DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf
PDF 3 MB Posted
- Solicitation number
- SLAC_RFP_368509
- Issued by
-
Department of Energy Office of Science
About this file
This is a work instruction document for ABB MV Switchgear shipping preparation procedures at the Mebane, North Carolina facility.
The document provides detailed procedural guidance for preparing medium voltage switchgear for shipment. Key procedures include: closing and securing front and rear doors and panels; installing shipping member labels on all shipping bases and extensions; installing storage, jacking, and bus support installation labels (bus support labels not required on 63kA gear); protecting all corners with cardboard corners while avoiding placement of tape on UL labels; installing plastic covers to provide 100 percent coverage of the shipping section, rolling covers over the top of equipment, and securing excess material with clear tape; installing frame/pallet identification sheets and caution signs on sides and front of sections; applying stretch wrap from the bottom of sections in overlapping layers to an 88-inch height and securing with clear tape; preparing plenums by placing them on pallets, installing storage labels, strapping to pallets, installing plastic covers, and shrink wrapping; and generating and obtaining required approvals on the Ship Information Form (1VAM-T0005-020003) from group leaders, project managers, and shipping leaders before shipment. Additional responsibilities include booking dedicated trucks with detailed shipment information including weights and dimensions, loading trucks with heaviest gears toward the front for load balancing and securing with straps or chains, verifying all items from the shipping information form are loaded, and providing the truck driver with a bill of lading and delivery documentation. All assembly personnel must follow quality workmanship standards and health and safety requirements, including use of safety glasses, gloves, steel-toe shoes, and safety harnesses when working at heights.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCONTROLLED
COPY
Uncontrolled copy Disregard After 06/11/2025
Uncontrolled
Copy
Uncontrolled
Copy
Electrification Business Distribution Solutions
North America
Document ID Number:
1VAM-T0004-020086
QMS Document Path:
Windchill
Current Revision: 6
Effective Date: Upon Windchill Release
Owner: Production Supervisor
Title: MV SWGR Shipping Preparation
Author: Jordan Curington
Approver(s): Quality manager and Operations manager
1 PROCESS MAP
N/A
2 PURPOSE
To provide work instructions for ABB MV Switchgear shipping preparation.
3 SCOPE/INTRODUCTION
This procedure applies to ABB MV Switchgear at the Mebane, NC facility.
4 RESPONSIBILITY
It is the responsibility of all ABB MV Switchgear assembly personnel to understand and follow this procedure. It is the responsibility of management to ensure assembly personnel are trained on this document and that this document is maintained and updated.
DRAFT
Uncontrolled
Copy
Uncontrolled
5 TOOLS & MATERIALS REQUIRED
Clear Tape
Masking Tape (Blue)
Strapping Dispenser
Stretch Wrap Cardboard Corners
Uncontrolled
Copy
6 SAFETY PRACTICE
Safety glasses, gloves, and steel toe shoes should be used as the standard safety practice.
When performing work on top of switchgear, a safety harness should be used. All ladder safety standards must be followed.
7 PROCEDURE
All switchgear assembly personnel are to follow quality workmanship standards (Document number: 1VAM-T0004-900019) as well as health and safety requirements.
7.1 Front and rear door closing
After Quality Assurance Team has cleared the section for shipping, close front and rear panels.
Tighten all rear door bolts • Confirm all latched doors are fully closed
• If front doors are bolted style, tighten all bolts.
Uncontrolled
Copy
7.2 Shipping Member Label Installation
Shipping Member Label on all Shipping Bases and Shipping Base Extensions
Uncontrolled
Copy
7.3 Storage, Jacking & Bus Support Installation Labels
Jacking Caution Tag
(Installed by QA)
Storage Label:
Identify Job Number and frames on
The shipping Section
Bus Support Installation Label
(Not required on 63kA gear)
Uncontrolled
Copy
7.4 Corner and sharp edge protection
• Protect all corners of the gear
• DO NOT Place any tape on UL labels
• DO NOT USE clear tape
Uncontrolled
Copy
7.5 Plastic Cover Installation
Spread plastic cover so it covers 100% of the shipping section
Roll plastic cover on top of the gear and cut at floor level.
