This is a work instruction document for ABB MV Switchgear shipping preparation procedures at the Mebane, North Carolina facility.

The document provides detailed procedural guidance for preparing medium voltage switchgear for shipment. Key procedures include: closing and securing front and rear doors and panels; installing shipping member labels on all shipping bases and extensions; installing storage, jacking, and bus support installation labels (bus support labels not required on 63kA gear); protecting all corners with cardboard corners while avoiding placement of tape on UL labels; installing plastic covers to provide 100 percent coverage of the shipping section, rolling covers over the top of equipment, and securing excess material with clear tape; installing frame/pallet identification sheets and caution signs on sides and front of sections; applying stretch wrap from the bottom of sections in overlapping layers to an 88-inch height and securing with clear tape; preparing plenums by placing them on pallets, installing storage labels, strapping to pallets, installing plastic covers, and shrink wrapping; and generating and obtaining required approvals on the Ship Information Form (1VAM-T0005-020003) from group leaders, project managers, and shipping leaders before shipment. Additional responsibilities include booking dedicated trucks with detailed shipment information including weights and dimensions, loading trucks with heaviest gears toward the front for load balancing and securing with straps or chains, verifying all items from the shipping information form are loaded, and providing the truck driver with a bill of lading and delivery documentation. All assembly personnel must follow quality workmanship standards and health and safety requirements, including use of safety glasses, gloves, steel-toe shoes, and safety harnesses when working at heights.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_00_Cover_Letter.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCONTROLLED

COPY

Uncontrolled copy Disregard After 06/11/2025

Uncontrolled

Copy

Uncontrolled

Copy

Electrification Business Distribution Solutions

North America

Document ID Number:

1VAM-T0004-020086

QMS Document Path:

Windchill

Current Revision: 6

Effective Date: Upon Windchill Release

Owner: Production Supervisor

Title: MV SWGR Shipping Preparation

Author: Jordan Curington

Approver(s): Quality manager and Operations manager

1 PROCESS MAP

N/A

2 PURPOSE

To provide work instructions for ABB MV Switchgear shipping preparation.

3 SCOPE/INTRODUCTION

This procedure applies to ABB MV Switchgear at the Mebane, NC facility.

4 RESPONSIBILITY

It is the responsibility of all ABB MV Switchgear assembly personnel to understand and follow this procedure. It is the responsibility of management to ensure assembly personnel are trained on this document and that this document is maintained and updated.

DRAFT

Uncontrolled

Copy

Uncontrolled

5 TOOLS & MATERIALS REQUIRED

Clear Tape

Masking Tape (Blue)

Strapping Dispenser

Stretch Wrap Cardboard Corners

Uncontrolled

Copy

6 SAFETY PRACTICE

Safety glasses, gloves, and steel toe shoes should be used as the standard safety practice.

When performing work on top of switchgear, a safety harness should be used. All ladder safety standards must be followed.

7 PROCEDURE

All switchgear assembly personnel are to follow quality workmanship standards (Document number: 1VAM-T0004-900019) as well as health and safety requirements.

7.1 Front and rear door closing

After Quality Assurance Team has cleared the section for shipping, close front and rear panels.

Tighten all rear door bolts • Confirm all latched doors are fully closed

• If front doors are bolted style, tighten all bolts.

Uncontrolled

Copy

7.2 Shipping Member Label Installation

Shipping Member Label on all Shipping Bases and Shipping Base Extensions

Uncontrolled

Copy

7.3 Storage, Jacking & Bus Support Installation Labels

Jacking Caution Tag

(Installed by QA)

Storage Label:

Identify Job Number and frames on

The shipping Section

Bus Support Installation Label

(Not required on 63kA gear)

Uncontrolled

Copy

7.4 Corner and sharp edge protection

• Protect all corners of the gear

• DO NOT Place any tape on UL labels

• DO NOT USE clear tape

Uncontrolled

Copy

7.5 Plastic Cover Installation

Spread plastic cover so it covers 100% of the shipping section

Roll plastic cover on top of the gear and cut at floor level.

