About this file
This Task Assignment (TA) DC022A is executed between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT), pursuant to Contract Number HW682. The agreement governs work at the Walgreens Store site located at 7212 Merrill Road, Jacksonville, Duval County, Florida (ERIC_4599). The Department Project Manager is Ginger Shirah (850-245-8899), and the Contractor's Project Manager is Mark A. Culbreth (813-289-9338). The TA is effective through June 7, 2024, and was signed by Gregory L. Sattler (Deputy Contract Manager for ECT) and Kelly Crain (Secretary or Designee for FDEP) on September 14, 2023.
ECT is authorized to perform annual groundwater monitoring activities consisting of three subtasks: Project Management, Groundwater Sampling and Analysis, and Investigation Derived Waste (IDW) Management. Subtask 2 includes measuring depth to water at five monitoring wells and collecting groundwater samples from wells MW011 and MW012 for analysis via EPA Method 8260 for volatile organic halogens, with results presented in an Annual Natural Attenuation Monitoring Report due March 14, 2024. Subtask 3 covers IDW transportation and disposal due April 14, 2024. The total Task Assignment value is $6,151.78 on a fixed unit rate basis, consisting of $5,291.64 for the Groundwater Monitoring Report and $860.14 for IDW Manifest and Project Management. The contract authorizes 35 total labor hours. Payment is contingent upon FDEP approval of deliverables. All work is performed under the underlying Contract HW682 terms and conditions, with site access agreements maintained in Oculus.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW682
DC022A Completion June 7, 2024
This Task Assignment authorizes ECT to perform annual groundwater monitoring in accordance with the attached Scope of Work and Cost Estimate.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Environmental Consulting and Technology, Inc. (ECT)
Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_4599
7212 Merrill Road, Jacksonville, Duval County
Walgreens Store
✔ $ 6,151.78
$ 6,151.78
Scope of Work
Gregory L. Sattler
Deputy Contract Manager Digitally signed by Gregory Sattler DN: CN=Gregory Sattler, E=gsattler@ectinc.com Reason: I am the author of this document Location: your signing location here Date: 2023.09.14 16:28:12-04'00' Foxit PhantomPDF Version: 10.1.7
Gregory Sattler Kelly Crain Digitally signed by Kelly Crain Date: 2023.09.14 15:46:33 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 03/14/2024
IDW Manifest; Project Management 04/14/2024
Upon Submittal and FDEP approval of Groundwater Monitoring Report $ 5,291.64
Upon Submittal and FDEP approval of IDW Manifest; Project Management $ 860.14
$ 6,151.78
HW682
DC022A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW682 Contract Negotiation File Walgreens StorePlaza Jacksonville, Duval County
ERIC_4599
Ginger Shirah, Project Manager September 12, 2023
Subject: Negotiation Summary
HW682 DC022AB
This Task Assignment authorizes ECT to conduct offsite groundwater sampling activities in accordance with the September 12, 2023, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Groundwater Sampling This subtask includes labor, travel, analytical and equipment costs associated with the groundwater sampling activities at the site. Offsite monitoring wells MW011 and MW012 will be sampled and analyzed for VOHs via EPA Method 8260. The groundwater analytical data will be presented in the Groundwater Monitoring Report.
Subtask 3: IDW This subtask includes labor and subcontractor costs associated with IDW transportation and disposal.
Offsite access has been obtained for the two properties that the wells are located on and the site access agreements are in Oculus.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,151.78 with 35 labor hours.
