About this file

This document package consists of a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) for environmental site assessment services at the Fashion Square Cleaners facility located in Tampa, Hillsborough County, Florida. The TA was initially executed on December 15, 2022, with ECT's project manager identified as Mark A. Culbreth. The TACO was signed on July 13, 2023, and serves as the primary amendment document adjusting the scope, cost, and schedule of the original task assignment.

The contract authorizes ECT to conduct a comprehensive site assessment including ground-penetrating radar (GPR) surveys, direct push technology (DPT) soil and groundwater sampling, monitoring well installation and sampling, mobile analytical geochemical surveying (MAGS), waste disposal management, professional land surveying, and a final site assessment report. The original task assignment value was $69,978.65, and the TACO increased the total cost to $76,743.52, representing an increase of $6,764.87. This increase resulted from switching laboratory analysis from EPA Method 8260 VOCs to full suite 8260 analyses in Subtasks 3 and 4, adding Encore samplers to Subtask 3, and correcting previously unaccounted labor hours in Subtask 8. The task completion date was extended from July 29, 2023, to November 30, 2023, allowing 124 additional days for project completion. Total project labor was established at 223 hours across multiple staff categories with detailed invoice milestones tied to FDEP approval of specific deliverables.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO3.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26AC02.pdf PDF
CN-370000-HW682-DC26ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC005B 01 HW682

This Task Assignment Change Order reconciles WCD #1 and WCD #2 which authorizes additional laboratory costs in Subtasks 3 & 4, and corrects labor hours in Subtask 8.

Ginger Shirah 850-245-8899 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4742

Fashion Square Cleaners

✔ $ 76,743.52 $ 69,978.65

$ 76,743.52 $ 69,978.65 Completion

✔ Completion 07/29/2023 11/30/2023 124

✔ 1 1 1

Contractor

Mark A. Culbreth

Principal Hydrogeologist

July 13, 2023

Digitally signed by Mark Culbreth Date: 2023.07.13 15:10:38-04'00'Mark Culbreth

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.07.13 10:48:16 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC005B

$ 76,743.52

Email deliverable for GPR and Field Notes (Subtask 2)

Email deliverable DPT and Soil Sampling Field Notes (Subtask 3)

Email deliverable well installation and sampling Field Notes (Subtask 4)

Email deliverable for MAGS Field Notes (Subtask 5)

IDW Manifests and PLS (Subtask 6 and 7)

Site Assessment Report and PM (Subtask 8 and 1)

FDEP Approval of Email deliverable for GPR and Field Notes (Subtask 2)

FDEP Approval of Email deliverable well installation and sampling Field Notes (Subtask 4)

FDEP Approval of Email deliverable for MAGS Field Notes (Subtask 5)

FDEP Approval of SAR and PM (Subtask 8 and 1)

FDEP Approval of PLS and IDW Manifest (Subtask 6 and 7)

FDEP Approval of Email deliverable DPT and Soil Sampling Field Notes (Subtask 3)

02/02/2023

03/02/2023

04/01/2023

08/01/2023

10/02/2023

09/01/2023

$ 37,649.72

$ 2,582.20

$ 17,792.40

$ 5,399.56

$ 4,843.83

$ 8,475.81

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

Date:

To: HW682 Contract Negotiation File Fashion Square Cleaners Tampa, Hillsborough County

ERIC_4742

Ginger Shirah, Project Manager July 11, 2023

Subject: Negotiation Summary

HW682 DC005B-01

This Task Assignment Change Order reconciles WCD #1 and WCD #2 which authorized additional laboratory costs which account for switching lab analysis of EPA Method 8260 to the full suite analyses in Subtasks 3 & 4, and adds Encore Samplers to Subtask 3. The WCD also authorized labor hours that were previously not accounted for in Subtask 8. The labor hours were displayed correctly on the Original Cost Estimate Form, however they were not correctly calculated within the Formula Sheet, which produced incorrect Total Labor Costs. This TACO will also extend the Task Completion Date to November 1, 2023.

The changes above result in an overall increase of $6,764.87. The FDEP project manager agrees to the scope of work and final cost associated with this Task Assignment, which is $76,743.52 with 223 total labor hours.

FDEP COST ESTIMATE

Contractor: Environmental Consulting & Technology, Inc.

