DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf
PDF 610 KB Posted
- Solicitation number
- SLAC_RFP_368509
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Cost Detail Breakdown template for Section L, Attachment A of RFP #368509 for CUIR SP1 Master Substation Annex Construction at the SLAC National Accelerator Laboratory.
The template is structured to capture both direct and indirect costs organized by Construction Specifications Institute (CSI) divisions. Direct costs include 24 line items spanning demolition, concrete, masonry, steel, wood/composites, moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying, fire protection, plumbing, HVAC, electrical, communications, safety/security, earthwork, exterior improvements, utilities, and material handling. Indirect costs consist of general conditions, general requirements/site requirements, bonds and insurance, and overhead and profit. Each cost category includes columns for Labor, Material Cost, Equipment Cost, and Total Cost, with all entries currently showing zero values. The template concludes with a Total Base Scope line. This is a draft document that subcontractors are expected to complete with their detailed cost proposals for the construction project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section L - Attachment A
COST DETAIL BREAKDOWN
CUIR SP1 Master Substation Annex Construction
RFP #: 368509
Subcontractor:
MH Cost Base Scope Direct Costs
02 00 00 Demolition/Temp. Construction -$ 03 00 00 Concrete -$ 04 00 00 Masonry -$ 05 00 00 Steel/Misc. Steel -$ 06 00 00 Woods/Plastics/Composites/Millwork -$ 07 00 00 Moisture Protection/Insulation/Roofing -$ 08 00 00 Openings/Windows/Doors/Hardware -$ 09 00 00 Finishes -$ 10 00 00 Specialties -$ 11 00 00 Equipment -$ 12 00 00 Furnishings -$ 13 00 00 Special Construction -$ 14 00 00 Conveying -$ 21 00 00 Fire Protection -$ 22 00 00 Plumbing -$ 23 00 00 Heating, Venting & Air Conditioning -$ 26 00 00 Electrical -$ 27 00 00 Communications -$ 28 00 00 Safety/Security/Access Control -$ 31 00 00 Earthwork -$ 32 00 00 Exterior Improvements -$ 33 00 00 Utilities -$ 41 00 00 Material Handling -$
Direct Costs Subtotal -$ Base Scope Indirect Costs
General Conditions -$ General Requirements/Site Requirements -$ Bonds and Insurance -$ Overhead and Profit -$ Indirect Costs Subtotal -$
DESCRIPTION
TOTAL BASE SCOPE
Labor Material Cost Total CostEquipment Cost
DRAFT
DRAFT
Price Detail Breakdown