FDEP COST ESTIMATE
Contractor: Environmental Cosultanting & Technology
Date: 28-Aug-23
Task #: SubTask 1 Project Management
Site: Walgreens Store SubTask 2 Annual NAM Report
Activity/Phase: Annual NAM Report SubTask 3 PFAS Screening
Project Manager: Mark Culbreth SubTask 4 IDW Manifest
SubTask 5
Totals 1 2 3
Labor Rate Category
$82.52 Project Manager 2.20 2.20 $82.52 Senior Principal Scientist (MC) 3 3 0
$59.43 Senior Engineer / Scientist (GS) 11 10 1.0
$27.35 GIS Analyst / Graphics (JV) 6 6 0
$24.26 Technician (BC) 10 9.5 0
$33.36 Administrative (BJ) 3 3 0
Total Hours 35 2.20 31.5 1.0
Direct Labor $1,577.41 $181.47 $1,336.51 $59.43
Overhead 125.30% $1,976.50 $227.38 $1,674.65 $74.47
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $747.70 $86.02 $633.51 $28.17
Total Labor $4,301.61 $494.87 $3,644.67 $162.07
Travel
Vehicle Rental $120.00 $120.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00
Total Travel $120.00 $120.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Erwin Remediation $125.00 $0.00 $125.00
Subcontractor Subtotal $125.00 $0.00 $125.00
Handling Fee $12.50 $0.00 $12.50
Total Subcontractor Cost $137.50 $0.00 $137.50
Laboratory
Analytical Costs $219.00 $219.00 $0.00
Sample Shipping $52.00 $52.00 $0.00
Total Laboratory $271.00 $271.00 $0.00
Field Expenses
Expendables $40.00 $40.00 $0.00
Shallow Groundwater Sampling Kit $290.00 $290.00 $0.00
Deep Groundwater Sampling Kit $415.00 $415.00 $0.00
Metal Detector $40.00 $40.00 $0.00
DOT 55 gallon drum $100.00 $100.00 $0.00
Ice $6.50 $6.50 $0.00
Total Field Expenses $891.50 $891.50 $0.00
Subtotal $5,721.61 $494.87 $4,927.17 $299.57
Completion Fee $430.17 $49.49 $364.47 $16.21
Total Estimated Cost $6,151.78 $544.36 $5,291.64 $315.78
Cost from Prior CEF: Manual Entry
Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated
Rounding Error: $6,151.78 Auto-Calculated
Final Total Cost: $6,151.78 Auto-Calculated
SITE : Walgreens Store SUBTASK 2: Annual NAM Report
DATE: 8/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Annual NAM Report 3
Total Hours 3
G. Sattler Senior Engineer Notify RPO of field activites 1
Prepare draft Annual NAM Report 9
Total Hours 10
J. Von Borstel GIS Analyst Recreate Figures 6
Total Hours 6
B. Carrick Technician Prep for field work and obtain IDW drum 1
Roundtrip mobilization from Orlando to Jacksonville for the annual sampling event 5 Locate, open wells to collect DTW at 5 wells 1 Annual Groundwater Sampling 2 wells 2
Containerizing purge water 0.5
Total Hours 9.5
B. Jarvis Administrative Update tables and document production 3
Total Hours 3
TOTAL LABOR 31.5
VEHICLE TYPE RATE UNIT USEAGE
Truck B. Carrick $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA 8260 VOH $73.00 2 $146.00
IDW USEPA 8260 VOH $73.00 1 $73.00
Shipping $52.00 1 $52.00
FDEP Central Lab PFAS Screening $0.00 1 $0.00
FDEP Central Lab PFAS IDW $0.00 1 $0.00
FDEP PFAS Shipping $0.00 1 $0.00
TOTAL LAB $271.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Shallow Groundwater Sampling Kit $290.00 day 1 $290.00
Deep Groundwater Sampling Kit $415.00 day 1 $415.00
Metal Detector $40.00 day 1 $40.00
DOT 55 gallon drum $100.00 each 1 $100.00
Ice $6.50 each 1 $6.50
TOTAL EQUIPMENT $891.50
FINAL --7/24/96
SITE : Walgreens Store SUBTASK 3: IDW Manifest
DATE: 8/28/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer IDW Hazardous clasification and schedule T&D accordingly 1
Total Hour 1.0
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNITS
Erwin Remediation IDW T&D $125.00 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Gregory Sattler Environmental Consulting & Technology, Inc.
3751 Maguire Boulevard, Suite 234 Orlando, Florida 32803
June 28, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit
False Mobilization (No drum found) $ 85.00 Per Stop
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D – Non-Haz Mud or Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate any drum on site.
This quote is valid for 180 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com Office: (850) 292-6511
[)ate 6/08/22
PRICESERVICES# OF
UNITS
ANNUAL
COST
SVCPRODUCT CODE/DESCRIPTION PER PERFREQUENCY YEAR SERVICE
PRODUCT
CODE
r SERVICE/DESCRIPTION U of M UNIT PRICEQUANTITY
Non Haz Ground Water Drum $256.811040A 55 Gal 1 Energy Surcharge174 1 $36.11Unit
These prices are based on information provided by the customer. This quotation will remain in effect for 30 days. For waste disposal services, final pricing is subject to HCC's Waste Approval review of SDS’s and lab analytical results.
Crystal Clean Representative Signature
Customer Signature
02003 Rev.3/18 Printed inUSA FORM 20345
CUSTOMER
Contact Greg Sattler State FL Zip
CUSTOMER QUOTATION
American Drive-In Claners
Customer Environmental Consulting & Technology Inc. Phone 321-245-2124
Address 11700-1 San Jose BLVD
City Jacksonville
$1,430.00/LoadWaste Transportation (est. 1) $140.00/DrumNon-Hazardous Drum Disposal (est. 2)
Estimated Project Total $1,710.00
June 7, 2022
Gregory Sattler, P.E.
