dd1423-2 FINAL.pdf

DoD Form PDF 188 KB Posted

Attached to
Printed Wiring Board Equipment
Solicitation number
F3QCCL0254A002
Issued by

View the file

Other versions and copies of DD Form 1423-2

File Revision Posted Attached to
I.14. CDRL DRAFT FOR RFQ - DD1423-2 Template R 01.25.2022.pdf Jan 25, 2022 Experimental Acoustic Navigation - WHOI
Attachment 4 - DD1423-2 CDRL.pdf Revision not stated Robins AFB Airfield Management Operations
24R0003 Attachment IX N-3 CDRL DD1423-2 Items 0004 - 0005 Cost Report and Govt Meal Report (1).pdf Revision not stated US FLAG HOST SHIP FOR NAVAL SPECIAL WARFARE w MOON POOL
24R0003 Attachment IX N-2 CDRL DD1423-2 Item 0002 - 0003 CBRN and CBRN Inventory.pdf Revision not stated US FLAG HOST SHIP FOR NAVAL SPECIAL WARFARE w MOON POOL
240003 Attachment IX N-4 CDRL DD1423-2 Items 0006-0007 Safety Meetings Minutes and Diver Air Quality (1).pdf Revision not stated US FLAG HOST SHIP FOR NAVAL SPECIAL WARFARE w MOON POOL
24R0003 Attachment IX N-1 CDRL DD1423-2 Item 0001 - NEURS (1).pdf Revision not stated US FLAG HOST SHIP FOR NAVAL SPECIAL WARFARE w MOON POOL
DD FORM 1423-2 Signed.pdf Revision not stated Robins AFB Fitness Center Sports Officials
Exhibit A CDRL DD 1423-2 NPTU YFNX-20 SSP_024-24.pdf Revision not stated U. S. NAVY BARGE YFNX-20 NPTU SOLICITATION
CDRL_DD1423-2_ACS_1.pdf Revision not stated Access Control System
CDRL_DD1423-2_ACS_2.pdf Revision not stated Access Control System
CDRL_DD1423-2_ACS_5.pdf Revision not stated Access Control System
CDRL_DD1423-2_ACS_4.pdf Revision not stated Access Control System
CDRL_DD1423-2_ACS_3.pdf Revision not stated Access Control System
Exhibit A_CDRL DD Form 1423-2_RFP _Redacted.pdf Revision not stated Undersea Weapons and Undersea Defensive (UW/UD) Family of Systems (FoS) Multiple Award Contract (MAC)
CDRLs DD Form 1423-2.pdf Revision not stated Saab AUV62-AT System Engineering Services
Attachment N-2 CDRL DD1423-2 Item 0002 - 0003 CBRN and CBRN Inventory.pdf Revision not stated Special Time Charter for Marine Support Vessel
Attachment N-1 CDRL DD 1423-2 Item 0001 - NEURS.pdf Revision not stated Special Time Charter for Marine Support Vessel
Attachment N-3 CDRL DD1423-2 Items 0004 Cost Report.pdf Revision not stated Special Time Charter for Marine Support Vessel
15. dd1423-2_Certificate of Comp - no signature.pdf Revision not stated Ultrasonic Sieve System
15. dd1423-2_Certificate of Comp - no signature.pdf Revision not stated Ultrasonic Sieve System
Show all 20

Who attaches DD Form 1423-2

Other files

File Type Posted
Appendix C-67870.docx DOCX document
RFQ F3QCCL0254A002.docx DOCX document
PWS- WIRING BOARD 67870 1 SEP 2020.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, AUG 96

