system, and each smoke detector, to ensure the operation and functionality of the alarm monitoring panel, associated circuitry, each audible and visual alarm indicator, and sensor function as designed, using 2.3 and 2.4 for guidance.

3.5 Install each new label plate for each component, in accordance with

2.2 through 2.4, using 2.6 for guidance.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.Known Original Equipment Manufacture (OEM):

Siemens Building Technology

Stephen (Matt) Moore

(E6)

SSP: SERM-024-24 3 of 3 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Senior Sales Executive, Fire Safety and Security

6737 W. Washington Street

Suite 3125

West Allis, WI 53214

Mobile: (414)514-9129

Email: moore@siemens.com

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.