This document is a Task Assignment Change Order (TACO) No. 2 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) for environmental assessment services at Classic Cleaners of Ocala, a site in Marion County, Florida (ERIC_4905). The contract is identified as HW682, with Task Assignment DC024A. The change order was executed on June 23, 2025, by Mark Culbreth (ECT Contract Manager) and Tim Bahr (FDEP Secretary or Designee).

This TACO reconciles an overall cost decrease of $3,913.14, reducing the amended price from $141,939.98 to $138,026.84, while accommodating scope changes in Subtask 3, costs associated with PFAS screening, and changes in drilling rates as described in Work Change Directive WCD-01. The deliverables include email submittals for Health and Safety Plans, soil boring and sampling data, well installation documentation, MAGS testing results, Professional Land Survey data, IDW waste manifests, and a final Site Assessment Report, with invoicing contingent upon FDEP approval of each deliverable. The total task value is $138,026.84, with a completion date of February 27, 2026, and 287 total labor hours. The invoice schedule specifies six payment milestones ranging from $3,481.01 to $61,640.84, with the largest payment associated with well installation and groundwater sampling activities.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2.pdf PDF
CN-370000-GC914.pdf PDF
CN-370000-HW682-DC001A.pdf PDF
CN-370000-HW682-DC001D.pdf PDF
CN-370000-HW682-DC006C.pdf PDF
CN-370000-HW682-DC007A.pdf PDF
CN-370000-HW682-DC008A.pdf PDF
CN-370000-HW682-DC008E.pdf PDF
CN-370000-HW682-DC011A.pdf PDF
CN-370000-HW682-DC012A.pdf PDF
CN-370000-HW682-DC012C.pdf PDF
CN-370000-HW682-DC013B.pdf PDF
CN-370000-HW682-DC014A.pdf PDF
CN-370000-HW682-DC017A.pdf PDF
CN-370000-HW682-DC018A.pdf PDF
CN-370000-HW682-DC018B.pdf PDF
CN-370000-HW682-DC019C.pdf PDF
CN-370000-HW682-DC020A.pdf PDF
CN-370000-HW682-DC020B.pdf PDF
CN-370000-HW682-DC023A.pdf PDF
CN-370000-HW682-DC027B.pdf PDF
CN-370000-HW682-DC03BCO1.pdf PDF
CN-370000-HW682-DC04BCO1.pdf PDF
CN-370000-HW682-DC04BCO6.pdf PDF
CN-370000-HW682-DC05BCO1.pdf PDF
CN-370000-HW682-DC05BCO4.pdf PDF
CN-370000-HW682-DC05BCO5.pdf PDF
CN-370000-HW682-DC06ACO1.pdf PDF
CN-370000-HW682-DC08BCO1.pdf PDF
CN-370000-HW682-DC09ACO4.pdf PDF
CN-370000-HW682-DC11AC10.pdf PDF
CN-370000-HW682-DC11AC11.pdf PDF
CN-370000-HW682-DC11ACO2.pdf PDF
CN-370000-HW682-DC11ACO7.pdf PDF
CN-370000-HW682-DC11ACO8.pdf PDF
CN-370000-HW682-DC13BCO2.pdf PDF
CN-370000-HW682-DC13BCO5.pdf PDF
CN-370000-HW682-DC13BCO6.pdf PDF
CN-370000-HW682-DC14BCO3.pdf PDF
CN-370000-HW682-DC14BCO5.pdf PDF
CN-370000-HW682-DC15BCO1.pdf PDF
CN-370000-HW682-DC17ACO1.pdf PDF
CN-370000-HW682-DC18ACO1.pdf PDF
CN-370000-HW682-DC19BCO1.pdf PDF
CN-370000-HW682-DC21ACO2.pdf PDF
CN-370000-HW682-DC24ACO2.pdf PDF
CN-370000-HW682-DC24ACO3.pdf PDF
CN-370000-HW682-DC24ACO4.pdf PDF
CN-370000-HW682-DC25ACO3.pdf PDF
CN-370000-HW682-DC26ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC024A 2 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4905

Classic Cleaners of Ocala

✔ $ 138,026.84 $ 141,939.98

$ 138,026.84 $ 141,939.98 ✔ Completion

Completion 02/27/2026 02/27/2026 0

✔ 1 1 2

Environmental Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager Digitally signed by Mark Culbreth Date: 2025.06.23 11:28:34-04'00'Mark Culbreth Tim Bahr Digitally signed by Tim Bahr

Date: 2025.06.23 11:14:46 -04'00'

This change order reconciles an overall cost decrease caused by scope changes in Subtask 3, while allowing for costs associated with PFAS screening and a change in drilling rates as described in WCD-01.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC024A

$ 138,026.84

Email Deliverable for HASP and Utility Clearance (Subtask 2)

Email Deliverable for DPT, Soil Field Notes (Subtask 3)

Email Deliverable for Well Install, Field Notes, & Well Permits (Subtask 4)

Email Deliverable for MAGS (Subtask 5)

PLS, IDW Waste Manifest, PFAS Screening (Subtask 6, 7 & 9)

Project Management and Site Assessment Report (Subtask 1 & 8)

FDEP Approval of Email Deliverable for HASP and Utility Clearance (Subtask 2)

FDEP Approval of Email Deliverable for Well Install, Field Notes, & Well Permits (Subtask 4)

FDEP Approval of Email Deliverable for MAGS (Subtask 5)

FDEP Approval of Project Management and Site Assessment Report (Subtask 1 & 8)

FDEP Approval of PLS, IDW Waste Manifest, & PFAS Screening (Subtask 6, 7 & 9)

FDEP Approval of Email Deliverable for DPT, Soil Field Notes (Subtask 3)

11/15/2024

06/30/2025

09/01/2025

10/31/2025

12/19/2025

10/31/2025

$ 40,609.22

$ 3,481.01

$ 61,640.84

$ 5,711.49

$ 13,092.35

$ 13,491.93

Printed on recycled paper.

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

From:

Date:

To: HW Contract Negotiation File

ERIC_

, Project Manager

Subject: Negotiation Summary

HW

This Task Assignment is $ with labor hours.

F D E P

C O S T

E S T I M A T E

C on tra ct or

En vi ro nm en ta l C on su lti ng

T ec hn ol og y, In c.

D at e:

6/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t

Su bT as k

Pr of es si on al L an d

Su rv ey

Si te

C la ss ic C le an er s of O ca la

Su bT as k

H

AS

P

U til ity

C le ar an ce Su bT as k

ID

W

M an ag em en t

Ac tiv ity /P ha se

In iti al

S ite

A ss es sm en t (

O rig in al

T ac os

+2

Su bT as k

So il

Sa m pl in g w ith D

PT

G ro un dw at er

S am pl in g Su bT as k

SA

R

P re pa ra tio n

Pr oj ec t M an ag er

M ar k C ul br et h

Su bT as k

W el l I ns ta lla tio n

G ro un dw at er

S am pl in g Su bT as k

PF

A

S R ep or t

Su bT as k

M

AG

S

Su bT as k

To ta ls

La bo r R at e C at eg or y

$8 4.

Pr oj ec t M an ag er

.6

.6 $8

4.

