DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf
PDF 596 KB Posted
- Solicitation number
- SLAC_RFP_368509
- Issued by
-
Department of Energy Office of Science
About this file
This is a Section J attachment list document from SLAC National Accelerator Laboratory outlining required submittal documents for a construction subcontract. The document specifies nine attachments that subcontractors must provide or acknowledge, establishing the administrative and compliance framework for construction subcontracting activities.
The required attachments include: Construction Wage Rate Determination (CA20260018, 93 pages, September 17, 2026); Subcontractor Safety Injury and Illness Prevention Plan Acknowledgement Form (1 page, May 27, 2026); Standard Form SF1413 (2 pages, Rev. 10/2023); Small Business Subcontracting Plan Model (7 pages, October 7, 2026); Subcontractor Safety Qualification Form (5 pages, May 21, 2021); NTP Submittal Checklist (1 page, June 14, 2024); Final Inspection Report (2 pages); Construction Subcontracts Final Release (1 page, December 16, 2020); and Labor Rate Sheet (to be furnished by subcontractor, no page count specified). These documents address prevailing wage compliance, safety qualifications and prevention planning, federal contracting forms, small business participation, project initiation requirements, inspection protocols, contract closure, and labor rate transparency. The document is marked as a draft and is part of SLAC's Supply Chain Management procedures.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy
SECTION J (REV. 06/04/12) SLAC-SCM-GEN-036 PAGE 1 OF 1
SUPPLY CHAIN MANAGEMENT
Section J – List of Attachments
Document Type Description Pages Date
Attachment 1 Construction Wage Rate Determination CA20260018 – Mod No. XX
93 September 17, 2026
Attachment 2 Subcontractor Safety Injury and Illness Prevention Plan Acknowledgement Form (IIPP)
1 May 27, 2026
Attachment 3 Standard Form SF1413 2 Rev. 10/2023
Attachment 4 Small Business Subcontracting Plan Model 7 October 7, 2026
Attachment 5 Subcontractor Safety Qualification Form (SQF) 5 May 21, 2021
Attachment 6 NTP Submittal Checklist 1 June 14, 2024
Attachment 7 Final Inspection Report 2 N/A
Attachment 8 Construction Subcontracts Final Release 1 December 16, 2020
Attachment 9 Labor Rate Sheet (Subcontractor must furnish) N/A N/A