Date: 6/20/2023

Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Manageme

Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Lan

Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation

Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9

SubTask 5 MAGS SubTask 10

Totals 1 2 3 4 5 6 7 8 Labor Rate Category

$80.12 Project Manager 12.4 12.4 $80.12 Senior Principal Scientist (MC) 2 0 0 0 0 0 0 2 $52.89 Senior Engineer / Scientist (GS) 10 2 0 0 6 0 0 2 $55.00 Senior Engineer / Scientist (DP) 30 7 10 0 0 2 1 10 $34.02 Sr. Associate Engineer / Scientist (KM) 122 0 58 34.5 9.5 0 0 20 $26.54 GIS Analyst / Graphics (JV) 8 0 0 0 0 0 0 8 $21.54 Associate Engineer / Scientist (JP) 28 0 5 7.5 9.5 0 5.5 0 $31.45 Administrative (BJ) 11 0 4 2 1 0 0 4

Total Hours 223 12.4 9.0 77.0 44 26.0 2 6.5 46

Direct Labor $8,614.20 $991.01 $490.78 $2,739.65 $1,398.14 $876.61 $110.00 $173.47 $1,834.54

Overhead 125.30% $10,793.60 $1,241.74 $614.95 $3,432.78 $1,751.87 $1,098.39 $137.83 $217.36 $2,298.68 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $4,083.12 $469.74 $232.63 $1,298.59 $662.72 $415.51 $52.14 $82.22 $869.57 Total Labor $23,490.92 $2,702.49 $1,338.36 $7,471.02 $3,812.73 $2,390.51 $299.97 $473.05 $5,002.79

Travel Vehicle Rental $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00 Total Travel $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Groundwater Protection $24,055.00 $0.00 $14,251.00 $9,804.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Erwin Remediation $3,485.00 $0.00 $0.00 $0.00 $0.00 $990.00 $2,495.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GeoView $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $28,440.00 $900.00 $14,251.00 $9,804.00 $0.00 $990.00 $2,495.00 $0.00 Handling Fee $2,844.00 $90.00 $1,425.10 $980.40 $0.00 $99.00 $249.50 $0.00 Total Subcontractor Cost $31,284.00 $990.00 $15,676.10 $10,784.40 $0.00 $1,089.00 $2,744.50 $0.00

Laboratory Analytical Costs $14,480.00 $0.00 $11,654.00 $826.00 $2,000.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $110.00 $0.00 $0.00 $0.00 $110.00 $0.00 $0.00 $0.00 Sample Shipping $350.00 $0.00 $280.00 $70.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $14,940.00 $0.00 $11,934.00 $896.00 $2,110.00 $0.00 $0.00 $0.00

Field Expenses Expendables $480.00 $40.00 $200.00 $160.00 $40.00 $0.00 $40.00 $0.00 Soil Assessment Kit $0.00 $700.00 $975.00 $0.00 $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 Ice $84.50 $0.00 $71.50 $13.00 $0.00 $0.00 $0.00 $0.00 MAGS Investigation Kit $500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $0.00 $0.00 Total Field Expenses $3,319.50 $40.00 $1,261.50 $1,438.00 $540.00 $0.00 $40.00 $0.00

Subtotal $74,394.42 $2,702.49 $2,448.36 $36,902.62 $17,411.13 $5,160.51 $1,388.97 $3,377.55 $5,002.79 Completion Fee $2,349.10 $270.25 $133.84 $747.10 $381.27 $239.05 $30.00 $47.31 $500.28

Total Estimated Cost $76,743.52 $2,972.74 $2,582.20 $37,649.72 $17,792.40 $5,399.56 $1,418.97 $3,424.86 $5,503.07

Cost from Prior CEF: $69,978.65 Manual Entry

Cost from Delta CEF; $6,764.87 Manual Entry

Cost (Prior + Delta): $76,743.52 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $76,743.52 Auto-Calculated

Final

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Fashion Square Cleaners SUBTASK 2: HASP & Utility Clearance

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Total Hours 2

D Phillips Senior Scientist Round-Trip Mobilize from Orlando to the site in Tampa 3 Utility clearance 4

Total Hours 7

TOTAL LABOR 9

VEHICLE TYPE RATE UNIT USEAGE

Rental Car $80.00 day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GeoView Private Utility Location 1 $900.00