Se ni or P rin ci pa l S ci en tis t (

M C

7.

0.

2.

$5 4.

Se ni or

E ng in ee r / S ci en tis t (

R P)

.0

0.

0.

0.

$5 5.

Se ni or

E ng in ee r / S ci en tis t (

D P)

3.

.0

.0

.0

$2

8.

G

IS

A na ly st

G ra ph ic s

(J V

0.

0.

$2 4.

As so ci at e

E ng in ee r / S ci en tis t (

JP

.0

.0

$2 3.

Te ch ni ci an

(M W

.0

$3 4.

Ad m in is tra tiv e

(B J)

.0

To ta l H ou rs

6.

.6

.5

.5

.0

.0

D ire ct L ab or

$1

4, 8.

$1 ,6

.9

$8

.0

$3

,0

.0

$4 ,4

.2

$9

.2

$2

.4

$1

.0

$2

,8

.8

$1

.2

O ve rh ea d

5.

$1

8, 3.

$2 ,0

.1

$1

,0

.4

$3 ,8

.5

$5

,5

.2

$1 ,2

.0

$3

.3

$1

.8

$3

,5

.5

$2

.0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.4

0% $6

,8

.4

$7

.5

$4

.0

$1 ,4

.3

$2

,0

.1

$4

.0

$1

.7

$5 2.

$1

,3

.4

$8 2.

To ta l L

$3 9, 1.

$4

,5

.6

$2 ,3

.5

$8

,4

.9

$1 2, 7.

$2

,6

.3

$6

.5

$2

.9

$7 ,7

.7

$4

.4

Tr av el Ve hi cl e R en ta l $1

,6

.0

$0 .0

$4

.0

$8

.0

$2

.0

$1

.0

$0

.0

$0 .0

$0

.0

Pe r d ie m

H ot el $2

,2

.0

$0 .0

$7

.0

$1

,0

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l $3

,9

.0

$0 .0

$1

,2

.0

$1 ,8

.0

$6

.0

$1

.0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r

(E qu ip m en t P ro cu re m en t)

Su bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em en t)

D ril lin g

(C on ve nt io na

l) $5

4, 5.

$0 .0

$1

6, 0.

$3 7, 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g

$3 ,9

.7

$0

.0

$0 .0

$0

.0

$0 .0

$3

,9

.7

$0 .0

$0

.0

$0 .0

ID

W

$6 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$6 ,3

.0

$0

.0

$0 .0

G

PR

$8

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or

S ub to ta l $6

5, 1.

$8

.0

$1 6, 0.

$3

7, 5.

$0 .0

$3

,9

.7

$6 ,3

.0

$0

.0

$0 .0

H an dl in g Fe e $6

,5

.1

$8 0.

$1

,6

.0

$3 ,7

.5

$0

.0

$3

.1

$6

.5

$0 .0

$0

.0

To ta l S ub co nt ra ct or

C os t $7

1, 5.

$8

.0

$1 8, 1.

$4

1, 7.

$0 .0

$4

,3

.9

$7 ,0

.5

$0

.0

$0 .0

La bo ra to ry An al yt ic al

C os ts $1

3, 1.

$0 .0

$9

,4

.0

$2 ,6

.0

$1

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e S hi pp in g

$5

.0

$0 .0

$3

.0

$7

0.

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y $1

3, 1.

$0 .0

$9

,7

.0

$2 ,7

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d

Ex pe ns es

Ex pe nd ab le s

$5

.0

$0 .0

$2

.0

$2

.0

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

So il As se ss m en t K it

$7

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M on ito rin g w el l I ns ta ll Ki t $1

,9

.0

$0 .0

$6

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Sh al lo w

G ro un dw at er

S am pl in g Ki t $8

.0

$0

.0

$2

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e

$9 1.

$0

.0

$6 5.

$2

6.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ur ve y

St at io n

$1

.0

$0 .0

$5

0.

$5 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ee p

G ro un dw at er

S am pl in g Ki t $4

.0

$0

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M

AG

S

K it

$5

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

Ai r S am pl in g

C an is te rs $2

.0

$0

.0

$0 .0

$7

0.

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$5 ,4

.0

$0

.0

$1 ,9

.0

$2

,6

.0

$7

.0

$4 0.

$0

.0

$0 .0

$0

.0

Su bt ot al

$1

,1

.6

$4 ,5

.6

$3

,2

.5

$3 9, 7.

$6

0, 0.

$5 ,4

.3

$5

,1

.4

$7 ,3

.4

$7

,7

.7

$4

.4

C om pl et io n Fe e $3

,9

.1

$4

.7

$2

.4

$8

.2

$1 ,2

.7

$2

.1

$6

7.

$3 0.

$7

.7

$4

7.

To ta l E st im at ed C os t

$1

,0

.8

$4 ,9

.3

$3

,4

.0

$4 0, 9.

$6

1, 0.

$5 ,7

.4

$5

,2

.1

$7 ,3

.4

$8

,5

.5

$5

.7

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Classic Cleaners of Ocala SUBTASK 2: HASP & Utility Clearance

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Review Health and Safety Plan 0.5 Scientist

Total Hours 0.5 D Phillips Senior Scientist Prepare Health and Safety Plan 2

Verification of property ownership, notify RPO of field activities 1 Obtain off-site access - 2 properties 6 Mobilization from Orlando to the site in Ocala and then to Gainesville 3.5 Utility clearance 2.5

Total Hours 15

TOTAL LABOR 15.5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Site Lines LLC Private Utility Location $800.00 1 $800.00

TOTAL $800.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 0 $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Determine which samples to run SPLP, confer with FDEP. 1

Scientist Evaluate geologic conditions based on boring logs and DPT sampling. 1.5 Total Hours 2.5

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Ocala 5 Soil Borings and DPT Sampling 44 DTW measurements & grab groundwater sampling at 4 wells 2

Total Hours 51 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 55.5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $16,710.00 1 $16,710.00

TOTAL $16,710.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

Method 8260 for Full list Soil $110.00 48 $5,280.00 SPLP Extractions $45.00 5 $225.00 Method 8260 for Full list Groundwater DPT $110.00 19 $2,090.00 Method 8260 Full list Grab samples from 4 MW's $110.00 4 $440.00 Method 8260 for SPLP $110.00 5 $550.00 IDW Method 8260 for Full List Soil $110.00 0 $0.00 IDW Encore Samplers $16.00 0 $0.00 IDW Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 1 $56.00 IDW Method 8260 for Full List Purge water $110.00 0 $0.00 IDW Method 6020 or 6010 for RCRA 4 Metals Water $56.00 0 $0.00 Encore Samplers $16.00 48 $768.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $9,759.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 5 $200.00 Soil Assessment Kit $700.00 Week 1 $700.00 Monitoring well Install Kit $325.00 Day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Ocala (2 trips) 10 Oversight of well installations 60

Total Hours 70 J. Penia 4

DTW measurement & Sampling Wells (8 shallow, 4 intermediate & 1 deep), containerize water 16 Total Hours 20

B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 92

VEHICLE TYPE RATE UNIT USAGE

Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP + DP $120.00 day 3 $360.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

TOTAL PER DIEM $1,002.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Preferred Drilling Solutions Well install 1 $37,425.00

