CN-370000-HW682-DC05BCO3.pdf
PDF 6 MB Posted
- Contract number
- HW682
- Issued by
- Florida
About this file
This document package consists of Task Assignment Change Orders (TACO 02 and TACO 03) for Contract HW682 between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The contract pertains to an initial site assessment of the Fashion Square Cleaners property located in Tampa, Florida, with project number ERIC_4742. The work is managed by FDEP Project Manager Karlee Fowler and ECT Contract Manager Mark A. Culbreth.
The contract covers eight subtasks including project management, health and safety planning, direct push testing and soil/groundwater sampling, well installation and sampling, mobile air gun sampling (MAGS) investigation, industrial waste (IDW) management, professional land survey, and site assessment report preparation. TACO 02, dated November 6, 2023, reduced the total contract value from $76,743.52 to $74,003.42 due to fewer wells installed than originally scoped and reduced IDW costs, with a completion date of March 1, 2024 (total of 92 days). TACO 03, dated February 9, 2024, further reduced costs by $5,324.00 to a final amount of $68,679.42 for 223 labor hours, reflecting reductions in MAGS samples collected and analyzed, laboratory costs, and IDW transport and disposal costs, with a completion date extended to March 15, 2024 (total of 34 days). The contract is structured as a fixed unit rate engagement with detailed deliverables and invoice schedules tied to FDEP approval of specific work products.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC005B 03 HW682
This Change Order authorizes a cost decrease related to a reduction in the number of MAGS samples collected and analyzed, reduced laboratory costs, and a reduction in IDW costs.
Karlee Fowler 850-245-8944 Contractor Contractor
Contractor Contractor
Contractor
Environmental Consulting and Technology, Inc. (ECT) Mark A. Culbreth 813-289-9338
ERIC_4742
Fashion Square Cleaners
✔ $ 68,679.42 $ 74,003.42
$ 68,679.42 $ 74,003.42 ✔ Completion
Completion✔ 03/15/2024 34
✔ 1 1 3
Mark Culbreth
Contract Manager
2/9/2024
Digitally signed by Mark Culbreth Date: 2024.02.09 12:28:18-05'00'Mark Culbreth
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.02.09 11:55:28 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW682
DC005B
$ 68,679.42
Email deliverable for GPR and Field Notes (Subtask 2)
Email deliverable DPT and Soil Sampling Field Notes (Subtask 3)
Email deliverable well installation and sampling Field Notes (Subtask 4)
Email deliverable for MAGS Field Notes (Subtask 5)
IDW Manifests and PLS (Subtask 6 and 7)
Site Assessment Report and PM (Subtask 8 and 1)
FDEP Approval of Email deliverable for GPR and Field Notes (Subtask 2)
FDEP Approval of Email deliverable well installation and sampling Field Notes (Subtask 4)
FDEP Approval of Email deliverable for MAGS Field Notes (Subtask 5)
FDEP Approval of SAR and PM (Subtask 8 and 1)
FDEP Approval of PLS and IDW Manifest (Subtask 6 and 7)
FDEP Approval of Email deliverable DPT and Soil Sampling Field Notes (Subtask 3)
02/02/2023
03/02/2023
11/06/2023
12/15/2023
02/23/2024
02/01/2024
$ 32,419.02
$ 2,582.20
$ 14,553.00
$ 6,289.56
$ 4,359.83
$ 8,475.81
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW682 Contract File Fashion Square Cleaners
ERIC_4742
Karlee Fowler, Project Manager Negotiation Summary Task Assignment DC005B-03 February 7, 2024
This Task Assignment Change Order reconciles a cost decrease related to a reduction of the number of MAGS samples collected and analyzed, and a reduction in laboratory costs, and a reduction in IDW transport and disposal costs.
The changes above result in an overall decrease of $5,324.00. The FDEP project manager agrees to the scope of work and final cost associated with the Task Assignment which is $68,679.42 for 223 labor hours.
FDEP COST ESTIMATE
Contractor: Environmental Consulting & Technology, Inc.
