This Task Assignment (TA) is a contract document between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT), a private environmental consulting firm. The TA is entered pursuant to Contract Number HW682 and assigns work related to environmental monitoring and remediation services at the Jonfor Cleaners facility located in Jacksonville, Duval County, Florida (Project Number ERIC_4542).
The scope of work authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) activities at the Jonfor Cleaners site, including collection of groundwater samples from 18 monitoring wells and 4 injection wells, preparation of an updated Health and Safety Plan (HASP), site access agreement management, investigative derived waste (IDW) management, NAM report preparation, and PFAS monitoring. The contract is structured as a Fixed Unit Rate agreement with a total TA value of $16,208.17, comprised of four subtasks: Project Management ($1,324.82), Annual NAM Sampling and Report ($13,375.59), PFAS Screening ($955.37), and IDW Transport and Disposal ($552.39). Deliverables are due on specific dates with June 5, 2026, and August 28, 2026, as key completion dates, and the overall task completion date is October 2, 2026. The work involves 84 total labor hours and includes subcontractor costs for IDW disposal, with Erwin Remediation selected at $195.00 per drum. Payment terms are Net 30 days following FDEP approval of each deliverable component.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC008E Completion October 2, 2026
This Task Assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) at Jonfor Cleaners in Jacksonville, FL. ECT will collect groundwater samples from 18 monitoring wells and 4 injection wells. ECT will also update the HASP and site access agreement, manage IDW, prepare a NAM Report, and conduct PFAS monitoring.
Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Dirk Mammen Contractor 245-563-2410
ERIC_4542
Jacksonville, Duval County, Florida
Jonfor Cleaners
Contractor Contractor
✔ $ 16,208.17
$ 16,208.17
Scope of Work
Environmental Consulting and Technology, Inc. (ECT Contractor Dirk Mammen
Managing Director
05/11/26
Digitally signed by Dirk Mammen DN: CN=Dirk Mammen, E=dmammen@ectinc.com Reason: I am the author of this document Location:
Date: 2026.05.11 15:37:12-04'00' Foxit PDF Editor Version: 12.0.0
Dirk Mammen
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.05.11 10:28:29 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual NAM Report (Subtask 2) 06/05/2026
PFAS Screening (Subtask 3) 06/05/2026
Project Management & Waste Manifest (Subtask 1 & 4) 08/28/2026
DEP Approval of Annual NAM Report (Subtask 2) $ 13,375.59
DEP Approval of PFAS Screening (Subtask 3) $ 955.37
DEP Approval of Project Management & Waste Manifest (Subtask 1 & 4) $ 1,877.21
$ 16,208.17
HW682
DC008E
TO:
FROM:
SUBJECT:
DATE:
HW682 Contract Negotiation File Jonfor Cleaners Jacksonville, Duval County
ERIC_4542
Karlee Fowler, Project Manager Negotiation Summary HW682 DC008
, 20
This Task Assignment
Subtask 1: Project Management Subtask 2:
The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment with labor hours. Task end date , 2026.
FDEP COST ESTIMATEContractor: Environmental Consulting & Technology, Inc.