TOTAL $900.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

$900.00

FINAL --7/24/96

SUBTASK 3: DPT Soil & Groundwater Sampling

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Round-Trip Mobilize from Orlando to the site in Tampa 4 Discuss scope of work and Health and Safety Plan 0 Litho Borings and DPT Sampling (0.5 day) 5

Total Hours 10 K. Morrison r. Associate ScientiRound-Trip Mobilizations from Tampa office to the site 7.5

Soil Borings and DPT Sampling 50 Total Hours 57.5

J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5 Open Well and collect DTW at 3 wells 0.5 Groundwater Sampling (3 wells) 3

Total Hours 5 B. Jarvis Administrative Create tables and data entry 4

Total Hours 4

TOTAL LABOR 76.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 1 $480.00 Rental Car $80.00 day 1 $80.00

TOTAL VEHICLE $560.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,251.00 1 $14,251.00

TOTAL $14,251.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

SPLP Extractions $45.00 15 $675.00 USEPA Method 8270 for VOHs IDW $73.00 1 $73.00 USEPA Method 8260 for PAHs IDW $110.00 1 $110.00 USEPA Method 6020 for Arsnic IDW $14.00 1 $14.00 USEPA Method 6020 for Cadmiumn IDW $14.00 1 $14.00 USEPA Method 6020 for Chromium IDW $14.00 1 $14.00 USEPA Method 6020 for Lead IDW $14.00 1 $14.00 Shipping Samples $70.00 4 $280.00 Encore Samplers $10.00 40 $400.00 USEPA Method 8260 for VOHs Soil SBs $110.00 40 $4,400.00 USEPA Method 8260 for VOHs Sediment SDs $110.00 1 $110.00 USEPA Method 8260 for VOHs Groundwater DPT $110.00 30 $3,300.00 USEPA Method 8260 for VOHs Catch Basin Surface W $110.00 1 $110.00 USEPA Method 8260 DPT Grab Water Samples MW00 $110.00 15 $1,650.00 USEPA Method 8260 for SPLP $110.00 4 $440.00 USEPA Method 8260 MW001 thourgh MW003 GW Sam $110.00 3 $330.00

TOTAL LAB $11,934.00

EQUIPMENT RATE COSTING UNIT USEAGE TOTALS

$40.00 day 5 $200.00 $700.00 week 1 $700.00 $290.00 day 1 $290.00

ITEM

Expendables Soil Assessment Kit Shallow Groundwater Sampling Kit Ice $6.50 each 11 $71.50

TOTAL EQUIPMENT $1,261.50

SUBTASK 4: Well Installation & Sampling

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

K. Morrison r. Associate Scient Mobilize from Tampa to the site 4.5 Oversight for Well Installations 30

Total Hours 34.5 J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5

Open Well and collect DTW at 8 wells 1 Groundwater Sampling (5 wells) 5

Total Hours 7.5 B. Jarvis Administrative Update tables 2

Total Hours 2

TOTAL LABOR 44

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck K. Morrison $120.00 day 3 $360.00 Rental Truck J. Penia $120.00 day 1 $120.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Well installations 1 $9,804.00

TOTAL $9,804.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

USEPA Method 8260 for PAHs IDW $110.00 1 $110.00 USEPA Method 6020 for Arsnic IDW $14.00 1 $14.00 USEPA Method 6020 for Cadmiumn IDW $14.00 1 $14.00 USEPA Method 6020 for Chromium IDW $14.00 1 $14.00 USEPA Method 6020 for Lead IDW $14.00 1 $14.00 Shipping Samples $70.00 1 $70.00 USEPA 8260 full list Groundwater MWs $110.00 5 $550.00 USEPA 8260 fill list Groundwater IDW $110.00 1 $110.00

TOTAL LAB $896.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $325.00 day 3 $975.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 2 $13.00

TOTAL EQUIPMENT $1,438.00

$9,804.00

SUBTASK 5: MAGS

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

G. Sattler Senior Engineer Deveolpe MAGS Plan and provide remote P.E. assistance 3 Check MAGS data. 3

Total Hours 6 K. Morrison r. Associate Scient Round-Trip Mobilization from Tampa office to the site 1.5

MAGS Testing 8 Total Hours 9.5

J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5 MAGS Testing 8

Total Hours 9.5 B. Jarvis Administrative Update tables 1

Total Hours 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

USEPA Method TO-15 for VOHs $200.00 10 $2,000.00 Sampling Shipping Overnight $110.00 1 $110.00