Use Safety Harness if going on top of the gear
Fold the excess and secure with clear tape DRAFT
Uncontrolled
Copy
Uncontrolled
7.6 Frame/Pallet identification Sheet & Caution Signs
• Attach one on each side of the section.
• Use clear tape
• Attach one on the front of the section.
• Use clear tape
• Pallet # to match with information on Ship Loose Form (1VAM-T0005-020003)
Uncontrolled
Copy
Uncontrolled
Caution: Do not strap above Vent Chamber or any large openings. (see below for visual indication)
• Attach one on both sides of shipping split at the top above Vent Chamber and any other large openings
Uncontrolled
Copy
Uncontrolled
7.7 Stretch Wrapping
• Start shrink wrap at the bottom of the section
• Go around the unit overlapping layers until 88” height is reached
• Secure with clear tape
Uncontrolled
Copy
7.8 Plenums
• Set plenums on pallet
• Install storage label with job and frame information
• Strap to pallet
• Install plastic cover
• Shrink wrap
Uncontrolled
Copy
7.9 Ship Information Form
7.9.1 Assembly/Wiring leader generates Ship Information Form (1VAM- T0005-020003) for the Shop Order.
7.9.2 Assembly/Wiring leader generates Part/Pallet identification labels
All ship loose parts and quantities are listed on the form.
Pallet# is reference for all parts.
Uncontrolled
Copy
7.9.3 Parts placed into pallets. Capture part/pallet information Ship Information Form (1VAM-T0005-020003.)
Part/Pallet Identification Label
• Attach one to every pallet.
• Pallet # to match with information on Ship Loose Form (1VAM-T0005-020003)
Uncontrolled
Copy
7.9.4 Approve Shipping Information Form
*ALL Approvals Must Be Received and Present on Shipping Information Form Prior to Shipment. Approval Needed from Group Leader, Project Manager, and Shipping Leader*
Uncontrolled
Copy
Uncontrolled
Copy
7.9.5 Archive Shipping Information Form to Quality Record Retention folder within local shared drive per Quality Records 1VAM-T0003-900008.
7.9.5.1 For Ship Shorts Project Management will facilitate the completion of the “Ship Short Update” portion of the Shipping Information Form once the remaining items have been shipped.
7.10 Dedicated Truck Booking
7.10.1 Shipper gathers all information about the shipment from production including number of frames shipping, number of breakers and number of ship loose components and accessories.
7.10.2 Shipper reviews engineering drawings to gather weights and dimensions for main frames of the gear.
7.10.3 Shipper takes physical measurements ship loose components.
7.10.4 Shipper compiles information of weights, dimensions, ship to address, ship to contact name, ship to contact number and sends an official request for quote from dedicated carriers. Shipper send booking acceptance to lowest cost provider maintaining delivery date requirements from project management.
7.11 Loading Truck
7.11.1 Truck is loaded with heaviest gears to the front of the truck and small materials to the back for load balancing. Gear is to be centered on trailer and secured with straps or chains.
7.11.2 Shipper signs off that every item on the shipping information form is loaded on trailer and signs off on each line item that is loaded.
Uncontrolled
Copy
Uncontrolled
Copy
7.11.3 Any missing components must immediately be reviewed by production and project management before releasing the truck for shipment.
7.11.4 Shipper gives truck driver a Bill of Lading with the number of pieces on the truck clearly identified and the actual weight of shipment. Shipper gives truck driver customer’s copy of paperwork which includes an official ABB Delivery Note and shipping information form stapled together. Shipper has truck driver sign a copy of the delivery note and shipping information form and files the paperwork.
REV. DATE DESCRIPTION
1 12/29/20 Initial Release for Mebane. (1VAL-T0004-101417)
2 05/10/21 Corrected form number on page 11.
3 06/25/21 Updated section 7.9 and added 7.10 and 7.11
4 08/12/21 Updated section 7.6 (Frame/Pallet Identification Sheet & Caution Signs)
5 8/18/21 Corrected Label in section 7.6
6 04/17/23 7.4 DO NOT Place any tape on UL labels