TOTAL $37,425.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units Method 8260 Full list samples from MW's $110.00 13 $1,430.00 IDW Method 8260 for Full List Soil $110.00 5 $550.00 IDW Encore Samplers $16.00 5 $80.00 IDW Method 6020 or 6010 for RCRA 4 Metals Soil $56.00 5 $280.00 IDW Method 8260 for Full List Purge water $110.00 2 $220.00 IDW Method 6020 or 6010 for RCRA 4 Metals Water $56.00 2 $112.00 PFAS Samples to DEP Lab (3 wells & 1 IDW) $0.00 4 $0.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $2,742.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 6 $240.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00

TOTAL EQUIPMENT $2,681.00

$37,425.00

Associate Scientist

Round trip Mobilization from Tampa to the site in Ocala

SUBTASK 5: MAGS

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

R. Powell Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Analyze MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Ocala 4

Perform MAGS Testing 8 Total Hours 12

M. Wiss Technician Round trip Mobilization from Orlando to the site in Ocala 5 Perform MAGS Testing 8

Total Hours 13 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 33

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck M. Wiss $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel M. Wiss $150.00 day 1 $150.00 Per Diem M. Wiss $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate

SUBTASK 6: Professional Land Survey

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Ocala 4 PLS Oversight and aid in location of wells 4

Total Hours 8

TOTAL LABOR 9

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

SSMC Professional Land Survey $3,911.75 1 $3,911.75

TOTAL $3,911.75

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: IDW Management

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Schedule IDW transport and disposal 1

Total 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation PFAS Profile Fee $350.00 1 $350.00 Erwin Remediation IDW T&D Soil $195.00 23 $4,485.00 Erwin Remediation IDW T&D Water $195.00 8 $1,560.00

TOTAL $6,395.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 8: SAR Preparation

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Develop conclusions, recommendations, and prepare final Assessment Report 4

Scientist Total 4 R. Powell Senior Engineer Prepare the draft SAR MAGS section 6

Total 6 D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 30

QA/QC of analytical data 2 Total 32

J. Von Borstel GIS Analyst Revise and Update Figures 10 Total 10

B. Jarvis Administrative Update tables, Document Preparation & Publishing 4 Total 4

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBTASK 9: PFAS Report

DATE: 6/6/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Prepare PFAS Report 2 Total 2

J. Von Borstel GIS Analyst Prepare PFAS Figure 1 Total 1

B. Jarvis Administrative Prepare PFAS Table 1 Total 1

TOTAL LABOR 4

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

E P

C O S T

E S T I M A T E

C on tra ct or

En vi ro nm en ta l C on su lti ng

T ec hn ol og y, In c.

2/

Ta sk

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Pr of es si on al

L an d Su rv ey

Si te

C la ss ic C le an er s of O ca la

Su bT as k

H

AS

P

U til ity

C le ar an ce Su bT as k

ID

W

M an ag em en t

Ac tiv ity /P ha se

In iti al

S ite

A ss es sm en t (

Ta co

D el ta

Su bT as k

So il

Sa m

3l in g p ith D

PT

w ro un dp at er

S am

3l in g Su bT as k G

SA

P re

3a ra tio n

Pr oj ec t M an ag er

M ar k C ul br et h as k R

W el l I ns ta lla tio n w ro un dp at er S am 3l in g

Su bT as k

P9

A S e3 or t

Su bT as k

M

Aw S

Su bT as k

To ta ls

La bo r R at e C at eg or y

FG

R.

Pr oj ec t M an ag er

$5

.0 $5

.0

FG

R.

Se ni or P rin ci

3a l S ci en tis t (

M C

5.

5.

5.

F2 R.

5G Se ni or

E ng in ee r / S ci en tis t (

P+

5.

5.

5.

5.

F2 2.

Se ni or

E ng in ee r / S ci en tis t (

D P+

$R .5

5.

$6 .5

5.

F0 G.

RR

w

IS

A na ly st w ra

3h ic s (J

V

1.

5.

F0 R.

1G As so ci at e

E ng in ee r / S ci en tis t (

JP

5.

5.

F0

Te ch ni ci an

(M W

5.

F) R.

G1 Ad m in is tra tiv e

(B J+

1.

To ta l H ou rs

$0 .0

$5 .0

5.

$6 .5

5.

5.

R

D ire ct L

(F

7.

1)

(F

G+

F5 .5

(F

5.

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F1

7) .0

O ve rh ea d

2.

)5

(F

1.

(F

.2 R+

F5 .5

(F

R1

R4

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F0

.5

G w en

A dm in

5.

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

9r in ge R7

.R 5%

(F G)

.4 6+

(F 4.

F5 .5

(F

6.

R0

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

FG

0.

To ta l L

3.

v4

(F

.2 G+

F5 .5

(F

G4 4.

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

FR

.R

Tr aS el Ve hi cl e en ta l F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

Pe r d ie m x

H ot el F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

To ta l T ra ve l ,v

.v v

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

(u bc on tr ac to r

$E qu ip m en t P ro cu re m en t0 bc on tra ct or S ub to ta l

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

Pr oc ur em en t 9 ee F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

To ta l ( ub co nt ra ct or

C os t ,v

.v v

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

(u bc on tr ac to r er

Si ce s Pr oc ur em en t0 ril lin g

(C on ve nt io na l+ F)

.5

F5

.5

F)

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

Su rv ey in g

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

ID

W

F1 ,4

R2 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F1 ,4

R2 .5

F5

.5

F5 .5 w P8

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

Su bc on tra ct or

S ub to ta l F0

,0

.5

F5 .5

F)

.5

F5

.5

F5 .5

F5

.5

F1 ,4

R2 .5

F5

.5

F5 .5

H an dl in g 9e e F0

.0

F5

.5

F) 0.

F5

.5

F5 .5

F5

.5

F1 4R

.2

F5 .5

F5

.5

To ta l ( ub co nt ra ct or

C os t ,2

)4

.2 v

F5 .5

F)

.7

F5

.5

F5 .5

F5

.5

F0 ,1

)4 .2

F5

.5

F5 .5

La bo ra to ry

An al yt ic al C os ts

(F 2, GG

1.

F5 .5

(F

2, GG

1.

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

Sa m

3l e

S hi in g F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

To ta l L ab or at or y

5)

1.

vv

F5

.5

(F 2, GG

1.

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

Fi el d

Ex pe ns es

EK

3e nd ab le s F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

So il As se ss m en t Y it

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

M on ito rin g p el l I ns ta ll Yi t F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

Sh al lo p w ro un dp at er S am 3l in g

Yi t

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

Ic e

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

To ta l S ur ve y

St at io n

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

D ee w ro un dp at er S am 3l in g

Yi t

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

M Aw

S Y it F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

Ai r S am

3l in g C an is te rs

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

To ta l F ie ld

E xp en se s ,v

.v v

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

F5

.5

(u bt ot al

(F

G6 R.

GR

(F

.2 G+

F5 .5

(F

6, R0

1.

F5

.5

F5 .5

F5

.5

F0 ,1

)4 .2

F5

.5

FR

.R

C om pl et io n Fe e (F

RG

5+ (F

2.