TOTAL LAB $2,110.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Investigation Kit $500.00 Day 1 $500.00

TOTAL EQUIPMENT $540.00

SUBTASK 6: IDW Management

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Characterization and waste profile for transportation and disposal of IDW drum(s) 1 Schedule IDW transport and disposal 1

Total Hours 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D Soil $110.00 9 $990.00

TOTAL $990.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 7: Professional Land Survey

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Verification professional land survey for completeness & accruracy 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa office to the site 1.5 PLS Oversight 4

Total Hours 5.5

TOTAL LABOR 5.5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

SurvTech Solutions Professional Land Survey $2,495.00 1 $2,495.00

TOTAL $2,495.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 8: SAR Preparation

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions and recommendations and prepare final Assessment Report 2 Total Hours 2

G. Sattler Senior Engineer Develop conclusions and recommendations and prepare for the MAGS section 2 Total Hours 2

D. Phillips Senior Scientist QA/QC check of soil & groundwater lab data 2 Prepare draft SAR lithological section, create draft figures 8

Total Hours 10 K. Morrison r. Associate Scient Prepare the draft SAR 20

Total Hours 20 J. Von Borstel GIS Analyst Creat and update figures 8

Total Hours 8 B. Jarvis Administrative Create and update tables 4

Total Hours 4

TOTAL LABOR 46

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Date: 6/20/2023

Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Manageme

Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Lan

Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation

Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9

SubTask 5 MAGS SubTask 10

Totals 1 2 3 4 5 6 7 8 Labor Rate Category

$80.12 Project Manager 1.28 1.28 $80.12 Senior Principal Scientist (MC) 0 0 0 0 0 0 0 0 $52.89 Senior Engineer / Scientist (GS) 2 0 0 0 0 0 0 2.0 $55.00 Senior Engineer / Scientist (DP) 0 0 0 0 0 0 0 0.0 $34.02 Sr. Associate Engineer / Scientist (KM) 20 0.0 0 0 0 0 0 20.0 $26.54 GIS Analyst / Graphics (JV) 0 0 0 0 0 0 0 0.0 $21.54 Associate Engineer / Scientist (JP) 0 0 0 0 0 0 0 0.0 $31.45 Administrative (BJ) 0 0 0 0 0 0 0 0.0

Total Hours 23.3 1.28 0.0 0.0 0 0 0 0 22.0

Direct Labor $888.38 $102.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $786.18

Overhead 125.30% $1,113.14 $128.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $985.08 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $421.09 $48.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $372.65 Total Labor $2,422.61 $278.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,143.91

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Groundwater Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GeoView $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $4,100.00 $0.00 $3,878.00 $222.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,100.00 $0.00 $3,878.00 $222.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Soil Assessment Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Ice $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAGS Investigation Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,522.61 $278.70 $0.00 $3,878.00 $222.00 $0.00 $0.00 $0.00 $2,143.91 Completion Fee $242.26 $27.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $214.39

Total Estimated Cost $6,764.87 $306.57 $0.00 $3,878.00 $222.00 $0.00 $0.00 $0.00 $2,358.30

Cost from Prior CEF: Manual Entry

Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated

Rounding Error: $6,764.87 Auto-Calculated

Final Total Cost: $6,764.87 Auto-Calculated

Delta

SUBTASK 3: DPT Soil & Groundwater Sampling

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 0 Round-Trip Mobilize from Orlando to the site in Tampa 0 Litho Borings and DPT Sampling (0.5 day) 0

Total Hours 0 K. Morrison Sr. Associate Scientist Round-Trip Mobilizations from Tampa office to the site 0

Soil Borings and DPT Sampling 0 Total Hours 0

J. Penia Technician Round-Trip Mobilization from Tampa office to the site 0 Open Well and collect DTW at 3 wells 0 Groundwater Sampling (3 wells) 0

Total Hours 0 B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck $480.00 week 0 $0.00 Rental Car $80.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $14,251.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

