DRAFT_B2_00_Cover_Letter.pdf

PDF 688 KB Posted

Attached to
SLAC CUIR SP1 Master Substation Annex Building Construction
Solicitation number
SLAC_RFP_368509
Issued by

About this file

This is a Request for Proposal (RFP) issued by SLAC National Accelerator Laboratory for construction services related to the Critical Utilities Infrastructure Revitalization (CUIR) Subproject 1 (SP1) – Master Substation Annex Construction. The RFP is a federally funded construction project operated by Stanford University for the U.S. Department of Energy (DOE). Offerors must submit firm-fixed price proposals by Thursday, January XX, 2027 at 5:00 PM PST, delivered electronically in searchable PDF format to the Procurement Specialist. Proposals must include signed copies of Section A and Section B (with all referenced sections), technical and price proposals for Sections L and M, and appropriate Representations and Certifications.

Award eligibility requires that offerors be registered in good standing (non-debarred) with the System for Award Management (SAM), registered in the University's procurement system at https://suppliers.slac.stanford.edu/become-slac-supplier, and have a current Safety Qualification Form approved and valid through the award date. Within thirty days of subcontract award, the awardee must provide proof of E-Verify Program enrollment or the subcontract may be subject to cancellation. A mandatory site visit is scheduled for Tuesday, November XX, 2026 at 11:00 AM PST at building 53, with specific PPE requirements (Type E hard hat, safety glasses, long sleeve shirt, long pants of untreated natural fibers or FR/arc rated, and leather shoes). Questions must be submitted using Section L Attachment B by December XX, 2026. A conflict of interest restriction prohibits awarding subcontracts to Burns & McDonnell Western Enterprises or any A&E firm that prepared a significant portion of the design. The project is subject to the Davis-Bacon Act prevailing wage requirements.

View the file

Other files

File Type Posted
DRAFT_B2_02_RFP_Section_B_(Supplies or Services and Price_Costs.pdf PDF
DRAFT_B2_03.14_FGC_Warranty_Certificate.pdf PDF
DRAFT_B2_03.11_Installation_Operation_and_Maintenance_Manuals.pdf PDF
DRAFT_B2_08.1_WD_CA20260018_17SEPT26_Mod_08.pdf PDF
DRAFT_B2_03.07_RPC-DEMO_Metal_Plates_Location_SKETCH_08.12.2026.pdf PDF
DRAFT_B2_10.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf PDF
DRAFT_B2_10.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf PDF
DRAFT_B2_03.04_CUIR_Subproject_1_Power_Outages_and_Linac_Downtime_Plan.pdf PDF
DRAFT_B2_03.08_00_Appendix_I_Technical_Data_Submittal.pdf PDF
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf PDF
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf PDF
DRAFT_B2_08.7_Final_Inspection_Report.pdf PDF
DRAFT_B2_08.4_Small_Business_Subcontracting_Plan_Form.pdf PDF
DRAFT_B2_08.8_Construction_Subcontracts_Final_Release.pdf PDF
DRAFT_B2_03.00_RFP_Section_C_(Specifications_SOW).pdf PDF
DRAFT_B2_03.02_MSS_B016_Expansion_100pct Combined_Plans.pdf PDF
DRAFT_B2_03.01_SOW_CUIR-SW-0203.pdf PDF
DRAFT_B2_08.3_SF1413.pdf PDF
DRAFT_B2_11_Section_M_Evaluation_Methodology.pdf PDF
DRAFT_B2_03.12_Certified_Test Reports_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.5_SubcontractorFormSQF.pdf PDF
DRAFT_B2_03.06_Department_of_Energy_(DOE)_Order_414.1E_Quality_Assurance.pdf PDF
DRAFT_B2_03.10_As-Built_SWGR9_SWGR8.pdf PDF
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf PDF
DRAFT_B2_03.13_Certificate_of_Conformity_2RGA031447.pdf PDF
DRAFT_B2_08.2_Injury_Illness_Prevention_Plan_Acknowledgement_Form_IIPP.pdf PDF
DRAFT_B2_06_RFP_Section_H_(Special_TsCs).pdf PDF
DRAFT_B2_05.0_RFP_Section_G_(General_TsCs).pdf PDF
DRAFT_B2_01_RFP_Section_A_(Subcontract_Form).pdf PDF
DRAFT_B2_03.03_Commissioning_Plan.pdf PDF
DRAFT_B2_10.0_Section_L_Instruction_to_Offerors.pdf PDF
DRAFT_B2_03.05_CUIR's_Quality_Requirements_for_Subcontractors.pdf PDF
DRAFT_B2_04_RFP_Section_F_(Deliveries Performance).pdf PDF
DRAFT_B2_03.09_01_Packaging_Procedure_1VAM-T0004-020086_MV_Switchgear_Shipping_Preparation-2.pdf PDF
DRAFT_B2_07_RFP_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_RFP_Section_K_(Rep and Certs).pdf PDF
DRAFT_B2_08.0_RFP_Section_J_(List of Attachments).pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY CHAIN MANAGEMENT

