CN-370000-HW682-DC19BCO1.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO #1) executed between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The change order amends Task Assignment DC019B under Contract HW682, with FDEP Project Manager Karlee Fowler overseeing the engagement and ECT's Contract Manager Mark A. Culbreth serving as the contractor's point of contact. The project is located in Jacksonville, Duval County, Florida, at the Jet Cleaners #7 facility (Project Number ERIC_4594).

The change order reconciles a cost decrease caused by a reduction in the number of monitoring wells available for sampling. Specifically, the laboratory cost for Subtask 2 (NAM Sampling & Reporting) has been reduced to reflect the inability to collect a sample from monitoring well MW001, which had been destroyed. The amended Task Assignment total value decreased from $8,182.19 to $8,109.19, representing a reduction of $73.00. The total cost is structured as a Fixed Unit Rate, with invoicing scheduled in two tranches: $7,111.52 upon FDEP approval of field notes and laboratory analytical reports for Subtask 2 (due 03/28/2025), and $997.67 upon FDEP approval of project management and IDW manifest documentation for Subtasks 1 and 3 (due 03/28/2025). The Task Assignment completion date was extended from July 18, 2025, to July 31, 2025, providing an additional 13 days. The work encompasses annual Natural Attenuation Monitoring activities including project management, NAM sampling and reporting, and IDW (Investigation Derived Waste) manifest preparation.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001E.pdf PDF
CN-370000-HW682-DC003C.pdf PDF
CN-370000-HW682-DC004A.pdf PDF
CN-370000-HW682-DC004B.pdf PDF
CN-370000-HW682-DC006A.pdf PDF
CN-370000-HW682-DC009A.pdf PDF
CN-370000-HW682-DC019B.pdf PDF
CN-370000-HW682-DC021B.pdf PDF
CN-370000-HW682-DC022A.pdf PDF
CN-370000-HW682-DC03CCO1.pdf PDF
CN-370000-HW682-DC03CCO4.pdf PDF
CN-370000-HW682-DC04BCO4.pdf PDF
CN-370000-HW682-DC05BCO2.pdf PDF
CN-370000-HW682-DC05BCO3.pdf PDF
CN-370000-HW682-DC05BCO7.pdf PDF
CN-370000-HW682-DC08BCO3.pdf PDF
CN-370000-HW682-DC10BCO2.pdf PDF
CN-370000-HW682-DC10CCO1.pdf PDF
CN-370000-HW682-DC11AC12.pdf PDF
CN-370000-HW682-DC11AC14.pdf PDF
CN-370000-HW682-DC11ACO5.pdf PDF
CN-370000-HW682-DC11ACO9.pdf PDF
CN-370000-HW682-DC14BCO4.pdf PDF
CN-370000-HW682-DC16BCO1.pdf PDF
CN-370000-HW682-DC20ACO2.pdf PDF
CN-370000-HW682-DC20BCO1.pdf PDF
CN-370000-HW682-DC22ACO1.pdf PDF
CN-370000-HW682-DC25ACO1.pdf PDF
CN-370000-HW682-DC25ACO2.pdf PDF
CN-370000-HW682-FIL1.pdf PDF
CN-370000-HW682-FIL4.pdf PDF
CN-370000-HW682-FIL7.pdf PDF
CN-370000-HW682-HW012A.pdf PDF
CN-370000-HW682-HW017A.pdf PDF
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC019B 1 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4594

Jet Cleaners #7

✔ $ 8,109.19 $ 8,182.19

$ 8,109.19 $ 8,182.19 ✔ Completion

Completion 07/18/2025 07/31/2025 13

✔ 1 1 1

Environmental Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager Digitally signed by Mark Culbreth Date: 2025.04.29 16:54:29-04'00'Mark Culbreth

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.04.29 16:02:57 -04'00'

This change order reconciles a cost decrease caused by a decrease in the number of monitoring wells.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC019B

$ 8,109.19

Annual NAM Report (Subtask 2)

Project Management, IDW Manifest (Subtask 1, Subtask 3)

FDEP Approval of Field Notes and Laboratory Analytical Report (Subtask 2)

FDEP Approval of Project Management, IDW Manifest (Subtask 1, Subtask 3)

02/28/2025

03/28/2025

$ 997.67

$ 7,111.52

FFLORIDAA DEPARTMENTT OFF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantiss Governor

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW682 Contract File

ERIC_

K , Project Manager Negotiation Summary April 7 202

The Task Assignment total $ , The project manager agrees to the scope of work and associated costs. ECT may invoice according to the attached schedule.

FDEP COST ESTIMATE

Contractor: Environmental Consulting & Technology, Inc.