Date: 2/6/2024
Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Management
Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Land Survey
Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation
Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9
SubTask 5 MAGS SubTask 10
Totals 1 2 3 4 5 6 7 8
Labor Rate Category
$80.12 Project Manager 12.4 12.4 $80.12 Senior Principal Scientist (MC) 2 0 0 0 0 0 0 2
$52.89 Senior Engineer / Scientist (GS) 10 2 0 0 6 0 0 2
$55.00 Senior Engineer / Scientist (DP) 30 7 10 0 0 2 1 10
$34.02 Sr. Associate Engineer / Scientist (KM) 122 0 58 34.5 9.5 0 0 20
$26.54 GIS Analyst / Graphics (JV) 8 0 0 0 0 0 0 8
$21.54 Associate Engineer / Scientist (JP) 28 0 5 7.5 9.5 0 5.5 0
$31.45 Administrative (BJ) 11 0 4 2 1 0 0 4
Total Hours 223 12.4 9.0 77.0 44 26.0 2 6.5 46
Direct Labor $8,614.20 $991.01 $490.78 $2,739.65 $1,398.14 $876.61 $110.00 $173.47 $1,834.54
Overhead 125.30% $10,793.60 $1,241.74 $614.95 $3,432.78 $1,751.87 $1,098.39 $137.83 $217.36 $2,298.68
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $4,083.12 $469.74 $232.63 $1,298.59 $662.72 $415.51 $52.14 $82.22 $869.57
Total Labor $23,490.92 $2,702.49 $1,338.36 $7,471.02 $3,812.73 $2,390.51 $299.97 $473.05 $5,002.79
Travel
Vehicle Rental $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00
Total Travel $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Groundwater Protection $19,764.00 $0.00 $12,754.00 $7,010.00 $0.00 $0.00 $0.00 $0.00
SurvTech Solutions $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Erwin Remediation $3,045.00 $0.00 $0.00 $0.00 $0.00 $550.00 $2,495.00 $0.00
GeoView $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Remedaition Equipment Serv. $1,900.00 $0.00 $0.00 $0.00 $1,900.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $25,609.00 $900.00 $12,754.00 $7,010.00 $1,900.00 $550.00 $2,495.00 $0.00
Handling Fee $2,560.90 $90.00 $1,275.40 $701.00 $190.00 $55.00 $249.50 $0.00
Total Subcontractor Cost $28,169.90 $990.00 $14,029.40 $7,711.00 $2,090.00 $605.00 $2,744.50 $0.00
Laboratory
Analytical Costs $9,530.00 $0.00 $8,070.00 $660.00 $800.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $110.00 $0.00 $0.00 $0.00 $110.00 $0.00 $0.00 $0.00
Sample Shipping $350.00 $0.00 $280.00 $70.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $9,990.00 $0.00 $8,350.00 $730.00 $910.00 $0.00 $0.00 $0.00
Field Expenses
Expendables $480.00 $40.00 $200.00 $160.00 $40.00 $0.00 $40.00 $0.00 Soil Assessment Kit $1,675.00 $0.00 $700.00 $975.00 $0.00 $0.00 $0.00 $0.00
Shallow Groundwater Sampling Kit $580.00 $0.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00
Ice $84.50 $0.00 $71.50 $13.00 $0.00 $0.00 $0.00 $0.00
MAGS Investigation Kit $500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $0.00 $0.00
Total Field Expenses $3,319.50 $40.00 $1,261.50 $1,438.00 $540.00 $0.00 $40.00 $0.00
Subtotal $66,330.32 $2,702.49 $2,448.36 $31,671.92 $14,171.73 $6,050.51 $904.97 $3,377.55 $5,002.79
Completion Fee $2,349.10 $270.25 $133.84 $747.10 $381.27 $239.05 $30.00 $47.31 $500.28
Total Estimated Cost $68,679.42 $2,972.74 $2,582.20 $32,419.02 $14,553.00 $6,289.56 $934.97 $3,424.86 $5,503.07
Cost from Prior CEF: $74,003.42 Manual Entry
Cost from Delta CEF; ($5,324.00) Manual Entry
Cost (Prior + Delta): $68,679.42 Auto-Calculated
Rounding Error: $0.00 Auto-Calculated
Final Total Cost: $68,679.42 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Fashion Square Cleaners SUBTASK 2: HASP & Utility Clearance
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Total Hours 2
D Phillips Senior Scientist Round-Trip Mobilize from Orlando to the site in Tampa 3 Utility clearance 4
Total Hours 7
TOTAL LABOR 9
VEHICLE TYPE RATE UNIT USEAGE
Rental Car $80.00 day 1 $80.00
TOTAL VEHICLE $80.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GeoView Private Utility Location 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
