DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf
PDF 963 KB Posted
- Solicitation number
- SLAC_RFP_368509
- Issued by
-
Department of Energy Office of Science
About this file
This is a Notice to Proceed Submittal Checklist used by SLAC National Accelerator Laboratory's Supply Chain Management division to verify that subcontractors have completed all required submissions before work commencement on a subcontract.
The checklist mandates eight key submittal requirements: (1) Performance and Payment Bonds with penal sums equal to the Fixed Firm Price Award for subcontracts valued at $35,000 and over; (2) approved insurance certificates; (3) Professional Errors and Omissions Insurance of not less than $1,000,000 per claim for subcontracts of $25,000 and over requiring design by the subcontractor; (4) Builder's All Risk Insurance covering physical damage to the full value of work for subcontracts of $50,000 and over; (5) completed Standard Form SF1413 "Statement and Acknowledgment" for all known Sub-Subcontractors; (6) copies of the subcontractor's licenses and permits and all known Sub-Subcontractor licenses or permits if needed for performance; (7) Issue for Construction Set (IFC) Drawings and Specifications; and (8) a project schedule in the format specified by the SLAC Project Manager. The document is dated June 14, 2024, and includes fields for project identification, purchase order number, subcontractor name, SLAC Project Manager, and SLAC Construction Manager.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLY CHAIN MANAGEMENT
NOTICE TO PROCEED SUBMITTALS
Project:
PO#:
Subcontractor:
SLAC PM:
SLAC CM:
NOTICE TO PROCEED CHECKLIST
Performance & Payment Bonds. Penal sum of Bonds must be equal to the FFP Award for Subcontracts of $35,000 and over.
Approved insurance certificates
Subcontracts of $25,000 and over requiring design by Subcontractor: Professional Errors and Omissions Insurance in the amount not less than $1,000,000 per claim.
Subcontracts of $50,000 and over: Subcontractor shall purchase and maintain at its cost Builder’s All Risk Insurance covering physical damage to the work being performed under this Subcontract in a form acceptable to the University and to the full value of the work at the time of loss or damage.
"Statement and Acknowledgment” Standard Form (SF1413) for all known Sub-Subcontractors.
A copy of the Subcontractor’s licenses and permits, and copies of all known Sub-Subcontractors licenses or permits, if needed, in performance of the Subcontract.
Issue for Construction Set (IFC) Drawings and Specifications.
Project schedule in the specified format as required by the SLAC PM
Notes:
June 14, 2024
DRAFT
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
File details come from the government source that posted it. Updated .