This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW682. The document authorizes Environmental Consulting and Technology, Inc. (ECT) to conduct groundwater sampling activities at the Jonfor Cleaners site located at 11700-1 San Jose Boulevard, Jacksonville, Duval County, Florida (Project ERIC_4542). The task assignment was executed on November 16, 2022, with a completion date of April 29, 2023. Kelly Crain serves as the FDEP Project Manager, while Mark A. Culbreth represents ECT as the contractor's project manager.
The scope of work requires ECT to conduct annual groundwater monitoring and provide a Natural Attenuation Monitoring (NAM) report. Specifically, ECT will collect samples from 14 monitoring wells and 4 injection wells for volatile organic hydrocarbon (VOH) analysis and deliver a comprehensive Groundwater Monitoring Report with conclusions and recommendations. The work is structured on a fixed unit rate basis with a total task assignment value of $9,719.58. This amount reflects a reduction from ECT's original proposal of $42,358.10 after project scope was revised to include only a single groundwater sampling event prior to soil vapor extraction (SVE) verification testing. Deliverables include the Annual NAM Report due February 23, 2023 ($9,046.38), and Project Management invoicing due April 29, 2023 ($673.20). The contractor must ensure a current site access agreement is in place before initiating field activities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW682
DC008A Completion April 29, 2023
This Task Assignment authorizes ECT to to conduct annual groundwater sampling activities at the Jonfor Cleaners site located in Jacksonville, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on November 3, 2022.
Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4542
11700-1 San Jose Blvd., Jacksonville, Duval County, FL
Jonfor Cleaners
Contractor Contractor
✔ $ 9,719.58
$ 9,719.58
Select One
Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth
Contract Manager Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2022.11.16 13:21:48-05'00' Foxit PhantomPDF Version: 10.1.6
Mark Culbreth
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.11.16 12:27:42 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual NAM Report and PM (Subtasks 1 and 2) 02/23/2023
Approval of Annual NAM Report and PM (Subtasks 1 and 2) $ 9,719.58
$ 9,719.58
HW682
DC008A
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
Memorandum
TO: HW682 Contract File Jonfor Cleaners
ERIC_4542
FROM: Kelly Crain, Project Manager SUBJECT: Negotiation Summary Task Assignment DC-008A DATE: November 16, 2022
This Task Assignment authorizes ECT to conduct groundwater sampling in accordance with the Scope of Work dated November 3, 2022. ECT will collect samples from (14) monitor wells and
(4) injection wells for VOH analysis including: IW001R, IW002, IW003R, IW004, IW006, IW008, IW009R, IW010R, IW011, IW012, IW015, IW016, IW017 and IW018; and injection wells I004, I006, I009, and I012. ECT will provide a Groundwater Monitoring Report summarizing all of the results and include conclusions and recommendations for future site activities.
ECT will ensure that the Department has a current site access agreement in place prior to initiating field activities.
ECT’s original proposal including quarterly sampling and SVE verification testing totaling $42,358.10. After discussions with the Department’s Engineer and project manager, it was determined that a groundwater sampling event should occur prior to SVE verification testing.
After revisions to the scope of work, the final costs associated with this Task Assignment are $9,719.58. ECT may invoice according to the attached schedule.
FDEP COST ESTI MATEContractor: Environmental Consulting & Technology, Inc.
Date: 3-Nov-22
Task #: SubTask 1 Project Management
Site: Jonfor Cleaners SubTask 2 Annual NAM Report
Activity/Phase: SubTask 3
Project Manager: Mark Culbreth SubTask 4
SubTask 5
TTotals 1 2 3 Labor Rate Category
$80.12 Project Manager 2.80 2.80 $80.12 Senior Principal Scientist (MC) 2 2 0 $52.89 Senior Engineer / Scientist (GS) 12 12.0 0 $26.54 GIS Analyst / Graphics (JV) 6 6 0 $22.44 Technician (BC) 26 26.0 0.0 $31.45 Administrative (BJ) 6 6 0
Total Hours 54.80 2.80 52.0 0.0
Direct Labor $1,950.72 $224.42 $1,726.30 $0.00
Overhead 125.30% $2,444.25 $281.20 $2,163.05 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $924.65 $106.38 $818.27 $0.00 Total Labor $5,319.62 $612.00 $4,707.62 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 Per diem + Hotel $378.00 $378.00 $0.00 Total Travel $738.00 $738.00 $0.00
Subcontractor (Equipment Procurement) Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Erwin Remediation IDW T&D $470.00 $470.00 $0.00 Subcontractor Subtotal $470.00 $470.00 $0.00 Handling Fee $47.00 $47.00 $0.00 Total Subcontractor Cost $517.00 $517.00 $0.00
Laboratory Analytical Costs $1,387.00 $1,387.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 Total Laboratory $1,457.00 $1,457.00 $0.00
Field Expenses Expendables $120.00 $120.00 $0.00 Equipment (Shallow Groundwater Sampling Ki $870.00 $870.00 $0.00 Equipment (Metal Detector) $40.00 $40.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 Equipment (Ice) $26.00 $26.00 $0.00 Total Field Expenses $1,156.00 $1,156.00 $0.00
Subtotal $9,187.62 $612.00 $8,575.62 $0.00 Completion Fee $531.96 $61.20 $470.76 $0.00
Total Estimated Cost $9,719.58 $673.20 $9,046.38 $0.00
Quarterly Groundwater Sampling & SVE Verific
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jonfor Cleaners SUBTASK:2 (Annual NAM Report)
DATE: 11/3/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Quarterly NAM Report 2 Total hour 2
G. Sattler Senior Engineer Verification of property ownership, notify RPO of field activities 1 Prepare Health and Safety Plan 2 Characterization and waste profile for transportation and disposal of purge water IDW 1 Prepare draft Quarterly NAM report 8
Total hour 12 J. Von Borstel GIS Analyst Recreate figures 6
Total hour 6 B. Carrick Technician Prep for field work and acquire a DOT 55 gallon Drum 1
Round-Trip Mobilize to Jacksonville from Orlando for the groundwater sampling even 5 Open Well and collect DTW at 18 wells 2 Quarterly groundwater sampling 18 wells 18
Total hour 26 B. Jarvis Administrative Recreate tables and report production 6
Total hour 6
TOTAL LABOR 52
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem B. Carrick $36.00 day 3 $108.00
Hotel B. Carrick $135.00 day 2 $270.00
TOTAL PER DIEM $378.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT(s)
Erwin Remediation PFAS IDW T&D $470.00 1 $470.00
TOTAL $470.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIT(S)
USEPA Method 8260 for VOHs $73.00 18 $1,314.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00 Sample Shipping $70.00 1 $70.00
TOTAL LAB $1,457.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 4 $26.00
TOTAL EQUIPMENT $1,156.00
FINAL --7/24/96
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To:
Mr. Gregory Sattler Environmental Consulting & Technology, Inc.
3751 Maguire Blvd, Suite 234 Orlando, FL 32803
October 18, 2022
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous PFOS/PFAS soil, mud and water is listed below.
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Jonathan Erwin Erwin Remediation, Inc.
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
Email: ErwinRemediation@Gmail.com Office: (850) 292-6511
File details come from the government source that posted it. Updated .