$900.00
FINAL --7/24/96
SUBTASK 3:DPT Soil & Groundwater Sampling
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D PhillipsSenior ScientistVerification of property ownership, notify RPO of field activities 1
Round-Trip Mobilize from Orlando to the site in Tampa 4
Discuss scope of work and Health and Safety Plan 0
Litho Borings and DPT Sampling (0.5 day) 5
Total Hours 10
K. MorrisonSr. Associate ScientistRound-Trip Mobilizations from Tampa office to the site 7.5
Soil Borings and DPT Sampling 50
Total Hours 57.5
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5
Open Well and collect DTW at 3 wells 0.5
Groundwater Sampling (3 wells) 3
Total Hours 5
B. Jarvis AdministrativeCreate tables and data entry 4
Total Hours 4
TOTAL LABOR 76.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
Rental Car $80.00 day 1 $80.00
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $560.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $12,754.00 1 $12,754.00
TOTAL $12,754.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
SPLP Extractions $45.00 0 $0.00
USEPA Method 8260 for VOHs IDW $73.00 0 $0.00
USEPA Method 8270 for PAHs IDW $110.00 0 $0.00
USEPA Method 6020 for Arsnic IDW $14.00 0 $0.00
USEPA Method 6020 for Cadmiumn IDW $14.00 0 $0.00
USEPA Method 6020 for Chromium IDW $14.00 0 $0.00
USEPA Method 6020 for Lead IDW $14.00 0 $0.00
Shipping Samples $70.00 4 $280.00
Encore Samplers $10.00 37 $370.00
USEPA Method 8260 for VOHs Soil SBs $110.00 37 $4,070.00
USEPA Method 8260 for VOHs Sediment SDs$110.00 0 $0.00
USEPA Method 8260 for VOHs Groundwater DPT$110.00 30 $3,300.00
USEPA Method 8260 for VOHs Catch Basin Surface Water SWs$110.00 0 $0.00
USEPA Method 8260 Grab Water Samples MW001 - MW003$110.00 0 $0.00
USEPA Method 8260 for SPLP $110.00 0 $0.00
USEPA Method 8260 MW001 thourgh MW003 GW Samples$110.00 3 $330.00
TOTAL LAB $8,350.00
EQUIPMENTITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Soil Assessment Kit $700.00 week 1 $700.00
Shallow Groundwater Sampling Kit$290.00 day 1 $290.00
Ice $6.50 each 11 $71.50
TOTAL EQUIPMENT $1,261.50
SUBTASK 4: Well Installation & Sampling
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
K. Morrison Sr. Associate ScientistMobilize from Tampa to the site 4.5 Oversight for Well Installations 30
Total Hours 34.5 J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5
Open Well and collect DTW at 8 wells 1 Groundwater Sampling (5 wells) 5
Total Hours 7.5 B. Jarvis Administrative Update tables 2
Total Hours 2
TOTAL LABOR 44
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck K. Morrison $120.00 day 3 $360.00 Rental Truck J. Penia $120.00 day 1 $120.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Well installations 1 $7,010.00
TOTAL $7,010.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA 8260 full list Groundwater MWs $110.00 4 $440.00 USEPA 8260 full list Groundwater IDW $110.00 2 $220.00 USEPA Method 8260 for PAHs IDW $110.00 0 $0.00 USEPA Method 6020 for Arsnic IDW $14.00 0 $0.00 USEPA Method 6020 for Cadmiumn IDW $14.00 0 $0.00 USEPA Method 6020 for Chromium IDW $14.00 0 $0.00 USEPA Method 6020 for Lead IDW $14.00 0 $0.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $730.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $325.00 day 3 $975.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 2 $13.00
TOTAL EQUIPMENT $1,438.00
$7,010.00
SUBTASK 5: MAGS
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Deveolpe MAGS Plan and provide remote P.E. assistance 3 Check MAGS data. 3
Total Hours 6 K. Morrison Sr. Associate ScientistRound-Trip Mobilization from Tampa office to the site 1.5
MAGS Testing 8 Total Hours 9.5
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5 MAGS Testing 8
Total Hours 9.5 B. Jarvis Administrative Update tables 1