F5

.5

(F G4

.4 4+

F5 .5

F5

.5

F5 .5

F5

.5

F5 .5

FR

7.

To ta l E st im at ed C os t

3)

3.

.1

,v .v v

6)

1.

2v

,v

.v v

,v .v v ,v

.v v

,2 )1

.5 v ,v

.v v

,5

.7 v

Pa

SUBTASY 0: HASP & Utility Clearance

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

M. Culbreth Senior Princi3al 8 eviep Health and Safety Plan 5 Scientist

Total Hours 5 D Philli3s Senior Scientist Pre3are Health and Safety Plan 5

Verification of 3ro3erty op nershi3, notify 8 PO of field activities 5 Obtain off$site access $ 0 3ro3erties 5 Mobilization from Orlando to the site in Ocala and then to wainesville 5 Utility clearance 5

Total Hours 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

8 ental Truck F105.55 day 5 F5.55

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T UNIT(

Site Lines LLC Private Utility Location FG55.55 5 F5.55

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC

TOTAL LAB F5.55

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

EK3endables FR5.55 Event 5 F5.55

TOTAL EQUIPMENT F5.55

SUBTASY ) : Soil Sam3ling p ith DPT & wroundp ater Sam3ling

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

M. Culbreth Senior Princi3al Determine p hich sam3les to run SPLP, confer p ith 9DEP. 5

Scientist Evaluate geologic conditions based on boring logs and DPT sam3ling. 5 Total Hours 5

D Philli3s Senior Scientist 8 ound tri3 Mobilization from Orlando to the site in Ocala 5 Soil Borings and DPT Sam3ling $6 DTW measurements & grab groundp ater sam3ling at R p ells 5

Total Hours $6 B. Jarvis Administrative Create tables and data entry 5

Total Hours 5

TOTAL LABOR $6

VEHICLE TYPE RATE UNIT U( AGE

8 ental Truck FRG5.55 p eek 5 F5.55

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

Hotel D Philli3s F125.55 day 5 F5.55 Per Diem D Philli3s F) 6.55 day 5 F5.55

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

wroundp ater Protection DPT Soil & wroundp ater Sam3ling F) 07.55 1 F) 07.55

TOTAL F) 07.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC UNIT(

Method G065 for 9ull list Soil F115.55 $1R (F1,2R5.55+ SPLP EKtractions FR2.55 $14 (FG22.55+ Method G065 for 9ull list wroundp ater DPT F115.55 $G (FGG5.55+ Method G065 9ull list wrab sam3les from R MW's F115.55 5 F5.55 Method G065 for SPLP F115.55 $14 (F0,545.55+ IDW Method G065 for 9ull List Soil F115.55 $1 (F115.55+ IDW Encore Sam3lers F16.55 $1 (F16.55+ IDW Method 6505 or 6515 for 8 C8 A R Metals Soil F26.55 5 F5.55 IDW Method G065 for 9ull List Purge p ater F115.55 $1 (F115.55+ IDW Method 6505 or 6515 for 8 C8 A R Metals Water F26.55 $1 (F26.55+ Encore Sam3lers F16.55 $1R (F00R.55+ Shi33ing Sam3les F75.55 5 F5.55

TOTAL LAB (F2,GG1.55+

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

EK3endables FR5.55 Day 5 F5.55 Soil Assessment Yit F755.55 Week 5 F5.55 Monitoring p ell Install Yit F) 02.55 Day 5 F5.55 Shallop wroundp ater Sam3ling Yit F045.55 Day 5 F5.55 Ice F6.25 each 5 F5.55 Total Survey Station F25.55 day 5 F5.55

TOTAL EQUIPMENT F5.55

SUBTASY R: Well Installation & wroundp ater Sam3ling

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

D Philli3s Senior Scientist 8 ound tri3 Mobilization from Orlando to the site in Ocala (0 tri3s+ 5 Oversight of pell installations 5

Total Hours 5 J. Penia 5

DTW measurement & Sam3ling Wells (G shallop , R intermediate & 1 dee3+, containerize pater 5 Total Hours 5

B. Jarvis Administrative Create tables and data entry 5

Total Hours 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

8 ental Truck DP FRG5.55 peek 5 F5.55 8 ental Truck JP x DP F105.55 day 5 F5.55

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

Hotel D Philli3s F125.55 day 5 F5.55 Per Diem D Philli3s F) 6.55 day 5 F5.55

Hotel J. Penia F125.55 day 5 F5.55 Per Diem J. Penia F) 6.55 day 5 F5.55

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T UNIT(

Preferred Drilling Solutions Well install 5 F5.55

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC Units Method G065 9ull list sam3les from MW's F115.55 5 F5.55 IDW Method G065 for 9ull List Soil F115.55 5 F5.55 IDW Encore Sam3lers F16.55 5 F5.55 IDW Method 6505 or 6515 for 8 C8 A R Metals Soil F26.55 5 F5.55 IDW Method G065 for 9ull List Purge pater F115.55 5 F5.55 IDW Method 6505 or 6515 for 8 C8 A R Metals Water F26.55 5 F5.55 Shi33ing Sam3les F75.55 5 F5.55

TOTAL LAB F5.55

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

EK3endables FR5.55 Day 5 F5.55 Monitoring pell Install Yit F1,) 55.55 Week 5 F5.55 Shallop wroundpater Sam3ling Yit F045.55 Day 5 F5.55 Ice F6.25 each 5 F5.55 Total Survey Station F25.55 day 5 F5.55 Dee3 wroundpater Sam3ling Yit FR12.55 Day 5 F5.55 wenerator F75.55 Day 5 F5.55

TOTAL EQUIPMENT F5.55

F) 7,R02.55

Associate

8 ound tri3 Mobilization from Tam3a to the site in Ocala

SUBTASY 2: MAwS

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

8 . Popell Senior Engineer P.E. oversight of MwAS events (Provide SOW, guidance, and ansper field question+ 5 Analyze MAwS data. 5

Total Hours 5 J. Penia 8 ound tri3 Mobilization from Tam3a to the site in Ocala 5

Perform MAwS Testing 5 Total Hours 5

M. Wiss Technician 8 ound tri3 Mobilization from Orlando to the site in Ocala 5 Perform MAwS Testing 5

Total Hours 5 B. Jarvis Administrative U3date tables 5

Total 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

8 ental Truck J. Penia F105.55 day 5 F5.55 8 ental Truck M. Wiss F105.55 day 5 F5.55

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

Hotel J. Penia F125.55 day 5 F5.55 Per Diem J. Penia F) 6.55 day 5 F5.55

Hotel M. Wiss F125.55 day 5 F5.55 Per Diem M. Wiss F) 6.55 day 5 F5.55

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC Units

USEPA Method TO$12 for VOHs F055.55 5 F5.55 Sam3ling Shi33ing Overnight F75.55 5 F5.55

TOTAL LAB F5.55

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

EK3endables FR5.55 Day 5 F5.55 MAwS Yit F255.55 Day 5 F5.55 Air Sam3ling Canisters F) ) .55 Day 5 F5.55