2575 Sand Hill Road, MS 01

Menlo Park, CA 94025 Email: quyen@SLAC.Stanford.edu

October 19, 2026

Subject: Request for Proposal #368509 for CUIR SP1 Master Substation Annex Construction hereinafter (the “RFP”)

To The Offeror, SLAC National Accelerator Laboratory is pleased to offer Request for Proposal #368509 for the Critical Utilities Infrastructure Revitalization (CUIR) Subproject 1 (SP1) – Master Substation Annex Construction for your consideration. The RFP package includes the model subcontract and all terms and conditions of procurement.

You are invited to submit a firm-fixed price proposal covering the requirements of the attached Statement of Work in accordance with the proposal requirements, terms and conditions, and other applicable documents, all of which are provided herewith and identified herein.

PROPOSAL: The due date for the proposal is Thursday, January XX, 2027 by 5:00PM PST, as noted in RFP Section A. Proposals are to be sent electronically by email in a searchable PDF file format, as directed by RFP Section L. Proposals must include a signed copy of Section A and Section B (INCLUDING REFERENCED SECTIONS IN SECTION A and TECHNICAL AND PRICE PROPOSALS FOR SECTIONS L AND M), and the appropriate Representations and Certifications (See Section K and Section L). Proposals shall be addressed to the Procurement Specialist.

Proposals shall be addressed to the Procurement Specialist.

SITE VISIT: A site visit will be conducted for this RFP on Tuesday, November XX, 2026 at 11:00AM PST. Site visit attendance is strongly recommended. Please provide a list of names and email addresses of attendees by Friday, November XX, 2026. Attendees will meet in the lobby of building 53. The following PPE is required: Hard hat type E rating, safety glasses, long sleeve shirt and long pants of untreated natural fibers (non-melting) or FR / arc rated, and leather shoes. No vest unless it is FR rated.

RFI SUBMITTALS: Questions and inquiries pertaining to the RFP are to be directed to the attention of the undersigned and will be accepted for response until December XX, 2026.

Please use Section L Attachment B “SLAC Question and Answer - RFI Log” to submit all questions and inquiries. Questions and responses by SLAC will be distributed to all prospective suppliers.

DRAFT

mailto:quyen@SLAC.Stanford.edu

PLEASE NOTE: That SLAC National Accelerator Laboratory is operated by Stanford University for the U.S. Department of Energy (DOE) making this a federally funded construction project. As such, in accordance with the Davis-Bacon Act, the offeror is being made aware of, in addition to other required labor postings, the DOE WH Publication 1321, which can be found on the following website: https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/fedprojc.pdf

CONFLICT OF INTEREST: To avoid a conflict of interest, subcontracts for construction are not awarded to an A&E firm or an affiliate that prepared a significant portion of the design, and the construction subcontractor or an affiliate cannot be employed to inspect the subcontractor’s work. The following companies cannot be partnered with for this project: Burns & McDonnell Western Enterprises.

AWARD ELIGIBILITY: For Offeror to be eligible for a subcontract award with the University, Offeror shall:

• Be registered in good standing (non-debarred) with the System for Award Management (SAM), the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. There is NO fee to register for this site. Entities may register at no cost directly at the SAM website: SAM.GOV.

• Be registered in the University’s procurement system of record:

https://suppliers.slac.stanford.edu/become-slac-supplier.

• Have a current Safety Qualification Form approved and valid through the award date of this RFP.

E-VERIFY: This solicitation falls under the reporting requirements of E-Verify. Within thirty (30) days of award of a Subcontract the awardee must provide proof of enrollment in the E-Verify Program. If proof of enrollment is not received within the specified timeframe the subcontract may be subject to cancellation. If you are unfamiliar with E-Verify the following link will provide you with detailed information. www.dhs.gov/E-Verify.

All communications regarding this RFP are to be directed to the undersigned procurement representative. No other employee or contractor of SLAC is to be contacted regarding any aspect of this RFP without the authorization of the undersigned.

Best Regards, Quyen Weng Sr. Subcontract Administrator – Construction and Projects

DRAFT

https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/fedprojc.pdf https://suppliers.slac.stanford.edu/become-slac-supplier https://www-group.slac.stanford.edu/esh/eshmanual/references/subcontractorFormSQF.pdf http://www.dhs.gov/E-Verify

File details come from the government source that posted it. Updated .