Total Hours 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Remediation Equipment Services MAGS Testing $1,900.00 $1,900.00
TOTAL $1,900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA Method TO-15 for VOHs $200.00 4 $800.00 Sampling Shipping Overnight $110.00 1 $110.00
TOTAL LAB $910.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Investigation Kit $500.00 Day 1 $500.00
TOTAL EQUIPMENT $540.00
SUBTASK 6: IDW Management
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Characterization and waste profile for transportation and disposal of IDW drum(s) 1
Schedule IDW transport and disposal 1 Total Hours 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $110.00 5 $550.00
TOTAL $550.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 7: Professional Land Survey
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Verification professional land survey for completeness & accruracy 1
Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa office to the site 1.5
PLS Oversight 4 Total Hours 5.5
TOTAL LABOR 5.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
SurvTech Solutions Professional Land Survey $2,495.00 1 $2,495.00
TOTAL $2,495.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
SUBTASK 8: SAR Preparation
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScienDevelop conclusions and recommendations and prepare final Assessment Report 2
Total Hours 2 G. Sattler Senior Engineer Develop conclusions and recommendations and prepare for the MAGS section 2
Total Hours 2 D. Phillips Senior Scientist QA/QC check of soil & groundwater lab data 2
Prepare draft SAR lithological section, create draft figures 8
Total Hours 10 K. Morrison r. Associate Scient Prepare the draft SAR 20
Total Hours 20 J. Von Borstel GIS Analyst Creat and update figures 8
Total Hours 8 B. Jarvis Administrative Create and update tables 4
Total Hours 4
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
Date: 2/6/2024
Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Management
Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Land Survey
Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation
Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9
SubTask 5 MAGS SubTask 10
Totals 1 2 3 4 5 6 7 8
Labor Rate Category
$80.12 Project Manager 0.00 0.00 $80.12 Senior Principal Scientist (MC) 0 0 0 0 0 0 0 0
$52.89 Senior Engineer / Scientist (GS) 0 0 0 0 0 0 0 0.0
$55.00 Senior Engineer / Scientist (DP) 0 0 0 0 0 0 0 0.0
$34.02 Sr. Associate Engineer / Scientist (KM) 0 0.0 0 0 0 0 0 0.0
$26.54 GIS Analyst / Graphics (JV) 0 0 0 0 0 0 0 0.0
$21.54 Associate Engineer / Scientist (JP) 0 0 0 0 0 0 0 0.0
$31.45 Administrative (BJ) 0 0 0 0 0 0 0 0.0
Total Hours 0.0 0.00 0.0 0.0 0 0 0 0 0.0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 125.30% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Groundwater Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SurvTech Solutions $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Erwin Remediation ($440.00) $0.00 $0.00 $0.00 $0.00 ($440.00) $0.00 $0.00
GeoView $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Remedaition Equipment Serv. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($440.00) $0.00 $0.00 $0.00 $0.00 ($440.00) $0.00 $0.00
Handling Fee ($44.00) $0.00 $0.00 $0.00 $0.00 ($44.00) $0.00 $0.00
Total Subcontractor Cost ($484.00) $0.00 $0.00 $0.00 $0.00 ($484.00) $0.00 $0.00
Laboratory
Analytical Costs ($4,840.00) $0.00 ($3,584.00) ($56.00) ($1,200.00) $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory ($4,840.00) $0.00 ($3,584.00) ($56.00) ($1,200.00) $0.00 $0.00 $0.00
Field Expenses
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Soil Assessment Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Ice $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
MAGS Investigation Kit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($5,324.00) $0.00 $0.00 ($3,584.00) ($56.00) ($1,200.00) ($484.00) $0.00 $0.00
Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($5,324.00) $0.00 $0.00 ($3,584.00) ($56.00) ($1,200.00) ($484.00) $0.00 $0.00
Cost from Prior CEF: Manual Entry
Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated
Rounding Error: ($5,324.00) Auto-Calculated
Final Total Cost: ($5,324.00) Auto-Calculated
SUBTASK 3: DPT Soil & Groundwater Sampling
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 0
Round-Trip Mobilize from Orlando to the site in Tampa 0
Litho Borings and DPT Sampling (0.5 day) 0
Total Hours 0
K. Morrison Sr. Associate Scientist Round-Trip Mobilizations from Tampa office to the site 0
Soil Borings and DPT Sampling 0
Total Hours 0
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 0
Open Well and collect DTW at 3 wells 0
Groundwater Sampling (3 wells) 0
Total Hours 0
B. Jarvis Administrative Create tables and data entry 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 0 $0.00
Rental Car $80.00 day 0 $0.00
Rental Truck $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $0.00 1 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
SPLP Extractions $45.00 -15 ($675.00)
USEPA Method 8260 for VOHs IDW $73.00 -1 ($73.00)
USEPA Method 8270 for PAHs IDW $110.00 -1 ($110.00)
USEPA Method 6020 for Arsnic IDW $14.00 -1 ($14.00)
USEPA Method 6020 for Cadmiumn IDW $14.00 -1 ($14.00)
USEPA Method 6020 for Chromium IDW $14.00 -1 ($14.00)
USEPA Method 6020 for Lead IDW $14.00 -1 ($14.00)
Shipping Samples $70.00 0 $0.00
Encore Samplers $10.00 -3 ($30.00)
USEPA Method 8260 for VOHs Soil SBs $110.00 -3 ($330.00)
USEPA Method 8260 for VOHs Sediment SDs $110.00 -1 ($110.00)
USEPA Method 8260 for VOHs Groundwater DPT $110.00 0 $0.00
USEPA Method 8260 for VOHs Catch Basin Surface Water SWs $110.00 -1 ($110.00)
USEPA Method 8260 DPT Grab Water Samples MW001 - MW003 $110.00 -15 ($1,650.00)
USEPA Method 8260 for SPLP $110.00 -4 ($440.00)
USEPA Method 8260 MW001 thourgh MW003 GW Samples $110.00 0 $0.00
TOTAL LAB ($3,584.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00
Soil Assessment Kit $700.00 week 0 $0.00
Shallow Groundwater Sampling Kit $290.00 day 0 $0.00
Ice $6.50 each 0 $0.00
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
K. Morrison Sr. Associate ScientistMobilize from Tampa to the site 0 Oversight for Well Installations 0
Total Hours 0 J. Penia Technician Round-Trip Mobilization from Tampa office to the site 0
Open Well and collect DTW at 8 wells 0 Groundwater Sampling (5 wells) 0
Total Hours 0 B. Jarvis Administrative Update tables 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck K. Morrison $120.00 day 0 $0.00 Rental Truck J. Penia $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Well installations $0.00 1 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA 8260 full list Groundwater MWs $110.00 -1 ($110.00) USEPA 8260 full list Groundwater IDW $110.00 2 $220.00 USEPA Method 8260 for PAHs IDW $110.00 -1 ($110.00) USEPA Method 6020 for Arsnic IDW $14.00 -1 ($14.00) USEPA Method 6020 for Cadmiumn IDW $14.00 -1 ($14.00) USEPA Method 6020 for Chromium IDW $14.00 -1 ($14.00) USEPA Method 6020 for Lead IDW $14.00 -1 ($14.00) Shipping Samples $70.00 0 $0.00
TOTAL LAB ($56.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0 $0.00 Monitoring well Install Kit $325.00 day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 day 0 $0.00 Ice $6.50 each 0 $0.00
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Deveolpe MAGS Plan and provide remote P.E. assistance 0 Check MAGS data. 0
Total Hours 0 K. Morrison Sr. Associate ScientistRound-Trip Mobilization from Tampa office to the site 0
MAGS Testing 0 Total Hours 0
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 0 MAGS Testing 0
Total Hours 0 B. Jarvis Administrative Update tables 0
Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Remediation Equipment Services MAGS Testing $0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA Method TO-15 for VOHs $200.00 -6 ($1,200.00) Sampling Shipping Overnight $110.00 0 $0.00
TOTAL LAB ($1,200.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 MAGS Investigation Kit $500.00 Day 0 $0.00
DATE: 2/6/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Characterization and waste profile for transportation and disposal of IDW drum(s) 0
Schedule IDW transport and disposal 0 Total Hours 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $110.00 -4 ($440.00)
TOTAL ($440.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
Date: 1/25/2024
Task #: DC005B SubTask 1 Project Management SubTask 6 IDW Management
Site: Fashion Square Cleaners SubTask 2 HASP & Utility Clearance SubTask 7 Professional Land Survey
Activity/Phase: Initial Site Assessment SubTask 3 DPT Soil & Groundwater Sampling SubTask 8 SAR Preparation
Project Manager: Mark Culbreth SubTask 4 Well Installation & Sampling SubTask 9
SubTask 5 MAGS SubTask 10
Totals 1 2 3 4 5 6 7 8
Labor Rate Category
$80.12 Project Manager 12 12.4 $80.12 Senior Principal Scientist (MC) 2 0 0 0 0 0 0 2
$52.89 Senior Engineer / Scientist (GS) 10 2 0 0 6 0 0 2
$55.00 Senior Engineer / Scientist (DP) 30 7 10 0 0 2 1 10
$34.02 Sr. Associate Engineer / Scientist (KM) 122 0.0 57.5 34.5 9.5 0 0 20
$26.54 GIS Analyst / Graphics (JV) 8 0 0 0 0 0 0 8
$21.54 Associate Engineer / Scientist (JP) 28 0 5 7.5 9.5 0 5.5 0
$31.45 Administrative (BJ) 11 0 4 2 1 0 0 4
Total Hours 222 12.4 9.0 76.50 44.0 26.0 2.0 6.5 46
Direct Labor $8,614.20 $991.01 $490.78 $2,739.65 $1,398.14 $876.61 $110.00 $173.47 $1,834.54
Overhead 125.30% $10,793.60 $1,241.74 $614.95 $3,432.78 $1,751.87 $1,098.39 $137.83 $217.36 $2,298.68
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $4,083.12 $469.74 $232.63 $1,298.59 $662.72 $415.51 $52.14 $82.22 $869.57
Total Labor $23,490.92 $2,702.49 $1,338.36 $7,471.02 $3,812.73 $2,390.51 $299.97 $473.05 $5,002.79
Travel
Vehicle Rental $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00
Total Travel $1,360.00 $80.00 $560.00 $480.00 $120.00 $0.00 $120.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Groundwater Protection $19,764.00 $0.00 $12,754.00 $7,010.00 $0.00 $0.00 $0.00 $0.00
SurvTech Solutions $2,495.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,495.00 $0.00
Erwin Remediation $990.00 $0.00 $0.00 $0.00 $0.00 $990.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GeoView $900.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Remedaition Equipment Serv. $1,900.00 $0.00 $0.00 $0.00 $1,900.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $26,049.00 $900.00 $12,754.00 $7,010.00 $1,900.00 $990.00 $2,495.00 $0.00
Handling Fee $2,604.90 $90.00 $1,275.40 $701.00 $190.00 $99.00 $249.50 $0.00
Total Subcontractor Cost $28,653.90 $990.00 $14,029.40 $7,711.00 $2,090.00 $1,089.00 $2,744.50 $0.00
Laboratory
Analytical Costs $14,370.00 $0.00 $11,654.00 $716.00 $2,000.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $110.00 $0.00 $0.00 $0.00 $110.00 $0.00 $0.00 $0.00
Sample Shipping $350.00 $0.00 $280.00 $70.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $14,830.00 $0.00 $11,934.00 $786.00 $2,110.00 $0.00 $0.00 $0.00
Field Expenses
Expendables $480.00 $40.00 $200.00 $160.00 $40.00 $0.00 $40.00 $0.00 Soil Assessment Kit $1,675.00 $0.00 $700.00 $975.00 $0.00 $0.00 $0.00 $0.00
Shallow Groundwater Sampling Kit $580.00 $0.00 $290.00 $290.00 $0.00 $0.00 $0.00 $0.00
Ice $84.50 $0.00 $71.50 $13.00 $0.00 $0.00 $0.00 $0.00
MAGS Investigation Kit $500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $0.00 $0.00
Total Field Expenses $3,319.50 $40.00 $1,261.50 $1,438.00 $540.00 $0.00 $40.00 $0.00
Subtotal $71,654.32 $2,702.49 $2,448.36 $35,255.92 $14,227.73 $7,250.51 $1,388.97 $3,377.55 $5,002.79