Date: 4/23/2025

Task #: DC019B SubTask 1 Project Management

Site: Jet Cleaners #7 SubTask 2 NAM Sampling & Reportin

Activity/Phase: Annual NAM Sampling & SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$82.52 Project Manager 2.8 2.8 $84.17 Senior Principal Scientist (MC) 4 4.0 0.0 $55.00 Senior Engineer / Scientist (DP) 15 14.0 1.0 $28.44 GIS Analyst / Graphics (JV) 4 4.0 0.0 $23.00 Technician (MW) 16 16.0 0.0 $34.81 Administrative (BJ) 4 4.0 0.0

Total Hours 6 2.8 2.0 1.0

Direct Labor $2,014.43 $231.75 $1,727.68 $55.00

Overhead 125.30% $2,524.08 $290.38 $2,164.78 $68.92 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $954.84 $109.85 $818.92 $26.07 Total Labor $5,493.35 $631.98 $4,711.38 $149.99

Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 Total Travel $462.00 $462.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50

Laboratory Analytical Costs $584.00 $584.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 Total Laboratory $654.00 $654.00 $0.00

Field Expenses Expendables $80.00 $80.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55-Gallon Drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $813.00 $813.00 $0.00

Subtotal $7,559.85 $631.98 $6,640.38 $287.49 Completion Fee $549.34 $63.20 $471.14 $15.00

Total Estimated Cost $8,109.19 $695.18 $7,111.52 $302.49

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Jet Cleaners #7 SUBTASK 2: NAM Sampling & Reporting

DATE: 4/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 4 Total Hours 4

D. Phillips Sr. Scientist Notify RPO of field activities & confirm site access 2 Update HASP & Prepare draft Annual NAM Report 12

Total Hours 14 J. Von Borstel GIS Analyst/Graphics Update Figures 4

Total Hours 4 M. Wiss Technician Prep for field work and obtain IDW Drum 1

Roundtrip mobilization 5 Locate, open Well and collect DTW at 12 wells 1 Collect groundwater Samples from 7 wells 8 Containerize & sample well purge water 1

Total Hours 16 B. Jarvis Administrative Update tables and document production 4

Total Hours 4

TOTAL LABOR 42

VEHICLE TYPE RATE UNIT USEAGE

Truck M. Wiss $120.00 Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

M. Wiss Per Diem $36.00 Day 2 $72.00 M. Wiss Hotel $150.00 Day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units Shipping $70.00 1 $70.00 USEPA Method 8260 for VOHs $73.00 7 $511.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00

TOTAL LAB $654.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55-Gallon Drum $100.00 Day 1 $100.00 Ice $6.50 Each 2 $13.00

TOTAL EQUIPMEN $813.00

FINAL --7/24/96

SUBTASK 3: IDW Manifest

DATE: 4/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Sr. Scientist Schedule and coordinate the IDW T&D 1 Total Hours 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDT T&D $125.00 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMEN $0.00

Contractor: Environmental Consulting & Technology, Inc.

Date: 4/23/2025

Task #: DC019B SubTask 1 Project Management

Site: Jet Cleaners #7 SubTask 2 NAM Sampling & Reportin

Activity/Phase: Annual NAM Sampling & SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$82.52 Project Manager 0 0.0 $84.17 Senior Principal Scientist (MC) 0 0.0 0.0 $55.00 Senior Engineer / Scientist (DP) 0 0.0 0.0 $28.44 GIS Analyst / Graphics (JV) 0 0.0 0.0 $23.00 Technician (MW) 0 0.0 0.0 $34.81 Administrative (BJ) 0 0.0 0.0

Total Hours 0 0.0 0.0 0.0

Direct Labor $0.00 $0.00 $0.00 $0.00

Overhead 125.30% $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Laboratory Analytical Costs ($73.00) ($73.00) $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 Total Laboratory ($73.00) ($73.00) $0.00

Field Expenses Expendables $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 Metal Detector $0.00 $0.00 $0.00 DOT 55-Gallon Drum $0.00 $0.00 $0.00 Ice $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00

Subtotal ($73.00) $0.00 ($73.00) $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($73.00) $0.00 ($73.00) $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 2: NAM Sampling & Reporting

DATE: 4/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 0 Total Hours 0

D. Phillips Sr. Scientist Notify RPO of field activities & confirm site access 0 Update HASP & Prepare draft Annual NAM Report 0

Total Hours 0 J. Von Borstel GIS Analyst/Graphics Update Figures 0

Total Hours 0 M. Wiss Technician Prep for field work and obtain IDW Drum 0

Roundtrip mobilization 0 Locate, open Well and collect DTW at 12 wells 0 Collect groundwater Samples from 7 wells 0 Containerize & sample well purge water 0

Total Hours 0 B. Jarvis Administrative Update tables and document production 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck M. Wiss $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

M. Wiss Per Diem $36.00 Day 0 $0.00 M. Wiss Hotel $150.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units Shipping $70.00 0 $0.00 USEPA Method 8260 for VOHs $73.00 -1 ($73.00) IDW USEPA Method 8260 for VOHs $73.00 0 $0.00

TOTAL LAB ($73.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Metal Detector $40.00 Day 0 $0.00 DOT 55-Gallon Drum $100.00 Day 0 $0.00 Ice $6.50 Each 0 $0.00

TOTAL EQUIPMEN $0.00

DATE: 4/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Sr. Scientist Schedule and coordinate the IDW T&D 0 Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDT T&D $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMEN $0.00