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-2 (BACK), AUG 96

A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP: Off
TIM: Off
OTHER:
D_SYSTEMITEM: PWB Equip Preventive Maintenance
E_CONTRACTPR_NO:
FCONTRACTOR:
1_DATA_ITEM_NO1: A001
2_TITLE_OF_DATA_ITEM1: Contractor's Standard Operating Procedures
3_SUBTITLE1: Safety Plan
4_AUTHORITY1: DI-MGMT-81580
5_CONTRACT_REFERENCE1: PWS 4.11.1
6_REQUIRING_OFFICE1: WR-ALC/SE (Safety Office)
7_DD_250_REQ1: NO
8_APP_CODE1: A
9_dist1: A
10_FREQUENCY1: 1 TIME
11_AS_OF_DATE1: N/A
12_DATE_OF_FIRST_SUB1: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB1: SEE BLK 16
addr1_1: WR-ALC/SE
draft1_1: 1
reg1_1: 1
repro1_1:
1_DATA_ITEM_NO2: A002
2_TITLE_OF_DATA_ITEM2: Accident/ Incident Report
3_SUBTITLE2: n/a
4_AUTHORITY2: DI-SAFT-81563 NOT 1
5_CONTRACT_REFERENCE2: PWS 4.11.2
6_REQUIRING_OFFICE2: WR-ALC/SE (Safety Office)
7_DD_250_REQ2: NO
8_APP_CODE2: N/A
9_dist2: A
10_FREQUENCY2: AS REQ
11_AS_OF_DATE2: SEE BLK 16
12_DATE_OF_FIRST_SUB2: AS REQ
13_DATE_OF_SUBSEQUENT_SUB2: SEE BLK 16
addr2_1: WR-ALC/SE
draft2_1:
reg2_1: 1
repro2_1:
addr1_2: 420 Richard Ray Blvd
draft1_2:
reg1_2:
repro1_2:
addr1_3: Robins AFB, GA 31098
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6: AFSC/PZIMB
draft1_6: 1
reg1_6: 1
repro1_6:
addr1_7: 375 Perry St
draft1_7:
reg1_7:
repro1_7:
addr1_8: Bldg 255
draft1_8:
reg1_8:
repro1_8:
addr1_9: Robins AFB, GA 31098
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
15_total_Draft1: 2
15_TOTALReg1: 2
15_TOTALRepro1: 0
16_REMARKS1: BLK 12: Submit draft for review/approval within 10 working days after contract award.

BLK 13: Submit final copies 10 working days after Government (WR-ALC/SE) acceptance of draft. Revisions as required. Electronic copies can be sent to the WR-ALC/SE POC:

Kathya Prescott, Safety Specialist

DSN 468-2754

COMM (478)926-2754

email: 402mxw.se.wf@us.af.mil

Electronic copies to AFSC/PZIMB can be the PCO, Roy Peterson at roy.peterson.6@us.af.mil

17_PRICE_GROUP1:
18_totalprice1:
addr2_2: 420 Richard Ray Blvd
addr2_3: Suite 100
addr2_4: Robins AFB, GA 31098
16_REMARKS2: Block 11: Telephone notification of any accident/incident should be made immediately and

not more than 4 hours after occurrence. Submit written report within 3 calendar days of mishap.

Block 13: Submit information that is not available at the time of the accident/incident within 20 calendar days after occurrence. Electronic copies can be sent to the WR-ALC/SE POC:

Kathya Prescott, Safety Specialist

DSN 468-2754

COMM (478)926-2754

email: 402mxw.se.wf@us.af.mil

Electronic copies to AFSC/PZIMB can be the PCO, Roy Peterson at roy.peterson.6@us.af.mil

17_PRICE_GROUP2:
18_totalprice2:
addr2_5:
addr2_6: AFSC/PZIMB
addr2_7: 375 Perry St
addr2_8: Bldg 255
addr2_9: Robins AFB, GA 31098
addr2_10:
addr2_11:
addr2_12:
addr2_13:
addr2_14:
draft2_2:
reg2_2:
repro2_2:
draft2_3:
reg2_3:
repro2_3:
draft2_4:
reg2_4:
repro2_4:
draft2_5:
reg2_5:
repro2_5:
draft2_6:
reg2_6: 1
repro2_6:
draft2_7:
reg2_7:
repro2_7:
draft2_8:
reg2_8:
repro2_8:
draft2_9:
reg2_9:
repro2_9:
draft2_10:
reg2_10:
repro2_10:
draft2_11:
reg2_11:
repro2_11:
draft2_12:
reg2_12:
repro2_12:
draft2_13:
reg2_13:
repro2_13:
draft2_14:
reg2_14:
repro2_14:
15_total_Draft2: 0
15_TOTALReg2: 2
15_TOTALRepro2: 0
G_PREPARED_BY:
H_DATE: 20200902
1_APPROVED_BY:
J_DATE: 20200902
Page: 1
of_pages: 2
Reset:
2020-09-02T12:45:06-0400
MORRIS.BRANDI.T.1229893277
2020-09-02T12:45:24-0400
MORRIS.BRANDI.T.1229893277

File details come from the government source that posted it. Updated .