TOTAL EQUIPMENT F5.55

SUBTASY 6: Professional Land Survey

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

D. Philli3s Senior Scientist Coordinate and schedule p ith Surveyor 5 Total Hours 5

J. Penia Technician 8 ound tri3 Mobilize from Tam3a to the site in Ocala 5 PLS Oversight and aid in location of pells 5

Total Hours 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

8 ental Truck J. Penia F105.55 day 5 F5.55

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

SSMC Professional Land Survey F) ,411.72 5 F5.55

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC

TOTAL LAB F5.55

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

EK3endables FR5.55 Event 5 F5.55

SUBTASY 7: IDW Management

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

D. Philli3s Senior Scientist Characterization of paste to 3rofile soil & pater IDW drums for trans3ortation and dis3osal 5 Schedule IDW trans3ort and dis3osal 5

Total 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

Erp in 8 emediation P9AS Profile 9ee F) 25.55 1 F) 25.55 Erp in 8 emediation IDW T&D Soil P9AS U3charge FR2.55 0) F1,5) 2.55 Erp in 8 emediation IDW T&D Water P9AS U3charge F75.55 G F265.55

TOTAL F1,4R2.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC

TOTAL LAB F5.55

ENUIPME- T ITEM RATE CO( TING UNIT U( AGE TOTAL(

SUBTASY G: SA8 Pre3aration

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

M. Culbreth Senior Princi3al Develo3 conclusions, recommendations, and 3re3are final Assessment 8 e3ort 5

Scientist Total 5 8 . Popell Senior Engineer Pre3are the draft SA8 MAwS section 5

Total 5 D. Philli3s Senior Scientist Pre3are draft SA8 lithological section, create draft figures to be submitted for AutoCAD generatio 5

NA/NC of analytical data 5 Total 5

J. Von Borstel wIS Analyst 8 evise and U3date 9igures x P9AS 9igure 5 Total 5

B. Jarvis Administrative U3date tables, Document Pre3aration & Publishing 5 Total 5

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT U( AGE

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC

TOTAL LAB F5.55

SUBTASY 4: P9AS 8 e3ort

DATE: 6/2/0502

LABO8 CATEwO8 * QP8 OVIDE TIME 8 ENUI8 ED 9O8 EACH PE8 SO-

( TAFF-TITLE WORK DE( CRIPTION HOUR(

D. Philli3s Senior Scientist Pre3are P9AS 8 e3ort 0 Total 0

J. Von Borstel wIS Analyst 8 evise and U3date 9igures x P9AS 9igure 1 Total 1

B. Jarvis Administrative U3date tables, Document Pre3aration & Publishing 1 Total 1

TOTAL LABOR R

VEHICLE TYPE RATE UNIT U( AGE

TOTAL VEHICLE F5.55

PE8 DIEM ( TAFF RATE UNIT U( AGE

TOTAL PER DIEM F5.55

SUBCO- T8 ACTO8 COSTS

NAME PURPO( E CO( T

TOTAL F5.55

LABO8 ATO8 * COSTS

PARAMETER RATE # ( AMPLE( #QAQC

TOTAL LAB F5.55

E P

C O S T

E S T I M A T E

C on tra ct or

En vir on m en ta l C on su ltin g

Te ch no lo gy , I nc

/6

Ta sk as k

1r oP ec t j an ag em en t Su bT as k M

1r of es sio na l L an d

Su rv ey

Si te

C la ss ic C le an er s of O ca la

Su bT as k

H

AS

U til ity

C le ar an ce Su bT as k

ID

W j an ag em en t

Ac tiv ity /1 ha se

In itia l S ite A ss es sm en t ( O rig in al

T ac o 2)

Su bT as k

So il S am pl in g w ith D

1T

G ro un dw at er

S am pl in g Su bT as k

SA

R re pa ra tio n

1r oP ec t j an ag er j ar k C ul br et h as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

Su bT as k

Su bT as k j

AG

S

Su bT as k

To ta ls

9a

Lo br at R e at

RC

ob g F8

4.

yb oP

Rj trc aM aC

Rb r

.9

.9

F8 4.

Se ni or rin ci pa l S ci en tis t ( j

C

7.

0.

6.

F5 4.

Se ni or

E ng in ee r / S ci en tis t (

R 1)

.0

0.

0.

0.

M

M

F5

5.

Se ni or E ng in ee r /

S ci en tis t ( D

1)

7.

.0

.0

.0

F6

8.

G

IS

A na lys t /

G ra ph ic s

J)

0.

0.

F6

4.

As so ci at e En gi ne er

Sc ie nt ist

1)

.0

.0

F6

3.

Te ch ni ci an (j

W

.0

F3 4.

Ad m in ist ra tiv e

(V

.0

To ta lrn oH bs

8.

.9

.5

M2 .5

.0

.0

5M

D ire ct L

F2

4, 5.

F2 ,M

.3

F8

M7 .0

F3

,4

.0

F4 ,4

.6

F9

.6

M F6

.4

F2

.0

F6

,8

.8

O ve rh ea d

5.

B F2

8, 5.

F6 ,0

9M .7

F2

,0 8M

.4 M

F4 ,6

.0

M F5

,5

.6

F2 ,6

.0

F3

.3

F2

.8

F3

,5 M4

.5

G en

A dm in 0.

B

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

%r in ge

.4 0B

FM

,8

.4

F7

.2

M F4

.0

F2

,M

.7

F6 ,0

.2

F4

MM

.0

F2

.7

M F5

6.

F2 ,3

.4

To ta lr9 aL ob r u3

4.

F4

,5 M3

.6

F6 ,3

M4 .5

F9

,3

.8

F2 6, 7.

F6

,M

.3

FM

.5

F6

.9

F7 ,7

.7

Tb av

Rl Je hi cl e R en ta l F2

,M

.0

F0 .0

F4

.0

F8

.0

F6

.0

F2

.0

F0

.0

F0 .0

1e r d ie m

H ot el

F6 ,6

6M .0

F0

.0

F7

.0

F2 ,0

.0

F4

.0

F0

.0

F0 .0

F0

.0

To ta l T ra ve l u3

.0

F0 .0

F2

,6 M0

.0

F2 ,8

.0

FM

.0

F2

.0

F0

.0

F0 .0

SH

Lj oM tb aj to b (E qH ip m

RM

try bo jH bR m

RM

t) bc on tra ct or

S ub to ta l F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

1r oc ur em en t % ee F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

To ta lrS

HL

jo Mt ba jt ob re os t u0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

SH

Lj oM tb aj to b

(S Rb vi jR sr yb oj Hb

Rm

RM

t) ril lin g

(C on ve nt io na

l) F5

3, 8.

F0 .0

F2

M, 3.

F3 7, 5.

F0

.0

F0 .0

F0

.0

F0 .0

Su rv ey in g F3

,9

.7

F0 .0

F0

.0

F0 .0

F0

.0

F3 ,9

.7

F0

.0

F0 .0

ID

W

F4 ,4

.0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F4 ,4

.0

F0

.0

G

1R F8

.0

F8

.0

F0

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0

Su bc on tra ct or

S ub to ta l

FM

6, 9M

9.

F8

.0

F2 M, 3.

F3

7, 5.

F0 .0

F3

,9

.7

F4 ,4

.0

F0

.0

H an dl in g

%e e

FM

,6

9M .9

F8

0.

F2 ,M

.3

F3

,7

.5

F0 .0

F3

.2

F4

.0

F0

.0

To ta lrS

HL

jo

Mt ba jt ob re os t u6

6.

F8

.0

F2 8, 2.

F4

2, 2M

7.

F0 .0

F4

,3

.9

F4 ,8

.0

F0

.0

9a

Lo ba to bg

An al yt ic al

C os ts F2

9, 2M

6.

F0 .0

F2

5, 0.

F6 ,M

.0

F2

,6

.0

F0 .0

F0

.0

F0 .0

Sa m pl e

Sh ip pi ng

F5 M0

.0

F0 .0

F3

.0

F7

0.

F2

.0

F0 .0

F0

.0

F0 .0

To ta lr9 aL ob at ob g u1

2.

F0

.0

F2 5, M4 0.

F6

,7

.0

F2 ,3

.0

F0

.0

F0 .0

F0

.0

Fi

Rl dr

Ex pR

Ms Rs

Ex pe nd ab le s F5

.0

F0

.0

F6

.0

F6

.0

F4 0.

F4

0.

F0 .0

F0

.0

So il A ss es sm en t K it F7

.0

F0

.0

F7

.0

F0 .0

F0

.0

F0 .0

F0

.0

F0 .0 j on ito rin g w el l I ns ta ll K it

F2 ,9

.0

F0

.0

FM

.0

F2 ,3

.0

F0

.0

F0 .0

F0

.0

F0 .0

Sh al lo w

G ro un dw at er

S am pl in g Ki t F8

.0

F0

.0

F6

.0

F5

.0

F0 .0

F0

.0

F0 .0

F0

.0

Ic e F9

2.

F0 .0

FM

5.

F6 M.

F0

.0

F0 .0

F0

.0

F0 .0

To ta l S ur ve y

St at io n

F2

.0

F0 .0

F5

0.

F5 0.

F0

.0

F0 .0

F0

.0

F0 .0

D ee p G ro un dw at er S am pl in g

Ki t

F4

.0

F0 .0

F0

.0

F4

.0

F0 .0

F0

.0

F0 .0

F0

.0 j

AG

S

K it

F5

.0

F0 .0

F0

.0

F0 .0

F5

.0

F0

.0

F0 .0

F0

.0

Ai r S am pl in g C an ist er s

F6 M8

.0

F0 .0

F0

.0

F7 0.

F2

.0

F0

.0

F0 .0

F0

.0

To ta lrF iR ld rE xp

RM

sR s u5 ,4

.0

F0

.0

F2 ,9

.0

F6

,M

.0

F7

.0

F4 0.

F0

.0

F0 .0

SH

Lt ot al

F2

,9

.4

F4 ,5

M3 .6

F3

,6

.5

F4 M, 9.

FM

0, 0.

F5 ,4

.3

F5

,2

.4

F5 ,2

.9

F7

,7

.7 e om pl

Rt io

Mr

FR

R F3

,9

MM

.4

F4 5M

.3

F6 3M

.4 M

F9

.6

F2 ,6

.7

M F6

M8 .2

FM

7.

F3 0.

F7

.7

To ta lrE st im at

Rd re os t u1

3$ u5 ,0

1$ .5 u3

,4

.0 u4 7, 0.

u6

1, 0.

u5 ,7

.4 u5

,2

.1 u5 ,2 u8

,5

.5

Pa

SUVTASK 6: HAS1 & Utility Clearance

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S j . Culbreth Senior 1rincipal Review Health and Safety 1 lan 0.5 Scientist

Total Hours 0.5 D 1hillips Senior Scientist 1repare Health and Safety 1 lan 6

J erification of property ownership, notify R1O of field activities 2 Obtain off-site access - 6 properties M j obilization from Orlando to the site in Ocala and then to Gainesville 3.5 Utility clearance 6.5

Total Hours 25 TOTA9r9ABO 25.5

J EHICLE TYyE ATE UNIT USAGE Rental Truck F260.00 day 0 F0.00

TOTA9rVEnIe 9E F0.00 1ER DIEj STAFF ATE UNIT USAGE

TOTA9ryE rDIEc F0.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST UNITS Site Lines LLC 1rivate Utility Location F800.00 2 F800.00

TOTA9 F800.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe TOTA9r9AB F0.00

EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S Expendables F40.00 Event 0 F0.00

TOTA9rEQUIyc ENT F0.00

SUVTASK 3: Soil Sampling with D1T & Groundwater Sampling

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S j . Culbreth Senior 1rincipal Determine which samples to run S1L1, confer with %DE1. 2

Scientist Evaluate geologic conditions based on boring logs and D1T sampling. 2.5 Total Hours 6.5

D 1hillips Senior Scientist Round trip j obilization from Orlando to the site in Ocala 5 Soil Vorings and D1T Sampling 50 DTW measurements & grab groundwater sampling at 4 wells 6

Total Hours 57 V. $arvis Administrative Create tables and data entry 6

Total Hours 6

TOTA9r9ABO M2.5 J EHICLE TYyE ATE UNIT USAGE

Rental Truck F480.00 week 2 F480.00

TOTA9rVEnIe 9E F480.00 1ER DIEj STAFF ATE UNIT USAGE

Hotel D 1hillips F250.00 day 4 FM00.00 1er Diem D 1hillips F3M.00 day 5 F280.00

TOTA9ryE rDIEc F780.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST Groundwater 1rotection D1T Soil & Groundwater Sampling F2M,383.00 2 F2M,383.00

TOTA9 F2M,383.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe UNITS j ethod 86M0 for %ull list Soil F220.00 M6 FM,860.00 S1L1 Extractions F45.00 64 F2,080.00 j ethod 86M0 for %ull list Groundwater D1T F220.00 67 F6,970.00 j ethod 86M0 %ull list Grab samples from 4 j W's F220.00 4 F440.00 j ethod 86M0 for S1L1 F220.00 64 F6,M40.00 IDW j ethod 86M0 for %ull List Soil F220.00 2 F220.00 IDW Encore Samplers F2M.00 2 F2M.00 IDW j ethod M060 or M020 for RCRA 4 j etals Soil F5M.00 2 F5M.00 IDW j ethod 86M0 for %ull List 1urge water F220.00 2 F220.00 IDW j ethod M060 or M020 for RCRA 4 j etals Water F5M.00 2 F5M.00 Encore Samplers F2M.00 M6 F996.00 Shipping Samples F70.00 5 F350.00

TOTA9r9AB F25,M40.00 EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S

Expendables F40.00 Day 5 F600.00 Soil Assessment Kit F700.00 Week 2 F700.00 j onitoring well Install Kit F365.00 Day 6 FM50.00 Shallow Groundwater Sampling Kit F690.00 Day 2 F690.00 Ice FM.50 each 20 FM5.00 Total Survey Station F50.00 day 2 F50.00

TOTA9rEQUIyc ENT F2,955.00

SUVTASK 4: Well Installation & Groundwater Sampling

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S

D 1hillips Senior Scientist Round trip j obilization from Orlando to the site in Ocala (6 trips) 20 Oversight of well installations M0

