DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf

PDF 610 KB Posted

Attached to
SLAC CUIR SP1 Master Substation Annex Building Construction
Solicitation number
SLAC_RFP_368509
Issued by

About this file

This document is a Cost Detail Breakdown template for Section L, Attachment A of RFP #368509 for CUIR SP1 Master Substation Annex Construction at the SLAC National Accelerator Laboratory.

The template is structured to capture both direct and indirect costs organized by Construction Specifications Institute (CSI) divisions. Direct costs include 24 line items spanning demolition, concrete, masonry, steel, wood/composites, moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying, fire protection, plumbing, HVAC, electrical, communications, safety/security, earthwork, exterior improvements, utilities, and material handling. Indirect costs consist of general conditions, general requirements/site requirements, bonds and insurance, and overhead and profit. Each cost category includes columns for Labor, Material Cost, Equipment Cost, and Total Cost, with all entries currently showing zero values. The template concludes with a Total Base Scope line. This is a draft document that subcontractors are expected to complete with their detailed cost proposals for the construction project.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_00_Cover_Letter.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L - Attachment A

COST DETAIL BREAKDOWN

CUIR SP1 Master Substation Annex Construction

RFP #: 368509

Subcontractor:

MH Cost Base Scope Direct Costs

02 00 00 Demolition/Temp. Construction -$ 03 00 00 Concrete -$ 04 00 00 Masonry -$ 05 00 00 Steel/Misc. Steel -$ 06 00 00 Woods/Plastics/Composites/Millwork -$ 07 00 00 Moisture Protection/Insulation/Roofing -$ 08 00 00 Openings/Windows/Doors/Hardware -$ 09 00 00 Finishes -$ 10 00 00 Specialties -$ 11 00 00 Equipment -$ 12 00 00 Furnishings -$ 13 00 00 Special Construction -$ 14 00 00 Conveying -$ 21 00 00 Fire Protection -$ 22 00 00 Plumbing -$ 23 00 00 Heating, Venting & Air Conditioning -$ 26 00 00 Electrical -$ 27 00 00 Communications -$ 28 00 00 Safety/Security/Access Control -$ 31 00 00 Earthwork -$ 32 00 00 Exterior Improvements -$ 33 00 00 Utilities -$ 41 00 00 Material Handling -$

Direct Costs Subtotal -$ Base Scope Indirect Costs

General Conditions -$ General Requirements/Site Requirements -$ Bonds and Insurance -$ Overhead and Profit -$ Indirect Costs Subtotal -$

DESCRIPTION

TOTAL BASE SCOPE

Labor Material Cost Total CostEquipment Cost

DRAFT

DRAFT

Price Detail Breakdown