DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf

PDF 630 KB Posted

Attached to
SLAC CUIR SP1 Master Substation Annex Building Construction
Solicitation number
SLAC_RFP_368509
Issued by

About this file

This is a Subcontract Award Form (SLAC-SCM-GEN-028) issued by SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. The subcontract is for CUIR SP1 Master Substation Annex Construction at SLAC's facility located at 2575 Sand Hill Road, Menlo Park, California 94025. The solicitation number is 368509, with the subcontract administrator identified as Quyen Weng. This is a rated order certified for national defense use and subject to Defense Priorities and Allocations System (DPAS) regulations under 15 CFR Part 700. The specific offer due date and time, subcontract number, total contract amount, and DPAS rating are to be completed in the designated fields.

The subcontract incorporates multiple sections including Supplies or Services and Prices/Costs (Section B), Specifications/Statement of Work (Section C), Delivery, Shipping, and Packing (Section D), Inspections and Acceptance (Section E), Deliveries or Performance (Section F), General Terms and Conditions (Section G), Special Terms and Conditions (Section H), Specific Subcontract Clauses (Section I), List of Attachments (Section J), Representations and Certifications (Section K), Instructions to Offerors (Section L), and Evaluation Factors for Award (Section M). Invoices should be submitted to SLAC National Accelerator Laboratory's Accounts Payable department at the Menlo Park address or via email at ap@slac.stanford.edu. The subcontract requires authorized signatures from both the seller and SLAC before execution.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_00_Cover_Letter.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION A (REV.02/19/25) SLAC-SCM-GEN-028 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

SUBCONTRACT

Section A – Subcontract Form This is a rated order certified for national defense use, and you are required to follow all the provisions of the Defense Priorities and Allocations System (DPAS) regulation (15 CFR Part 700)

► Rating:

1. Subcontract Number: 3. Type of Subcontract:

2a. Solicitation Number: 368509 2b. Offers Due By (Date): Click here to enter a date. 2c. Offers Due By (Time):

4a. Subcontract Administrator:

Quyen Weng

4b. Email Address: 4c. Telephone:

5. Issued By:

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC) 2575 Sand Hill Road Menlo Park, CA 94025

6. Submit Invoices To:

SLAC National Accelerator Laboratory Accounts Payable 2575 Sand Hill Road Menlo Park, CA 94025 or preferably ap@slac.stanford.edu

7. Name and Address of Seller:

To All Offerors

8. Project Site:

SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025

9. TABLE OF CONTENTS

(X) Sec Description (X) Sec Description

A Subcontract Award Form H Special Terms and Conditions B Supplies or Services and Prices/Costs I Specific Subcontract Clauses C Specifications/Statement of Work J List of Attachments D Delivery, Shipping, Packing K Representations and Certifications E Inspections and Acceptance L Instructions to Offerors F Deliveries or Performance M Evaluation Factors for Award G General Terms and Conditions

10. Brief description of supplies or services being acquired:

CUIR SP1 Master Substation Annex Construction

11. Total Amount of Subcontract:

See Section B for Total Amount of Subcontract

12. Negotiated Agreement. The subcontractor agrees to furnish and deliver the items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this subcontract. The rights and obligations of the parties to this subcontract shall be governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

13. Award. The Board of Trustees of the Leland Stanford, Jr.

University, SLAC National Accelerator Laboratory, accepts your offer dated on this solicitation identified in item 2 above as reflected in this subcontract, which is subject to and governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

Seller is required to sign and return a copy of this document (Check if applicable)

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC)

12b. Signature of person authorized to sign for seller: 13b. Signature of person authorized to sign:

12c. Name of Signer: 13c. Name of Signer:

12d. Title of Signer: 13d. Title of Signer:

12e. Date: 13e. Date:

DRAFT