Date: 9-Apr-26
Task #: SubTask 1 Project Management
Site: Jonfor Cleaners SubTask 2 ANAM Sampling & Report
Activity/Phase: SubTask 3 PFAS Screening
Project Manager: Dirk Mammen SubTask 4 IDW T&D
SubTask 5
TTotals 1 2 3 4 Labor Rate Category
$96.21 Project Manager 4.6 4.6 $96.21 Senior Principal Scientist (DM) 4 4 0 0 $78.26 Principal Scientist (HH) 0 0 0 0 $53.96 Senior Engineer / Scientist (MH) 0 0 0 0 $56.32 Senior Engineer / Scientist (DP) 23 19 2 2 $55.16 Senior Engineer / Scientist (RP) 0 0 0 0 $44.40 Staff Engineer / Scientist (LL) 0 0 0 0 $36.85 Sr. Associate Engineer / Scientist (KM) 0 0 0 0 $29.30 GIS Analyst / Graphics (JV) 9 8 1 0 $25.48 Associate Engineer / Scientist (JP) 0 0 0 0 $31.88 Technician (DF) 21 18 2.5 0 $24.38 Technician (MW) 22.5 20 2.5 0 $35.90 Administrative (BJ) 7 6 1 0
Total Hours 90.60 4.6 75 9 2
Direct Labor $3,838.94 $441.65 $2,966.16 $318.49 $112.64
Overhead 125.30% $4,810.20 $553.39 $3,716.60 $399.07 $141.14 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $1,819.65 $209.34 $1,405.96 $150.96 $53.39 Total Labor $10,468.79 $1,204.38 $8,088.72 $868.52 $307.17
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $594.00 $594.00 $0.00 $0.00 Total Travel $1,074.00 $1,074.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) $0.00 $0.00 $0.00 $0.00
Erwin Remediation $195.00 $0.00 $0.00 $195.00 Subcontractor Subtotal $195.00 $0.00 $0.00 $195.00 Handling Fee $19.50 $0.00 $0.00 $19.50 Total Subcontractor Cost $214.50 $0.00 $0.00 $214.50
Laboratory Analytical Costs $2,530.00 $2,530.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 $0.00 FDEP PFAS Analytical Cost $0.00 $0.00 $0.00 $0.00 FDEP Shipping $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,600.00 $2,600.00 $0.00 $0.00
Field Expenses Expendables $80.00 $80.00 $0.00 $0.00 Equipment (Shallow Groundwater Sampling Kit) $580.00 $580.00 $0.00 $0.00 Equipment (Metal Detector) $40.00 $40.00 $0.00 $0.00 Drum (IDW related) $65.00 $65.00 $0.00 $0.00 Ice $39.00 $39.00 $0.00 $0.00 Total Field Expenses $804.00 $804.00 $0.00 $0.00
Subtotal $15,161.29 $1,204.38 $12,566.72 $868.52 $521.67 Completion Fee $1,046.88 $120.44 $808.87 $86.85 $30.72
Total Estimated Cost $16,208.17 $1,324.82 $13,375.59 $955.37 $552.39
ANAM Sampling - Revision 2
REV: 08/22 PRAC ECT Page 1
FDEP COST ESTIMATE
SITE : Jonfor Cleaners SUBTASK: 2 (ANAM Sampling)
DATE: 4/9/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Mammen Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 4 Total Hours 4
D. Phillips Senior Scientist Verification of property ownership, notify RPO & confirm/obtain site access 2 Prepare updated Health & Safety Plan 1 Prepare Draft Annual NAM Report 16
Total Hours 19 J. Von Borstel GIS Analyst Recreate Figures 8
Total Hours 8 M. Weiss Technician Prep for fieldwork and obtain a FDOT 55-gallon drum 2
Roundtrip mobilization from Orlando to Jacksonville 5 Open and collect DTW at 20 wells and 4 injection wells. 2 Groundwater sampling 18 wells and 4 injection wells for VOHs 11
Total Hours 20 D. Flake Technician Roundtrip mobilization from Gainesville to Jacksonville 5
Open and collect DTW at 20 wells and 4 injection wells. 2 Groundwater sampling 18 wells and 4 injection wells for VOHs 11
Total Hours 18 B. Jarvis Administrative Tabulate data for deliverable and report production 6
Total Hours 6
TOTAL LABOR 75
VEHICLE TYPE RATE UNIT USAGE
Rental Truck (MW) $120.00 day 2 $240.00 Rental Truck (DF) $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USAGE
Per Diem M. Wiss $36.00 day 2 $72.00 D. Flake $36.00 day 2 $72.00
Hotel M. Wiss $225.00 day 1 $225.00 D. Flake $225.00 day 1 $225.00
TOTAL PER DIEM $594.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USAGE
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 for VOHs (22 wells and 1 drum) $110.00 23 0 $2,530.00 Shipping Samples $70.00 0 1 $70.00 FDEP Central Lab PFAS Screening (5 wells and 1 drum) $0.00 6 0 $0.00 FDEP PFAS Shipping $0.00 0 1 $0.00
