This is a Notice to Proceed Submittal Checklist used by SLAC National Accelerator Laboratory's Supply Chain Management division to verify that subcontractors have completed all required submissions before work commencement on a subcontract.

The checklist mandates eight key submittal requirements: (1) Performance and Payment Bonds with penal sums equal to the Fixed Firm Price Award for subcontracts valued at $35,000 and over; (2) approved insurance certificates; (3) Professional Errors and Omissions Insurance of not less than $1,000,000 per claim for subcontracts of $25,000 and over requiring design by the subcontractor; (4) Builder's All Risk Insurance covering physical damage to the full value of work for subcontracts of $50,000 and over; (5) completed Standard Form SF1413 "Statement and Acknowledgment" for all known Sub-Subcontractors; (6) copies of the subcontractor's licenses and permits and all known Sub-Subcontractor licenses or permits if needed for performance; (7) Issue for Construction Set (IFC) Drawings and Specifications; and (8) a project schedule in the format specified by the SLAC Project Manager. The document is dated June 14, 2024, and includes fields for project identification, purchase order number, subcontractor name, SLAC Project Manager, and SLAC Construction Manager.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_00_Cover_Letter.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY CHAIN MANAGEMENT

NOTICE TO PROCEED SUBMITTALS

Project:

PO#:

Subcontractor:

SLAC PM:

SLAC CM:

NOTICE TO PROCEED CHECKLIST

Performance & Payment Bonds. Penal sum of Bonds must be equal to the FFP Award for Subcontracts of $35,000 and over.

Approved insurance certificates

Subcontracts of $25,000 and over requiring design by Subcontractor: Professional Errors and Omissions Insurance in the amount not less than $1,000,000 per claim.

Subcontracts of $50,000 and over: Subcontractor shall purchase and maintain at its cost Builder’s All Risk Insurance covering physical damage to the work being performed under this Subcontract in a form acceptable to the University and to the full value of the work at the time of loss or damage.

"Statement and Acknowledgment” Standard Form (SF1413) for all known Sub-Subcontractors.

A copy of the Subcontractor’s licenses and permits, and copies of all known Sub-Subcontractors licenses or permits, if needed, in performance of the Subcontract.

Issue for Construction Set (IFC) Drawings and Specifications.

Project schedule in the specified format as required by the SLAC PM

Notes:

June 14, 2024

DRAFT

Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Text19:
Text20:
Text21:
Text22:
Text23:
Text24:

File details come from the government source that posted it. Updated .