Completion Fee $2,349.10 $270.25 $133.84 $747.10 $381.27 $239.05 $30.00 $47.31 $500.28
Total Estimated Cost $74,003.42 $2,972.74 $2,582.20 $36,003.02 $14,609.00 $7,489.56 $1,418.97 $3,424.86 $5,503.07
Cost from Prior CEF: Manual Entry
Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated
Rounding Error: $74,003.42 Auto-Calculated
Final Total Cost: $74,003.42 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 2: HASP & Utility Clearance
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Prepare Health and Safety Plan 2 Total Hours 2
D Phillips Senior Scientist Round-Trip Mobilize from Orlando to the site in Tampa 3 Utility clearance 4
Total Hours 7
TOTAL LABOR 9
VEHICLE TYPE RATE UNIT USEAGE
Rental Car $80.00 day 1 $80.00
TOTAL VEHICLE $80.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GeoView Private Utility Location 1 $900.00
TOTAL $900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
$900.00
FINAL --7/24/96
SUBTASK 3: DPT Soil & Groundwater Sampling
DATE: 1/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1
Round-Trip Mobilize from Orlando to the site in Tampa 4
Discuss scope of work and Health and Safety Plan 0
Litho Borings and DPT Sampling (0.5 day) 5
Total Hours 10
K. Morrison Sr. Associate ScientistRound-Trip Mobilizations from Tampa office to the site 7.5
Soil Borings and DPT Sampling 50
Total Hours 57.5
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5
Open Well and collect DTW at 3 wells 0.5
Groundwater Sampling (3 wells) 3
Total Hours 5
B. Jarvis Administrative Create tables and data entry 4
Total Hours 4
TOTAL LABOR 76.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $480.00 week 1 $480.00
Rental Car $80.00 day 1 $80.00
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $560.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Soil & Groundwater Sampling $12,754.00 1 $12,754.00
TOTAL $12,754.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
SPLP Extractions $45.00 15 $675.00
USEPA Method 8270 for VOHs IDW $73.00 1 $73.00
USEPA Method 8260 for PAHs IDW $110.00 1 $110.00
USEPA Method 6020 for Arsnic IDW $14.00 1 $14.00
USEPA Method 6020 for Cadmiumn IDW $14.00 1 $14.00
USEPA Method 6020 for Chromium IDW $14.00 1 $14.00
USEPA Method 6020 for Lead IDW $14.00 1 $14.00
Shipping Samples $70.00 4 $280.00
Encore Samplers $10.00 40 $400.00
USEPA Method 8260 for VOHs Soil SBs $110.00 40 $4,400.00
USEPA Method 8260 for VOHs Sediment SDs $110.00 1 $110.00
USEPA Method 8260 for VOHs Groundwater DPT $110.00 30 $3,300.00
USEPA Method 8260 for VOHs Catch Basin Surface Water SWs$110.00 1 $110.00
USEPA Method 8260 DPT Grab Water Samples MW001 - MW003$110.00 15 $1,650.00
USEPA Method 8260 for SPLP $110.00 4 $440.00
USEPA Method 8260 MW001 thourgh MW003 GW Samples$110.00 3 $330.00
TOTAL LAB $11,934.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Soil Assessment Kit $700.00 week 1 $700.00
Shallow Groundwater Sampling Kit $290.00 day 1 $290.00
Ice $6.50 each 11 $71.50
TOTAL EQUIPMENT $1,261.50
DATE: 1/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
K. Morrison Sr. Associate ScientistMobilize from Tampa to the site 4.5 Oversight for Well Installations 30
Total Hours 34.5 J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5
Open Well and collect DTW at 8 wells 1 Groundwater Sampling (5 wells) 5
Total Hours 7.5 B. Jarvis Administrative Update tables 2
Total Hours 2
TOTAL LABOR 44
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck K. Morrison $120.00 day 3 $360.00 Rental Truck J. Penia $120.00 day 1 $120.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection DPT Well installations 1 $7,010.00