Total Hours 70 $. 1enia 4

DTW measurement & Sampling Wells (8 shallow, 4 intermediate & 2 deep), containerize water 2M Total Hours 60

V. $arvis Administrative Create tables and data entry 6

Total Hours 6 TOTA9r9ABO 96

J EHICLE TYyE ATE UNIT USAGE Rental Truck D1 F480.00 week 2 F480.00 Rental Truck $1 + D1 F260.00 day 3 F3M0.00

TOTA9rVEnIe 9E F840.00 1ER DIEj STAFF ATE UNIT USAGE

Hotel D 1hillips F250.00 day 4 FM00.00 1er Diem D 1hillips F3M.00 day 5 F280.00

Hotel $. 1enia F250.00 day 2 F250.00 1er Diem $. 1enia F3M.00 day 6 F76.00

TOTA9ryE rDIEc F2,006.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST UNITS 1referred Drilling Solutions Well install 2 F37,465.00

TOTA9 F37,465.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe UMits j ethod 86M0 %ull list samples from j W's F220.00 23 F2,430.00 IDW j ethod 86M0 for %ull List Soil F220.00 5 F550.00 IDW Encore Samplers F2M.00 5 F80.00 IDW j ethod M060 or M020 for RCRA 4 j etals Soil F5M.00 5 F680.00 IDW j ethod 86M0 for %ull List 1urge water F220.00 6 F660.00 IDW j ethod M060 or M020 for RCRA 4 j etals Water F5M.00 6 F226.00 Shipping Samples F70.00 2 F70.00

TOTA9r9AB F6,746.00 EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S

Expendables F40.00 Day M F640.00 j onitoring well Install Kit F2,300.00 Week 2 F2,300.00 Shallow Groundwater Sampling Kit F690.00 Day 6 F580.00 Ice FM.50 each 4 F6M.00 Total Survey Station F50.00 day 2 F50.00 Deep Groundwater Sampling Kit F425.00 Day 2 F425.00 Generator F70.00 Day 2 F70.00

TOTA9rEQUIyc ENT F6,M82.00

F37,465.00

Associate

Round trip j obilization from Tampa to the site in Ocala

SUVTASK 5: j AGS

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S

R. 1owell Senior Engineer 1.E. oversight of j GAS events (1rovide SOW, guidance, and answer field question) 3 Analyze j AGS data. 3

Total Hours M $. 1enia Round trip j obilization from Tampa to the site in Ocala 4

1erform j AGS Testing 8 Total Hours 26 j . Wiss Technician Round trip j obilization from Orlando to the site in Ocala 5 1erform j AGS Testing 8

Total Hours 23 V. $arvis Administrative Update tables 6

Total 6 TOTA9r9ABO 33

J EHICLE TYyE ATE UNIT USAGE Rental Truck $. 1enia F260.00 day 6 F640.00 Rental Truck j . Wiss F260.00 day 6 F640.00

TOTA9rVEnIe 9E F640.00 1ER DIEj STAFF ATE UNIT USAGE

Hotel $. 1enia F250.00 day 2 F250.00 1er Diem $. 1enia F3M.00 day 6 F76.00

Hotel j . Wiss F250.00 day 2 F250.00 1er Diem j . Wiss F3M.00 day 6 F76.00

TOTA9ryE rDIEc F444.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST

TOTA9 F0.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe UMits

USE1A j ethod TO-25 for J OHs F600.00 M F2,600.00 Sampling Shipping Overnight F70.00 6 F240.00

TOTA9r9AB F2,340.00 EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S

Expendables F40.00 Day 2 F40.00 j AGS Kit F500.00 Day 2 F500.00 Air Sampling Canisters F33.00 Day M F298.00

TOTA9rEQUIyc ENT F738.00

SUVTASK M: 1rofessional Land Survey

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S

D. 1hillips Senior Scientist Coordinate and schedule with Surveyor 2 Total Hours 2

$. 1enia Technician Round trip j obilize from Tampa to the site in Ocala 4 1LS Oversight and aid in location of wells 4

Total Hours 8 TOTA9r9ABO 9

J EHICLE TYyE ATE UNIT USAGE Rental Truck $. 1enia F260.00 day 2 F260.00

TOTA9rVEnIe 9E F260.00 1ER DIEj STAFF ATE UNIT USAGE

TOTA9ryE rDIEc F0.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST SSj C 1rofessional Land Survey F3,922.75 2 F3,922.75

TOTA9 F3,922.75

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe TOTA9r9AB F0.00

EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S Expendables F40.00 Event 2 F40.00

TOTA9rEQUIyc ENT F40.00

SUVTASK 7: IDW j anagement

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S

D. 1hillips Senior Scientist Characterization of waste to profile soil & water IDW drums for transportation and disposal 2 Schedule IDW transport and disposal 2

Total 6 TOTA9r9ABO 6

J EHICLE TYyE ATE UNIT USAGE TOTA9rVEnIe 9E F0.00

1ER DIEj STAFF ATE UNIT USAGE TOTA9ryE rDIEc F0.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST

Erwin Remediation IDW T&D Soil F250.00 63 F3,450.00 Erwin Remediation IDW T&D Water F265.00 8 F2,000.00

TOTA9 F4,450.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe TOTA9r9AB F0.00

EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S TOTA9rEQUIyc ENT F0.00

SUVTASK 8: SAR 1reparation

DATE: 6/26/6065

LAVOR CATEGORY *1ROJ IDE TIj E REQUIRED %OR EACH 1ERSON STAFF-TIT9E WO KrDESe IyTION nOU S j . Culbreth Senior 1rincipal Develop conclusions, recommendations, and prepare final Assessment Report 4

Scientist Total 4 R. 1owell Senior Engineer 1repare the draft SAR j AGS section M

Total M D. 1hillips Senior Scientist 1repare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 30

QA/QC of analytical data 6 Total 36

$. J on Vorstel GIS Analyst Revise and Update %igures 20 Total 20

V. $arvis Administrative Update tables, Document 1reparation & 1ublishing 4 Total 4

TOTA9r9ABO 5M J EHICLE TYyE ATE UNIT USAGE

TOTA9rVEnIe 9E F0.00 1ER DIEj STAFF ATE UNIT USAGE

TOTA9ryE rDIEc F0.00

SUVCONTRACTOR COSTS

NAc E yU yOSE e OST

TOTA9 F0.00

LAVORATORY COSTS

yA Ac ETE ATE #rSAc y9ES #QAQe

TOTA9r9AB F0.00 EQUI1j ENT ITEc ATE e OSTINGrUNIT USAGE TOTA9S

TOTA9rEQUIyc ENT F0.00

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

Reason for Work Change Directive :

Description of Work Change Directive :

Attachments (if applicable, listdocuments supportingchange):

Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

AuthorizedContractorSignature:

AuthorizedFDEPSignature:

FDEP SupervisorApproval:

(if applicable)