TOTAL LAB $2,600.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Expendables $40.00 Event 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 Drum (IDW related) $65.00 each 1 $65.00 Ice $6.50 each 6 $39.00
TOTAL EQUIPMENT $804.00
REV: 08/22 PRAC ECT Page 2
SUBTASK: 3 (PFAS Screening)
DATE: 4/9/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE Jonfor Cleaners WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Prepare PFAS email deliverable, lab report, field notes, table & figure. 2 Total Hours 2
J. Von Borstel GIS Analyst Prepare PFAS figure 1 Total Hours 1
M. Weiss Technician Groundwater sampling 2 wells and 1 IDW sample for PFAS 2.5 Total Hours 2.5
D. Flake Technician Groundwater sampling 2 wells and 1 IDW sample for PFAS 2.5 Total Hours 2.5
B. Jarvis Administrative Update tables 1 Total Hours 1
TOTAL LABOR 9
VEHICLE TYPE RATE UNIT USAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
$0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
REV: 08/22 PRAC ECT Page 3
SUBTASK: 4 (IDW T&D)
DATE: 4/9/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE Jonfor Cleaners WORK DESCRIPTION HOURS
D. Phillips Senior Scientist IDW Hazardous classification and scheduling T&D. 2
Total Hours 2 J. Von Borstel GIS Analyst
Total Hours 0 B. Jarvis Administrative
Total Hours 0
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
$0.00 day TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
Erwin Remediation IDW T&D $195.00 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00
18 TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
$0.00
TOTAL EQUIPMENT $0.00
REV: 08/22 PRAC ECT Page 4 ectinc.com
SUBCONTRACTOR QUOTES – IDW DISPOSAL
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Daniel Phillips Environmental Consulting & Technology, Inc.
3751 Maguire Boulevard, Suite 234 Orlando, Florida 32803
November 25, 2025
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Phillips:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud, and water located in the State of Florida is listed below.
Non-Hazardous Drums (PFAS/PFOS Impacted):
Description Rate Unit T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum Profiling Fee (charged once per site) $ 350.00 Per Site False Mobilization (No drum found) $ 85.00 Per Trip
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Trip T&D - Non-Haz Soil $ 110.00 Per Drum T&D – Non-Haz Mud or Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
September 25, 2024 Environmental Consulting & Technology, Inc.
3751 Maguire Blvd. Suite 234 Orlando, FL 32803 Daniel Phillips
Subject: Waste Disposal & Transportation Quotation #2024-
Dear Daniel Phillips, On behalf of Perma-Fix Environmental Services, Inc. (Perma-Fix of Florida), I would like to thank you for the opportunity to provide you with this estimate outlining the costs associated with the transportation and disposal project from your client. Pricing is contingent upon review and plant approval of the signed Perma- -Fix will provide documentation as needed to process the waste.
Disposal Solids Liquids Non-haz drums $100 $100
Haz/RCRA (VOCs) drums $350 $350 PFAS drums $350 $350
PFAS + Haz/RCRA drums $400 $400
Transportation* Quantity Unit Price Est. Total
Stop Fee 1 $75 $75
Transportation, no fuel surcharge 15 $40/drum $600
Other Fees Quantity Unit Price Est. Total
Administrative/Insurance Fee TBD 25% TBD
Fee (annual) N/A $30 N/A e-Manifest Filing Fee (applies to haz only) TBD $35 TBD
Included in Scope of Work:
Terms and conditions in Perma-Fix Waste Transportation & Disposal Agreement, Rev. 1 dated October 2020, apply upon acceptance/signature of this quote.
Demurrage:One hour free loading. $125.00 per hour thereafter.
No-Load Charge:Stop + LTL Fees (includes cancellation with less than 48 hours’ notice).
Current pricing is subject to change after 30 days.
Minimum Transportation Fee is $355.00 for areas normally serviced by PFF in Florida.