USEPA Method 8260 for VOHs Soil SBs $73.00 -40 ($2,920.00) USEPA Method 8260 for VOHs Sediment SDs $73.00 -1 ($73.00) SPLP Extractions $45.00 $0.00 USEPA Method 8260 for VOHs Groundwater DPT $73.00 -30 ($2,190.00) USEPA Method 8260 for VOHs Catch Basin Surface Water SWs $73.00 -1 ($73.00) USEPA Method 8260 DPT Grab Water Samples MW001 - MW003 $73.00 -15 ($1,095.00) USEPA Method 8260 for SPLP $73.00 -4 ($292.00) USEPA Method 8260 MW001 thourgh MW003 GW Samples $73.00 -3 ($219.00) USEPA Method 8270 for VOHs IDW $73.00 0 $0.00 USEPA Method 8260 for PAHs IDW $110.00 0 $0.00 USEPA Method 6020 for Arsnic IDW $14.00 0 $0.00 USEPA Method 6020 for Cadmiumn IDW $14.00 0 $0.00 USEPA Method 6020 for Chromium IDW $14.00 0 $0.00 USEPA Method 6020 for Lead IDW $14.00 0 $0.00 Shipping Samples $70.00 0 $0.00 Encore Samplers $10.00 40 $400.00 USEPA Method 8260 for VOHs Soil SBs $110.00 40 $4,400.00 USEPA Method 8260 for VOHs Sediment SDs $110.00 1 $110.00 USEPA Method 8260 for VOHs Groundwater DPT $110.00 30 $3,300.00 USEPA Method 8260 for VOHs Catch Basin Surface Water SWs $110.00 1 $110.00 USEPA Method 8260 DPT Grab Water Samples MW001 - MW003 $110.00 15 $1,650.00 USEPA Method 8260 for SPLP $110.00 4 $440.00 USEPA Method 8260 MW001 thourgh MW003 GW Samples $110.00 3 $330.00

TOTAL LAB $3,878.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00 Soil Assessment Kit $700.00 week 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00

SUBTASK 4: Well Installation & Sampling

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

K. Morrison r. Associate Scient Mobilize from Tampa to the site 0 Oversight for Well Installations 0

Total Hours 0 J. Penia Technician Round-Trip Mobilization from Tampa office to the site 0

Open Well and collect DTW at 8 wells 0 Groundwater Sampling (5 wells) 0

Total Hours 0 B. Jarvis Administrative Update tables 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck K. Morrison $120.00 day 0 $0.00 Rental Truck J. Penia $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Well installations 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

USEPA 8260 for VOHs Groundwater MWs $73.00 -5 ($365.00) USEPA 8260 for VOHs Groundwater IDW $73.00 -1 ($73.00) USEPA Method 8260 for PAHs IDW $110.00 0 $0.00 USEPA Method 6020 for Arsnic IDW $14.00 0 $0.00 USEPA Method 6020 for Cadmiumn IDW $14.00 0 $0.00 USEPA Method 6020 for Chromium IDW $14.00 0 $0.00 USEPA Method 6020 for Lead IDW $14.00 0 $0.00 Shipping Samples $70.00 0 $0.00 USEPA 8260 full list Groundwater MWs $110.00 5 $550.00 USEPA 8260 fill list Groundwater IDW $110.00 1 $110.00

TOTAL LAB $222.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00

$9,804.00

SUBTASK 8: SAR Preparation

DATE: 6/20/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal ScienDevelop conclusions and recommendations and prepare final Assessment Report 0 Total Hours 0

G. Sattler Senior Engineer Develop conclusions and recommendations and prepare for the MAGS section 2 Total Hours 2

D. Phillips Senior Scientist QA/QC check of soil & groundwater lab data 0 Prepare draft SAR lithological section, create draft figures 0

Total Hours 0 K. Morrison r. Associate Scient Prepare the draft SAR 20

Total Hours 20 J. Von Borstel GIS Analyst Creat and update figures 0

Total Hours 0 B. Jarvis Administrative Create and update tables 0

Total Hours 4

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Date: 6/20/2023

Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Manageme

Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Lan

Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation

Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9

SubTask 5 MAGS SubTask 10

Totals 1 2 3 4 5 6 7 8 Labor Rate Category

$80.12 Project Manager 11 11.1 $80.12 Senior Principal Scientist (MC) 2 0 0 0 0 0 0 2 $52.89 Senior Engineer / Scientist (GS) 10 2 0 0 6 0 0 2 $55.00 Senior Engineer / Scientist (DP) 30 7 10 0 0 2 1 10 $34.02 Sr. Associate Engineer / Scientist (KM) 122 0.0 57.5 34.5 9.5 0 0 20 $26.54 GIS Analyst / Graphics (JV) 8 0 0 0 0 0 0 8 $21.54 Associate Engineer / Scientist (JP) 28 0 5 7.5 9.5 0 5.5 0 $31.45 Administrative (BJ) 11 0 4 2 1 0 0 4