REVISED DATE: 2/27/2025

ESTIMATE #: 624040-1

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 600.00$ 600.00$

1a each 600.00$ -$

2 4 night 300.00$ 1,200.00$

3 5 day 1,850.00$ 9,250.00$

4 1 each 750.00$ 750.00$

5 20 each 4.00$ 80.00$

6 27 each 4.00$ 108.00$

7 Materials: HDPE Tubing (per 500' Roll) 4 each 120.00$ 480.00$

8 Materials: Borehole Grouting w/Concrete Patch 12 each 15.00$ 180.00$

9 160 foot 4.00$ 640.00$

10 4 each 245.00$ 980.00$

11 Materials: 2" PVC Well Installation (Auger) 40 each 16.00$ 640.00$

12 1 each 200.00$ 200.00$

13 7 each 200.00$ 1,400.00$

14 4 each 50.00$ 200.00$

15 55 gallon drums (Soil) (Estimated) 3 each 75.00$ 225.00$

16 55 gallon drums (Water) (Estimated) 3 each 75.00$ 225.00$

17 Permits: SWFLWMD (up to 8 Wells Per App) 1 each 52.00$ 52.00$

Completion: Subtotal 17,210.00$

Todd Hodgson

TOTAL 17,210.00$

Partner

Client Requested Best 5 Day Effort

Damages to utilities on private property during borehole clearance are the responsibility of the client

3751 Maguire Blvd, Ste. 234

(2) DPT Borings to 30' w/Macrocore Sampling to Depth, Borehole Grouting (1 Grass/1 Asphalt)

(3) 2" x 10' PVC VEW w/8' of .010 Screen, 2' x 2' Pad w/8" BD Completion. Installed in Exterior SB's Above

(1) DPT Litho Boring to 55' bls (or Refusal w/Continuous Sampling. Borehole Grout/Rake Level (Grass)

(7) 420M Borings w/Sampling to ~10', (3 Inside/4 Outside). (3) Backfill w/Concrete Patch (4 to become VEW's)

(1) 2" x 10' PVC VEW w/8' of .010 Screen, Donut Pad w/5" BD Completion. Installed in Insterior SB's Above

CUSTOMER

Ocala, Marion County, Florida

DPT Soil and GW Sampling w/Well Installation

Daniel S. Phillips, P.G.

PROJECT

Classic Cleaners of Ocala 2641 SW College Road ECT

Orlando, Florida 32803

(407) 903-0005

Donut Pad w/5" BD Completion

Materials: Soil Sample Liners

(9) DPT GW Profiling Borings to 55' w/Sampling at 3 Intervals from GWT (31-35', 41-45', 51-55'). Borehole Grouting and Patch to Surface.

Materials: GW Sampling Points

Locations must be accessible with track mounted DPT Rig

(4) 1" x 40' PVC MW w/15' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling (DPT)

Materials: (3) 1" x 5' PVC .010 Slot Screen, 3" Exp Point

Shift Change (If Needed)

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

Daily Rate: DPT Rig w/ 2-man Crew

"Actual quantities used and days on site will be invoiced"

Client Requested 5 Day Best Effort to Complete SOW

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client

Per Diem - Est. 2 Man Crew Est. (Hotel Cost + $50/per man)

Materials: 1" PVC Well Installation

Well Development - MW Only (up to 1/2 hour w/Pump)

2' x 2' Concrete Pad w/8" BD Completion

420 M Dolly Rig w/Core Drill and Generator

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

REVISED DATE: 6/17/2024

ESTIMATE #: 624040

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 600.00$ 600.00$

1a each 600.00$ -$

2 4 night 300.00$ 1,200.00$

3 5 day 1,750.00$ 8,750.00$

4 1 each 750.00$ 750.00$

5 20 each 3.00$ 60.00$

6 27 each 3.00$ 81.00$

7 Materials: HDPE Tubing (per 500' Roll) 4 each 120.00$ 480.00$

8 Materials: Borehole Grouting w/Concrete Patch 12 each 15.00$ 180.00$

9 160 foot 4.00$ 640.00$

10 4 each 275.00$ 1,100.00$

11 Materials: 2" PVC Well Installation (Auger) 40 each 16.00$ 640.00$

12 1 each 150.00$ 150.00$

13 7 each 150.00$ 1,050.00$

14 4 each 50.00$ 200.00$

15 55 gallon drums (Soil) (Estimated) 3 each 75.00$ 225.00$

16 55 gallon drums (Water) (Estimated) 3 each 75.00$ 225.00$

17 Permits: SWFLWMD (up to 8 Wells Per App) 1 each 52.00$ 52.00$

Completion: Subtotal 16,383.00$

Todd Hodgson

TOTAL 16,383.00$

Partner

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

Daily Rate: DPT Rig w/ 2-man Crew

"Actual quantities used and days on site will be invoiced"

Client Requested 5 Day Best Effort to Complete SOW

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client

Per Diem - Est. 2 Man Crew Est. (Hotel Cost + $50/per man)

Materials: 1" PVC Well Installation

Well Development - MW Only (up to 1/2 hour w/Pump)

2' x 2' Concrete Pad w/8" BD Completion

420 M Dolly Rig w/Core Drill and Generator

Donut Pad w/5" BD Completion

Materials: Soil Sample Liners

(9) DPT GW Profiling Borings to 55' w/Sampling at 3 Intervals from GWT (31-35', 41-45', 51-55'). Borehole Grouting and Patch to Surface.

Materials: GW Sampling Points

Locations must be accessible with track mounted DPT Rig

(4) 1" x 40' PVC MW w/15' of .006 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling (DPT)

Materials: (3) 1" x 5' PVC .006 Slot Screen, 3" Exp Point

Shift Change (If Needed)

CUSTOMER

Ocala, Marion County, Florida

DPT Soil and GW Sampling w/Well Installation

Daniel S. Phillips, P.G.

PROJECT

Classic Cleaners of Ocala 2641 SW College Road ECT

Orlando, Florida 32803

(407) 903-0005

Client Requested Best 5 Day Effort

Damages to utilities on private property during borehole clearance are the responsibility of the client

3751 Maguire Blvd, Ste. 234

(2) DPT Borings to 30' w/Macrocore Sampling to Depth, Borehole Grouting (1 Grass/1 Asphalt)

(3) 2" x 10' PVC VEW w/8' of .010 Screen, 2' x 2' Pad w/8" BD Completion. Installed in Exterior SB's Above

(1) DPT Litho Boring to 55' bls (or Refusal w/Continuous Sampling. Borehole Grout/Rake Level (Grass)

(7) 420M Borings w/Sampling to ~10', (3 Inside/4 Outside). (3) Backfill w/Concrete Patch (4 to become VEW's)

(1) 2" x 10' PVC VEW w/8' of .010 Screen, Donut Pad w/5" BD Completion. Installed in Insterior SB's Above

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC024A 1 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4905

Classic Cleaners of Ocala

✔ $ 141,939.98 $ 142,659.27

$ 141,939.98 $ 142,659.27 ✔ Completion

Completion 11/21/2025 02/27/2026 98

✔ 1 1 3

Environmenta Consulting & Technology, Inc.

Contractor Mark A. Culbreth

Contract Manager

3/6/2025

Digitally signed by Mark Culbreth Date: 2025.03.06 16:05:25-05'00'Mark Culbreth

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2025.03.06 08:45:24 -05'00'

3/6/2025

This change order reconciles a cost decrease caused by a decrease in hours needed to travel to the site for Subtask 2 activities.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .