DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf

PDF 596 KB Posted

Attached to
SLAC CUIR SP1 Master Substation Annex Building Construction
Solicitation number
SLAC_RFP_368509
Issued by

About this file

This is a Section J attachment list document from SLAC National Accelerator Laboratory outlining required submittal documents for a construction subcontract. The document specifies nine attachments that subcontractors must provide or acknowledge, establishing the administrative and compliance framework for construction subcontracting activities.

The required attachments include: Construction Wage Rate Determination (CA20260018, 93 pages, September 17, 2026); Subcontractor Safety Injury and Illness Prevention Plan Acknowledgement Form (1 page, May 27, 2026); Standard Form SF1413 (2 pages, Rev. 10/2023); Small Business Subcontracting Plan Model (7 pages, October 7, 2026); Subcontractor Safety Qualification Form (5 pages, May 21, 2021); NTP Submittal Checklist (1 page, June 14, 2024); Final Inspection Report (2 pages); Construction Subcontracts Final Release (1 page, December 16, 2020); and Labor Rate Sheet (to be furnished by subcontractor, no page count specified). These documents address prevailing wage compliance, safety qualifications and prevention planning, federal contracting forms, small business participation, project initiation requirements, inspection protocols, contract closure, and labor rate transparency. The document is marked as a draft and is part of SLAC's Supply Chain Management procedures.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_00_Cover_Letter.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION J (REV. 06/04/12) SLAC-SCM-GEN-036 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section J – List of Attachments

Document Type Description Pages Date

Attachment 1 Construction Wage Rate Determination CA20260018 – Mod No. XX

93 September 17, 2026

Attachment 2 Subcontractor Safety Injury and Illness Prevention Plan Acknowledgement Form (IIPP)

1 May 27, 2026

Attachment 3 Standard Form SF1413 2 Rev. 10/2023

Attachment 4 Small Business Subcontracting Plan Model 7 October 7, 2026

Attachment 5 Subcontractor Safety Qualification Form (SQF) 5 May 21, 2021

Attachment 6 NTP Submittal Checklist 1 June 14, 2024

Attachment 7 Final Inspection Report 2 N/A

Attachment 8 Construction Subcontracts Final Release 1 December 16, 2020

Attachment 9 Labor Rate Sheet (Subcontractor must furnish) N/A N/A

DRAFT

File details come from the government source that posted it. Updated .