Total Hours 221 11.1 9.0 76.50 44.0 26.0 2.0 6.5 46

Direct Labor $7,725.82 $888.81 $490.78 $2,739.65 $1,398.14 $876.61 $110.00 $173.47 $1,048.36

Overhead 125.30% $9,680.46 $1,113.68 $614.95 $3,432.78 $1,751.87 $1,098.39 $137.83 $217.36 $1,313.60 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $3,662.03 $421.30 $232.63 $1,298.59 $662.72 $415.51 $52.14 $82.22 $496.92 Total Labor $21,068.31 $2,423.79 $1,338.36 $7,471.02 $3,812.73 $2,390.51 $299.97 $473.05 $2,858.88

Travel Vehicle Rental $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00 Total Travel $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Groundwater Protection $24,055.00 $0.00 $14,251.00 $9,804.00 $0.00 $0.00 $0.00 $0.00 SurvTech Solutions $2,495.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,495.00 $0.00 Erwin Remediation $990.00 $0.00 $0.00 $0.00 $0.00 $990.00 $0.00 $0.00 GeoView $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $28,440.00 $900.00 $14,251.00 $9,804.00 $0.00 $990.00 $2,495.00 $0.00 Handling Fee $2,844.00 $90.00 $1,425.10 $980.40 $0.00 $99.00 $249.50 $0.00 Total Subcontractor Cost $31,284.00 $990.00 $15,676.10 $10,784.40 $0.00 $1,089.00 $2,744.50 $0.00

Laboratory Analytical Costs $10,380.00 $0.00 $7,776.00 $604.00 $2,000.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $110.00 $0.00 $0.00 $0.00 $110.00 $0.00 $0.00 $0.00 Sample Shipping $350.00 $0.00 $280.00 $70.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $10,840.00 $0.00 $8,056.00 $674.00 $2,110.00 $0.00 $0.00 $0.00

Field Expenses Expendables $480.00 $40.00 $200.00 $160.00 $40.00 $0.00 $40.00 $0.00 Soil Assessment Kit $0.00 $700.00 $975.00 $0.00 $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 Ice $84.50 $0.00 $71.50 $13.00 $0.00 $0.00 $0.00 $0.00 MAGS Investigation Kit $500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $0.00 $0.00 Total Field Expenses $3,319.50 $40.00 $1,261.50 $1,438.00 $540.00 $0.00 $40.00 $0.00

Subtotal $67,871.81 $2,423.79 $2,448.36 $33,024.62 $17,189.13 $5,160.51 $1,388.97 $3,377.55 $2,858.88 Completion Fee $2,106.84 $242.38 $133.84 $747.10 $381.27 $239.05 $30.00 $47.31 $285.89

Total Estimated Cost $69,978.65 $2,666.17 $2,582.20 $33,771.72 $17,570.40 $5,399.56 $1,418.97 $3,424.86 $3,144.77

Original

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Fashion Square Cleaners ERIC_4742

HW682 Environmental Consulting & Technology, Inc.

DC005B 1

In Subtask 3 and 4, since the submitting the original proposal the FDEP has requested the full 8260 list instead of the 8260 VOHs, ECT is requesting for the cost difference to change the 8260 full list analysis in Subtasks 3 and 4. Additionally,there was an error in the Cost Estimate Formula Sheet that affect the total labor dollars in SubTask and SubTask Project Management.

In SubTask 3, 94 soil and groundwater samples are requested to be changed from 8260 VOHs to 8260 full list. SubTask 4, has 6 groundwater samples to be changed from 8260 VOHs to 8260 full list. The Cost Estimate Formula Sheet was not calculating the total hours that were presented on the Cost Estimate sheet which did not account for all of the labor costs for SubTask .This error also affected the project management hours.

Attached is the COELOE worksheets.

SubTask 1: Project Management MC 1.82 hours

SubTask 3: 94 Soil and groundwater samples for 8260 were changed from VOHs to full list. The 8260 full list increased the $110.00 per sample. This increases the the analytical cost by $2,370.00

SubTask 4: Groundwater Sampling; 6 samples changing from 8260 VOHs to full list resulted in an increase of $123.00.

SubTask SAR; Hours missing from the Direct Labor total were GS 2-hours, KM 20-hours, JV 8-hours, and BG 4-hours

$ 6,437.01

Digitally signed by Gregory Sattler DN: CN=Gregory Sattler, E=GSattler@ectinc.com Reason: I am the author of this document Location: your signing location here Date: 2023.04.20 08:24:35-04'00' Foxit PhantomPDF Version: 10.1.7

Gregory Sattler

Ginger Shirah Digitally signed by Ginger Shirah Date: 2023.04.20 10:35:28 -04'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2023.04.20 11:14:40 -04'00'

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments(if applicable, listdocuments supportingchange):

• Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

AuthorizedContractorSignature:

AuthorizedFDEPSignature:

FDEP SupervisorApproval:

(if applicable)

Fashion Square Cleaners ERIC_4742

HW682 Environmental Consulting & Technology, Inc.

DC005B 2

Soil samples collected under Subtask 3 for analysis using SPLP for VOCs require collection using an Encore sampler. Laboratory costs of $10 per sampler were not included in the TA. Additionally, analysis of groundwater samples for the full 8260 list are included at a rate of $100 instead of $110.

In Subtask 3, costs for soil samples are requested to include the cost for Encore samplers for soil samples. Also in Subtask 3, the cost of $110 dollars is requested to be applied to the DPT groundwater samples.

The COELOE worksheet is attached.

Subtask 3: Encore samplers for 40 soil samples results in an increase of $400.00.

Increasing unit costs for full 8260 suite from $100.00 to $110.00 per sample for 30 DPT groundwater samples results in an increase of $300.00.

$ 700.00

Digitally signed by Leif Layton DN: CN=Leif Layton, E=llayton@ectinc.com Reason: I am the author of this document Location: your signing location here Date: 2023.04.28 14:32:02-04'00' Foxit PhantomPDF Version: 10.1.5

Leif Layton

Ginger Shirah Digitally signed by Ginger Shirah Date: 2023.05.01 10:15:23 -04'00'

Kelly Crain Digitally signed by Kelly Crain Date: 2023.05.01 10:22:30 -04'00'

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC005B Completion July 29, 2023

This Task Assignment authorizes ECT to to conduct site assessment activities at the Fashion Square Cleaners site located in Tampa, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on December 12, 2022.

Kelly Crain 850-245-8953 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4742

FASHION SQUARE CLEANERS, Tampa, Hillsborough County

FASHION SQUARE CLEANERS

Contractor Contractor

✔ $ 69,978.65

$ 69,978.65

Select One

Environmental Consulting and Technology, Inc. (ECT Contractor Mark A. Culbreth

Contract Manager

12/15/2022

Digitally signed by Mark Culbreth DN: CN=Mark Culbreth, E=mculbreth@ectinc.com Reason: I am approving this document Location: your signing location here Date: 2022.12.15 12:23:10-05'00' Foxit PhantomPDF Version: 10.1.6

Mark Culbreth

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2022.12.15 11:53:45 -05'00'

12/15/2022

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Email deliverable for GPR and Field Notes (Subtask 2) 02/02/2023

Email deliverable DPT and Soil Sampling Field Notes (Subtask 3) 03/02/2023

Email deliverable well installation and sampling Field Notes (Subtask 4) 04/01/2023

Email deliverable for MAGS Field Notes (Subtask 5) 05/01/2023

PLS and IDW Manifest (Subtask 6 and 7) 05/31/2023

SAR and PM (Subtask 8 and 1) 06/30/2023

FDEP Approval of Email deliverable for GPR and Field Notes (Subtask 2) $ 2,582.20

FDEP Approval of Email deliverable DPT and Soil Sampling Field Notes (Subtask 3) $ 33,771.72

FDEP Approval of Email deliverable well installation and sampling Field Notes (Subtask 4) $ 17,570.40

FDEP Approval of Email deliverable for MAGS Field Notes (Subtask 5) $ 5,399.56

FDEP Approval of PLS and IDW Manifest (Subtask 6 and 7) $ 4,843.83

FDEP Approval of SAR and PM (Subtask 8 and 1) $ 5,810.94

$ 69,978.65

HW682

DC005B