Profiles are subject to review & approval.
We look forward to being of service to you. If you have any questions or if I can be of further assistance, please call me at (770) 524-2014.
Sincerely, Eunice Hong
Eunice Hong
Technical Sales Manager
Email: ehong@perma-
Mobile: (770) 524-2014
Quote Approval:
Signature:
Name, Printed:
Date:
E s t i m a t e 2 4 F L J J 0 2 0 0 f o r E n v i r o n m e n t a l C o n s u l t i n g & T e c h n o l o g y
T & D d r u m s f r o m v a r i o u s s i t e s
L a b o r M e n D a y s H r s / D a y T o t a l B i l l R a t e B i l l S u b
T o t a l
O p e r a t o r 1 1 8 8 h r s $ 9 0 . 0 0 $ 7 2 0 . 0 0
O p e r a t o r - O v e r t i m e 1 1 0 0 h r s $ 1 1 0 . 0 0 $ 0 . 0 0
S u b t o t a l $ 7 2 0 . 0 0
E q u i p m e n t Q t y U n i t s B i l l R a t e B i l l S u b
T o t a l
S t a k e b e d w / l i f t g a t e 1 D a y $ 3 5 0 . 0 0 $ 3 5 0 . 0 0
S u b t o t a l $ 3 5 0 . 0 0
D i s p o s a l Q t y U n i t s B i l l R a t e B i l l S u b
T o t a l d r u m d i s p o s a l 1 e a $ 1 2 5 . 0 0 $ 1 2 5 . 0 0
S u b t o t a l $ 1 2 5 . 0 0
E s t i m a t e d G r a n d T o t a l $ 1 , 1 9 5 . 0 0
1715 North Westshore Blvd, Ste 175, Tampa, FL 33607 ectinc.com 813.289.9338
April 9, 2026 ECT No. P25RA-6991
Ms. Karlee Fowler Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Proposal for Jonfor Cleaners – Revision 2 Annual Natural Attenuation Monitoring Report 11700-1 San Jose Boulevard Jacksonville, Florida 32223 Facility ID: ERIC_4542 Contract No. HW682
Dear Ms. Fowler:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to perform an annual groundwater sampling event and to prepare the Annual Natural Attenuation Monitoring (NAM) Report for the Jonfor Cleaners in Jacksonville, Florida.
Historical data shows that groundwater samples collected from five monitoring wells contained PFOA+PFOS at concentrations greater than 70 ng/L. Therefore, ECT is including analysis of groundwater samples for the PFAS constituents as Subtask 3.
Subtask 1 Project Management
This Subtask consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and a completion fee.
The project management cost is calculated in the Level of Effort Cost Estimate Form (LOECEF).
Subtask 2 Scope of Work
ECT proposes to conduct the tasks necessary to complete the NAM groundwater sampling event and document them in an Annual NAM Report. The monitoring program consists of measuring depth-to-water (DTW) and collecting groundwater samples at 18 monitoring wells and four injection wells.
Groundwater samples will be collected from monitoring wells IW001R, IW002, IW003R, IW004, IW006, IW008, IW009R, IW010R, IW011, IW012, IW015, IW016, IW017, IW018, DW001, DW002R, DW003 and DW004; and injection wells I004, I006, I009, and I012. The four deep wells are added for this event, as DW004 has only been sampled once in 2014; DW001 was last sampled in 2019; and DW002R and DW003 were last sampled in 2021. All groundwater samples will be analyzed for the volatile organic halogens (VOHs) by United States Environmental Protection Agency (USEPA) Method 8260.
ECT is requesting time to prepare an updated Health and Safety Plan (HASP). In addition, time is requested to confirm/obtain site access. Should ECT have difficulty obtaining site access, additional time may be requested via task assignment change order (TACO).
Ms. Karlee Fowler FDEP Jonfor Cleaners ERIC_4542 – Annual NAM Proposal – Revision 2 April 9, 2026 ectinc.com
Once the groundwater sampling field data and analytical results have been compiled, ECT will prepare and submit the Annual NAM Report to the FDEP Project Manager. A summary of activities to be performed under Subtask 2 is provided in Table 1:
Table 1. Subtask 2 Activities Summary Employee/Resourc e Activity Time
Sr. Principal Scientist
Develop conclusions and recommendations for the Groundwater Monitoring Report 4 hours
Sr. Scientist Notify RPO of field activities / confirm/obtain site access 2 hours Sr. Scientist HASP 1 hour Sr. Scientist Prepare draft Groundwater Monitoring Report 16 hours GIS Analyst Update and Create figures 8 hours Technician 1 Prep for field work and obtain an IDW Drum 2 hours Technician 1 + 2 Round Trip Mob Orlando/Gainesville to Jacksonville 5 hours Technician 1 + 2 Open 24 wells and Measure DTW 2 hours Technician 1 + 2 Groundwater Sampling (18 wells + 4 injection wells for VOHs 11 hours Technician 1 + 2 Truck for Groundwater Sampling 4 days Technician 1 + 2 Per Diem 4 days Technician 1 + 2 Hotel 2 days Administrative Update tables & draft report 6 hours
Subtask 3 PFAS Screening
ECT proposes to sample MW001R, MW008, IW006, IW008, IW017 and the IDW drum for PFAS analyses.
The samples for PFAS analyses will be collected during the Subtask 2 groundwater sampling event and ECT will submit those samples to the Florida Department of Environmental Protection (FDEP) Central Laboratory. Once the analytical results are received, ECT will provide the PFAS analytical report, PFAS figure, PFAS table, and field notes in an email deliverable. A summary of activities in Subtask 3 is included in Table 2:
Table 2. Subtask 3 PFAS Activities Summary Employee/Resource Activity Time Sr. Scientist Prepare PFAS deliverable 2 hours GIS Analyst Update PFAS Figures 1 hour Technician 1 + 2 Groundwater Sampling (2 wells and the IDW drum for PFAS) 2.5 hours Administrative Update PFAS tables 1 hour
April 9, 2026 ectinc.com
Subtask 4 IDW Transport & Disposal
The scope of work for Subtask 4 consists of the labor to verify that the investigative derived waste (IDW) has been classified correctly. All well purge water from the groundwater sampling event will be contained in a 55-gallon drum and temporarily stored on-site until properly classified. Once the analytical results are received, the drum containing well purge water will be scheduled for disposal.
Under this task, the IDW waste manifest will be prepared and includes the cost for proper disposal of one drum of PFAS-impacted purge water from the groundwater sampling event. ECT proposes using the manifest and associated documentation as the deliverable for Subtask 3. A summary of activities in Subtask 4 is included in Table 3:
Table 3. Subtask 4 Activities Summary Employee/Resource Activity Time Sr. Scientist Verify IDW hazard classification, prepare manifest & submit deliverable/documentation 2 hours
Quotes were obtained for disposal of the IDW transport and disposal (T&D). The quotes are summarized below and are provided as an attachment to this proposal. Based on these quotes, Erwin Remediation will be subcontracted to dispose of IDW generated at this site.
Subcontractor Cost Erwin Remediation $195.00 Perma-Fix $887.50 Moran Environmental $1,509.20
Cost and Deliverable Schedule
An LOECEF is attached, providing a cost summary for the proposed scope of work. A summary of the deliverable due dates and the invoice schedule is provided in Table 4:
Table 4. Deliverable and Invoice Schedule:
Subtask Deliverable Deliverable Date Invoice Amount
2 Annual NAM Report 15 March 2026 $13,375.59 3 PFAS Screening 15 March 2026 $955.37 4 Waste Manifest 15 April 2026 $552.39 1 Project Management Final Invoicing 31 May 2026 $1,324.82
Total $16,208.17
April 9, 2026 ectinc.com
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Daniel S. Phillips, P.G. Dirk Mammen, P.G.
Senior Scientist Principal Scientist
Attachments
File details come from the government source that posted it. Updated .