This is a Special Terms and Conditions document (Section H) for a fixed price construction subcontract issued by SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy.
The document establishes key administrative and operational requirements for the subcontract. Davis-Bacon compliance requires all subcontractors and lower-tier subcontractors to submit weekly certified payroll reports and labor compliance documentation electronically through the Labor Compliance Program Tracker (LCPtracker) web-based system. Field Change Order authority is delegated to the Construction Manager or Project Manager up to a maximum Not-To-Exceed amount of $25,000; any Field Change Orders exceeding this threshold require approval from the Subcontract Administrator. Three positions are designated as key personnel—Project Manager, Project Field Superintendent, and Site Safety Officer—and the subcontractor must provide 30 calendar days' written notice prior to any personnel changes, with justification and proposed replacements subject to written approval by the Subcontract Administrator.
The contractual representative is Quyen Weng (quyen@slac.stanford.edu), the sole authorized person for all subcontract modifications and changes to the Statement of Work and Schedule. The Technical Representative, Jase Perez, monitors work and clarifies technical requirements but lacks authority to modify the subcontract. The University will furnish two Medium-Voltage Switchgear units (Part Numbers 1VAL3149B01 and 1VAL3149A01, each valued at $1,680,500) upon notice of Notice to Proceed. The subcontractor assumes risk for loss or damage to government-furnished property except for reasonable wear and tear or consumption during performance, must maintain adequate property control records, clearly mark all government property, and upon subcontract completion must submit inventory schedules and prepare furnished property for shipment or other disposition as directed by the University.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy
SECTION H (REV. 06/04/12) SLAC-SCM-GEN-034 PAGE 1 OF 3
SUPPLY CHAIN MANAGEMENT
Section H – Special Terms and Conditions
Special Article 1: Reserved
Special Article 2: Reserved
Special Article 3: Reserved
Special Article 4: Electronic Web Submittal of Labor Compliance Reports (Davis-Bacon)
Each Subcontractor and Lower-tier subcontractor shall submit weekly certified payroll reports and labor compliance documentation electronically to SLAC utilizing Labor Compliance Program Tracker (LCPtracker), a web-based software tool. Access to LCPtracker is granted by SLAC; each Subcontractor will be issued a unique log-on identification and password.
Special Article 5: Field Change Order Authority
The Construction Manager (CM) or the Project Manager (PM) is authorized, in accordance with Article 30 of the General Terms and Conditions for Fixed Price Construction Subcontracts, (Section G), to issue Field Change Order(s) with a Not-To-Exceed (NTE) amount of up to a maximum amount of Twenty-Five Thousand dollars ($25,000.00). The Subcontract Administrator may change the NTE authority of the CM or PM by subcontract modification.
Field Change Order(s) greater than Twenty-Five Thousand dollars ($25,000.00) are required to be issued by the Subcontract Administrator.
Special Article 6: Key Personnel
The personnel specified below are considered essential to the work performed hereunder. The Subcontractor shall notify the Subcontract Administrator in writing 30 calendar days prior to changing key personnel of its own volition. Notification shall include justification (including proposed replacement) in sufficient detail to permit evaluation of the impact on the performance of this Subcontract. No replacement shall be made by the Subcontractor without the written consent of the Subcontract Administrator. The list of key personnel may be modified during the course of this Subcontract to either add or delete personnel, as appropriate.
NAME TITLE
Project Manager Project Field Superintendent Site Safety Officer
Special Article 7: Reserved
Special Article 8: Subcontract Administration
DRAFT
SECTION H (REV. 06/04/12) SLAC-SCM-GEN-034 PAGE 2 OF 3
A. The University’s contractual representative for this Subcontract is Quyen Weng. The contractual representative is the only person authorized to make changes in the requirements of this Subcontract or to make modifications to this Subcontract, including changes or modifications to the Statement of Work and the Schedule. The Subcontractor shall direct all notices and requests for approval required by this Subcontract to the contractual representative at the following address:
SLAC National Accelerator Laboratory Attn: Quyen Weng 2575 Sand Hill Road, M/S 01 Menlo Park, CA 94025 quyen@slac.stanford.edu
Any notices and/or approvals required on this Subcontract shall be issued solely by the contractual representative.
B. The University’s Technical Representative for this Subcontract is Jase Perez. The Technical Representative is the person designated to monitor the Subcontract work and to interpret and clarify the technical requirements of the Statement of Work. The Technical Representative is not authorized to make changes to the work or modify this Subcontract.
Special Article 9: Government Furnished Property
a. In connection with its work under this subcontract, the Seller shall be furnished by the University, the following Government owned property (hereinafter referred to as "Government-furnished property"):
The delivery schedules set forth in this subcontract are based upon the premise that the Government-furnished property will be delivered to the Seller in sufficient time to enable Seller to meet the said delivery schedules. In the event that such Government-furnished property is not delivered to Seller in sufficient time to enable Seller to meet said delivery schedules, the University shall, if requested by the Seller, determine if any delay has been occasioned by the Seller, and if so, shall grant a reasonable extension of the time for completion of performance. The University shall not be liable to the Seller for damages or loss of profit by reason of any delay in the delivery of said Government furnished property, except that in case of such delay, upon written request of the Seller an equitable adjustment shall be made in the delivery schedule, or price, or both, and in other contractual provisions affected thereby, in accordance with the procedures provided for in Article 30 entitled, "Changes" in General Terms and Conditions for Fixed Price Construction Subcontracts.
b. Government-furnished property shall not be affected by the incorporation or attachment thereof to any property not owned by the Government, nor shall any such property, or any part thereof, be or become a fixture or lose its identity as personal property by reason of affixation to any realty. The Seller shall
QTY
UOM
Property Description
Part Number/ Serial Number
Unit Value
Date to be Furnished
1 ea Medium-Voltage Switchgear 8 1VAL3149B01 1 – Each $1,680,500
Upon notice of NTP
1 ea Medium-Voltage Switchgear 9 1VAL3149A01 1 – Each $1,680,500
Upon notice of NTP DRAFT mailto:quyen@slac.stanford.edu
SECTION H (REV. 06/04/12) SLAC-SCM-GEN-034 PAGE 3 OF 3
maintain adequate property control records of such property consistent with good business practice and as may be prescribed by the University and shall cause all such property to be clearly marked (if not so marked) to show that it is property of the Government.
c. Government-furnished property shall be used for the performance of this subcontract only.
d. The Seller shall, in accordance with sound industrial practice, protect and preserve such Government-furnished property until disposed of by the Seller in accordance with this article. Should replacement of any such property become necessary during the term of this subcontract other than by reason of the negligence or fault of the Seller, the Seller shall, at the direction and for the account of the University, take all reasonable steps to protect the property remaining and shall repair or replace the lost, destroyed, or damaged property. Title thereto shall vest in the Government and any delay occasioned thereby shall be considered an excusable delay under this subcontract.
e. Unless otherwise provided in this subcontract, the Seller assumes the risk of and shall be responsible for any loss of or damage to the Government-furnished property in its possession except for reasonable wear and tear and except to the extent that such property is consumed in the performance of this subcontract.
f. The University shall at all times have access to the premises wherein any Government-furnished property is located.
g. Upon completion of this subcontract, the Seller shall submit, in a form acceptable to the University, inventory schedules covering all items of Government-furnished property not consumed in the performance of this subcontract (including any resulting scrap), or not theretofore delivered to the University. Upon the University's order the Seller shall prepare for shipment and, at the University's expense, shall store or deliver said property as may be directed by the University, or make such other disposal of said property as may be directed by the University.
Special Article 10: Reserved