Contractor: Environmental Consulting & Technology

Date: 10/24/2024

Task #: SubTask 1 Project Management

Site: Jet Cleaners #7 SubTask 2 NAM Sampling & Report

Activity/Phase: Annual NAM Sampling & Report SubTask 3 IDW Manifest

Project Manager: Mark Culbreth SubTask 4

SubTask 5

Totals 1 2 3 Labor Rate Category

$84.17 Project Manager 2.8 2.8 $84.17 Senior Principal Scientist (MC) 4 4 0 $55.00 Senior Engineer / Scientist (DP) 15 14.0 1 $28.44 GIS Analyst / Graphics (JV) 4 4 0 $23.00 Technician (MW) 16 16 0 $34.81 Administrative (BJ) 4 4 0

Total Hours 46 2.8 42.0 1.0

Direct Labor $2,014.43 $231.75 $1,727.68 $55.00

Overhead 125.30% $2,524.08 $290.38 $2,164.78 $68.92 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 Fringe 47.40% $954.84 $109.85 $818.92 $26.07 Total Labor $5,493.35 $631.98 $4,711.38 $149.99

Travel Vehicle Rental $240.00 $240.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 Total Travel $462.00 $462.00 $0.00

Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Erwin Remediation $125.00 $0.00 $125.00 Subcontractor Subtotal $125.00 $0.00 $125.00 Handling Fee $12.50 $0.00 $12.50 Total Subcontractor Cost $137.50 $0.00 $137.50

Laboratory Analytical Costs $657.00 $657.00 $0.00 Sample Shipping $70.00 $70.00 $0.00 Total Laboratory $727.00 $727.00 $0.00

Field Expenses Expendables $80.00 $80.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 Metal Detector $40.00 $40.00 $0.00 DOT 55 gallon drum $100.00 $100.00 $0.00 Ice $13.00 $13.00 $0.00 Total Field Expenses $813.00 $813.00 $0.00

Subtotal $7,632.85 $631.98 $6,713.38 $287.49 Completion Fee $549.34 $63.20 $471.14 $15.00

Total Estimated Cost $8,182.19 $695.18 $7,184.52 $302.49

SUBTASK 2: NAM Sampling & Report

DATE: 10/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 4 Total Hours 4

D. Phillips Senior Engineer Notify RPO of field activities & confirm site access 2 Update HASP & Prepare draft Annual NAM Report 12

Total Hours 14 J. Von Borstel GIS Analyst Update Figures 4

Total Hours 4 M. Wiss Technician Prep for field work and obtain IDW Drum 1

Roundtrip mobilization 5 Locate, open Well and collect DTW at 12 wells 1 Collect groundwater Samples from 8 wells 8 Containerize & sample well purge water 1

Total Hours 16 B. Jarvis Administrative Update tables and document production 4

Total Hours 4

TOTAL LABOR 42

VEHICLE TYPE RATE UNIT USAGE

Truck M. Wiss $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

M. Wiss Per diem $36.00 day 2 $72.00 M. Wiss Hotel $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 for VOHs $73.00 8 $584.00 IDW USEPA Method 8260 for VOHs $73.00 1 $73.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $727.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 Day 1 $100.00 Ice $6.50 Each 2 $13.00

TOTAL EQUIPMENT $813.00

DATE: 10/24/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Schedule and coordination of the IDW T&D 1 Total Hours 1

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT

Erwin Remediation IDW T&D $125.00 1 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

Fowler, Karlee

From: Leif Layton <llayton@ectinc.com> Sent: Thursday, March 27, 2025 8:22 AM To: Fowler, Karlee Cc: Mark Culbreth; Courtney Wranosky Subject: DC019B Jet Cleaners #7 TACO Attachments: 2025-03-27 HW682_DC019B Jet Cleaners TACO #1.xlsx

Follow Up Flag: Follow up Flag Status: Flagged

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good morning Karlee, Please see the attached TACO for Jet Cleaners which reduces the Subtask 2 laboratory cost to reflect not collecting a sample from MW001 which had been destroyed.

Thank you, Leif Layton, Ph.D., P.E.

Sr. Associate Engineer | Site Assessment & Remediation C: 813.299.7867 | D: 813.725.5855

Follow us:

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW682

DC019B Completion July 18, 2025

This Task Assignment authorizes ECT to perform annual Natural Atetnsuation Monitoring at Jet #7 Cleaners in Jacksonville, FL

Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_3985

Jacksonville, Duval County, Florida

Jet #7 Cleaners

Contractor Contractor

✔ $ 8,182.19

$ 8,182.19

Scope of Work

Environmental Consulting and Technology, Inc. (ECT Contractor

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.11.26 11:07:25 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual NAM Report (Subtask 2) 02/28/2025

Project Management, IDW Manifest (Subtask 1, Subtask 3) 03/28/2025

FDEP Approval of Field Notes and Laboratory Analytical Report (Subtask 2) $ 7,184.52

FDEP Approval of Project Management, IDW Manifest (Subtask 1, Subtask 3) $ 997.67

$ 8,182.19

HW682

DC019B