Use Safety Harness if going on top of the gear

Fold the excess and secure with clear tape DRAFT

Uncontrolled

Copy

Uncontrolled

7.6 Frame/Pallet identification Sheet & Caution Signs

• Attach one on each side of the section.

• Use clear tape

• Attach one on the front of the section.

• Use clear tape

• Pallet # to match with information on Ship Loose Form (1VAM-T0005-020003)

Uncontrolled

Copy

Uncontrolled

Caution: Do not strap above Vent Chamber or any large openings. (see below for visual indication)

• Attach one on both sides of shipping split at the top above Vent Chamber and any other large openings

Uncontrolled

Copy

Uncontrolled

7.7 Stretch Wrapping

• Start shrink wrap at the bottom of the section

• Go around the unit overlapping layers until 88” height is reached

• Secure with clear tape

Uncontrolled

Copy

7.8 Plenums

• Set plenums on pallet

• Install storage label with job and frame information

• Strap to pallet

• Install plastic cover

• Shrink wrap

Uncontrolled

Copy

7.9 Ship Information Form

7.9.1 Assembly/Wiring leader generates Ship Information Form (1VAM- T0005-020003) for the Shop Order.

7.9.2 Assembly/Wiring leader generates Part/Pallet identification labels

All ship loose parts and quantities are listed on the form.

Pallet# is reference for all parts.

Uncontrolled

Copy

7.9.3 Parts placed into pallets. Capture part/pallet information Ship Information Form (1VAM-T0005-020003.)

Part/Pallet Identification Label

• Attach one to every pallet.

• Pallet # to match with information on Ship Loose Form (1VAM-T0005-020003)

Uncontrolled

Copy

7.9.4 Approve Shipping Information Form

*ALL Approvals Must Be Received and Present on Shipping Information Form Prior to Shipment. Approval Needed from Group Leader, Project Manager, and Shipping Leader*

Uncontrolled

Copy

Uncontrolled

Copy

7.9.5 Archive Shipping Information Form to Quality Record Retention folder within local shared drive per Quality Records 1VAM-T0003-900008.

7.9.5.1 For Ship Shorts Project Management will facilitate the completion of the “Ship Short Update” portion of the Shipping Information Form once the remaining items have been shipped.

7.10 Dedicated Truck Booking

7.10.1 Shipper gathers all information about the shipment from production including number of frames shipping, number of breakers and number of ship loose components and accessories.

7.10.2 Shipper reviews engineering drawings to gather weights and dimensions for main frames of the gear.

7.10.3 Shipper takes physical measurements ship loose components.

7.10.4 Shipper compiles information of weights, dimensions, ship to address, ship to contact name, ship to contact number and sends an official request for quote from dedicated carriers. Shipper send booking acceptance to lowest cost provider maintaining delivery date requirements from project management.

7.11 Loading Truck

7.11.1 Truck is loaded with heaviest gears to the front of the truck and small materials to the back for load balancing. Gear is to be centered on trailer and secured with straps or chains.

7.11.2 Shipper signs off that every item on the shipping information form is loaded on trailer and signs off on each line item that is loaded.

Uncontrolled

Copy

Uncontrolled

Copy

7.11.3 Any missing components must immediately be reviewed by production and project management before releasing the truck for shipment.

7.11.4 Shipper gives truck driver a Bill of Lading with the number of pieces on the truck clearly identified and the actual weight of shipment. Shipper gives truck driver customer’s copy of paperwork which includes an official ABB Delivery Note and shipping information form stapled together. Shipper has truck driver sign a copy of the delivery note and shipping information form and files the paperwork.

REV. DATE DESCRIPTION

1 12/29/20 Initial Release for Mebane. (1VAL-T0004-101417)

2 05/10/21 Corrected form number on page 11.

3 06/25/21 Updated section 7.9 and added 7.10 and 7.11

4 08/12/21 Updated section 7.6 (Frame/Pallet Identification Sheet & Caution Signs)

5 8/18/21 Corrected Label in section 7.6

6 04/17/23 7.4 DO NOT Place any tape on UL labels

File details come from the government source that posted it. Updated .