TOTAL $7,010.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA 8260 full list Groundwater MWs $110.00 5 $550.00 USEPA Method 8260 for PAHs IDW $110.00 1 $110.00 USEPA Method 6020 for Arsnic IDW $14.00 1 $14.00 USEPA Method 6020 for Cadmiumn IDW $14.00 1 $14.00 USEPA Method 6020 for Chromium IDW $14.00 1 $14.00 USEPA Method 6020 for Lead IDW $14.00 1 $14.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $786.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 4 $160.00 Monitoring well Install Kit $325.00 day 3 $975.00 Shallow Groundwater Sampling Kit $290.00 day 1 $290.00 Ice $6.50 each 2 $13.00
TOTAL EQUIPMENT $1,438.00
$7,010.00
DATE: 1/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Deveolpe MAGS Plan and provide remote P.E. assistance 3 Check MAGS data. 3
Total Hours 6 K. Morrison Sr. Associate ScientistRound-Trip Mobilization from Tampa office to the site 1.5
MAGS Testing 8 Total Hours 9.5
J. Penia Technician Round-Trip Mobilization from Tampa office to the site 1.5 MAGS Testing 8
Total Hours 9.5 B. Jarvis Administrative Update tables 1
Total Hours 1
TOTAL LABOR 26
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Remediation Equipment Services MAGS Testing $1,900.00 $1,900.00
TOTAL $1,900.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
USEPA Method TO-15 for VOHs $200.00 10 $2,000.00 Sampling Shipping Overnight $110.00 1 $110.00
TOTAL LAB $2,110.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00 MAGS Investigation Kit $500.00 Day 1 $500.00
TOTAL EQUIPMENT $540.00
DATE: 1/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Characterization and waste profile for transportation and disposal of IDW drum(s) 1
Schedule IDW transport and disposal 1 Total Hours 2
TOTAL LABOR 2
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D Soil $110.00 9 $990.00
TOTAL $990.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBTASK 7: Professional Land Survey
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist Verification professional land survey for completeness & accruracy 1
Total Hours 1 J. Penia Technician Round trip Mobilize from Tampa office to the site 1.5
PLS Oversight 4 Total Hours 5.5
TOTAL LABOR 5.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
SurvTech Solutions Professional Land Survey $2,495.00 1 $2,495.00
TOTAL $2,495.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 1 $40.00
TOTAL EQUIPMENT $40.00
SUBTASK 8: SAR Preparation
DATE: 6/20/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal ScienDevelop conclusions and recommendations and prepare final Assessment Report 2
Total Hours 2 G. Sattler Senior Engineer Develop conclusions and recommendations and prepare for the MAGS section 2
Total Hours 2 D. Phillips Senior Scientist QA/QC check of soil & groundwater lab data 2
Prepare draft SAR lithological section, create draft figures 8
Total Hours 10 K. Morrison r. Associate Scient Prepare the draft SAR 20
Total Hours 20 J. Von Borstel GIS Analyst Creat and update figures 8
Total Hours 8 B. Jarvis Administrative Create and update tables 4
Total Hours 4
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Gregory Sattler Environmental Consulting & Technology, Inc.
3751 Maguire Boulevard, Suite 234 Orlando, Florida 32803
August 26, 2022
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 70.00 Per Stop T&D - Non-Haz Soil, Mud or Water $ 110.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
A single False Mobilization fee will apply if our driver is not able to locate any drum on site.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com Office: (850) 292-6511
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC005B 2 HW682
This Change Order authorizes a cost reduction as the number of wells installed was less than the original scope. IDW costs were also less than anticipated.
Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_4742
Fashion Square Cleaners
$ 74,003.42 $ 76,743.52
$ 74,003.42 $ 76,743.52
11/30/2023 03/01/2024 92
1 1 2
Mark Culbreth
Vice President
11/6/2023
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.11.05 06:56:57 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST