This document package consists of Task Assignment Change Orders (TACO) for Contract HW682, a state and local contract for environmental consulting services between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The project involves environmental assessment and remediation work at Aldos Cleaners, a contaminated site located in Boca Raton, Palm Beach County, Florida (ERIC_5188). The contract is managed by FDEP Project Manager Karlee Fowler and ECT Contract Manager Mark A. Culbreth.

The contract encompasses nine subtasks for the initial site assessment phase, including HASP and utility survey, soil and groundwater sampling with DPT, well installation, soil vapor assessment, professional land survey, IDW management, site assessment reporting, and PFAS screening. TACO 2, executed on October 24, 2024, reduced the task value from $78,203.45 to $76,443.45 due to decreases in drilling, analytical, and IDW costs. TACO 3, executed on February 21, 2025, increased the task value from $76,443.45 to $78,873.63 (256 total labor hours) to accommodate an additional PFAS screening sampling event, extending the completion date from May 14, 2025 to July 18, 2025 (65 additional days). The contract utilizes a fixed unit rate pricing structure with invoicing contingent upon FDEP approval of deliverables for each subtask phase.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO1.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26AC02.pdf PDF
CN-370000-HW682-DC26ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC014B 3 HW682

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_4575

Aldos Cleaners

$ 78,873.63 $ 76,443.45

$ 78,873.63 $ 76,443.45

05/14/2025 07/18/2025 65

1 1 3

Environmental Consulting & Technology, Inc.

Mark A. Culbreth

Contract Manager

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.02.21 12:49:37 -05'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

From:

Date:

To: HW Contract Negotiation File

ERIC_

, Project Manager

, 202 Subject: Negotiation Summary

HW

is with labor hours.

FDEP COST ESTI MATEContractor: Environmental Consulting & Technology, Inc.

Date: 2/11/2025

Task #: DC014B SubTask 1 Project Management SubTask 6 Professional Land Survey

Site: Aldos Cleaners (TACO 3) SubTask 2 HASP & Utility Clearance SubTask 7 IDW Management

Activity/Phase: Initial Site Assessment SubTask 3 Soil Sampling with DPT & Groundwater Sampling SubTask 8 SAR Preparation

Project Manager: Mark Culbreth SubTask 4 Well Installation & Groundwater Sampling SubTask 9 PFAS Screening

SubTask 5 MAGS SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$82.52 Project Manager 1 0.7 $82.52 Senior Principal Scientist (MC) 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$55.00 Senior Engineer / Scientist (DP) 3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0

$27.35 GIS Analyst / Graphics (JV) 2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0

$22.85 Associate Engineer / Scientist (JP) 11 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.0 0.0

$33.36 Administrative (BJ) 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$59.43 Senior Engineer / Scientist (GS) 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$24.26 Technician (BC) 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 17 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0

Direct Labor $532.29 $61.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $471.05 $0.00

Overhead 125.30% $666.96 $76.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $590.23 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $252.31 $29.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $223.28 $0.00

Total Labor $1,451.56 $167.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,284.56 $0.00

Travel

Vehicle Rental $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $240.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $222.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $222.00 $0.00

Total Travel $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $462.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

GeoView $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Groundwater Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Earth Tech Drilling $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Southeastern $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Expendables $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40.00 $0.00

Soil Assessment Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Monitoring well Install Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Shallow Groundwater Sampling Kit $325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $325.00 $0.00

Ice $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.50 $0.00

Total Survey Station $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

MAGS Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Sampling Canisters $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $371.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $371.50 $0.00

Subtotal $2,285.06 $167.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,118.06 $0.00

Completion Fee $145.16 $16.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $128.46 $0.00

Total Estimated Cost $2,430.22 $183.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,246.52 $0.00

SITE : Aldos Cleaners (TACO 3) SUBTASK 9: PFAS Screening

DATE: 2/11/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Sr. Scientist Prepare PFAS deliverable 3 Total Hours 3

J. Von Borstel GIS Analyst/Graphics Prepare PFAS figure 2 Total Hours 2

J. Penia Associate Scientist Roundtrip mobilization from Tampa to site in Boca Raton 9 Collect samples from 2 monitoring wells for PFAS screening. 2

Total Hours 11

TOTAL LABOR 16

VEHICLE TYPE RATE UNIT USEAGE

Truck J. Penia $120.00 Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

J. Penia Per Diem 36.00$ Day 2 $72.00 J. Penia Hotel 150.00$ Day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow Groundwater Sampling Kit $325.00 Day 1 $325.00 Ice $6.50 Each 1 $6.50

TOTAL EQUIPMEN $371.50