Environmental Consulting & Technology, Inc.
3751 Maguire BLD. Suite 234 Orlando, Florida, 32803
Re: Non-Hazardous Drum Disposal Services 11700-1 San Jose BLVD, Jacksonville, FL Lewis Proposal No. 220468LA
Dear Mr. Sattler:
Lewis Environmental (Lewis) is pleased to present this proposal to Environmental Consulting & Technology, Inc. (ECT) for waste transportation and disposal services for 2 drums of IDW purge water. The following is offered for your review and consideration.
Scope of Work:
Lewis will provide a transport vehicle, CDL driver, drum dolly, and miscellaneous tools to complete the tasks as outlined below:
Lewis will provide a waste profile for approval and signature by the generator.
Lewis will arrive on-site and use a drum dolly to load the drum into a rack truck. The drum will be loaded into rack truck, secured, and hauled off site for disposal.
Lewis will supply a shipping document to generator for signature prior to transportation of waste off-site.
The waste will be taken to an approved disposal facility.
Lewis will provide signed waste manifests and disposal documentation to ETC.
Pricing:
Drum Waste Transportation and Disposal
1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338
September 12, 2023
ECT No. P22RA-0296
Ms. Ginger Shirah
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Re: Proposal Walgreens Store
Annual Natural Attenuation Monitoring Report
7212 Merrill Road
Jacksonville, Florida 32277
Facility ID: ERIC_4599
Contract No. HW682
Dear Ms. Shirah:
Environmental Consulting & Technology, Inc. (ECT) has prepared this scope of work to perform the annual natural attenuation monitoring and to prepare an Annual Natural Attenuation Monitoring
Report and PFAS screening for the Walgreens Store site in Jacksonville, Florida.
Subtask 1 – Project Management
This SubTask consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
SubTask 2 Scope of Work
As a part of SubTask 2 ECT proposes to conduct the tasks necessary to complete the natural attenuation monitoring, consisting of measuring depth to water (DTW) from monitoring wells MW004, MW010, and MW014 and collecting groundwater samples from monitoring wells MW011 and MW012.
All groundwater samples will be analyzed by United States Environmental Protection Agency (USEPA)
Method 8260 for volatile organic halogens (VOHs) by a certified National Environmental Accreditation
Program certified laboratory. The groundwater sampling event is tentatively scheduled for October
2023. There is a current site access agreement in place to perform field activities offsite.
If the laboratory analytical results indicate that an investigation derived waste (IDW) samples are below PFAS criteria or if is classified as hazardous, a change order will be submitted to address proper
T&D. A summary of activities in SubTask 2 is included in Table 1. The IDW subcontractor quotes are included in Attachment 1.
Table 2. SubTask 3 Activities Summary
Employee/Resource Activity Time
Sr. Principal Scientist
Develop conclusions and recommendations for the
Annual NAM Report 3 Hours
Ms. Ginger Shirah FDEP
Walgreen Store ectinc.com
Senior Engineer Notify RPO of field activities 1 hour
Senior Engineer Prepare draft Annual NAM report 9 Hours
GIS Analyst Recreate Figures 6 hours
Technician Prep for field work and obtain an IDW Drum 1 hour
Technician Round Trip Mob Orlando to Jacksonville 5 hours
Technician Locate, open, and collect DTW at 5 wells 1 Hour
Technician Groundwater Sampling 2 Hours
Technician Containerize purge water 0.5 hour
Technician Truck for Groundwater Sampling Event 1 day
Administrative Create SAR tables 3 Hours
SubTask 3 Scope of Work
The IDW purge water has been cost to be transported and disposed of as non-hazardous and quotes are included in Attachment 1. A summary of activities in SubTask 3 is included in Table 2.
Table 2. SubTask + Activities Summary
Employee/Resource Activity Time
Senior Engineer IDW Hazardous classification and schedule T&D accordingly 1.5 hours
Deliverable
A summary of cost and deliverable due dates associated with each SubTask is provided on Table 4.
Table 4. Deliverable and Invoice Schedule:
SubTasks Deliverable Deliverable Date Invoice Amount
2 Annual NAM Report 17 April 2024 $5,255.03
3 IDW Manifest 21 May 2024 $404.92
1 Project Management Final Invoicing 21 May 2024 $560.68
Total $6,220.68
Ms. Ginger Shirah FDEP
Walgreen Store ectinc.com
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Gregory Sattler, P.E. Mark A. Culbreth, P.G
Senior Engineer Principal Scientist
GLS:MAC/baj
Attachments
| DC010B Annual GW Monitoring proposal - ERIC_4553.pdf |
| Figures 4-8.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE |
| 3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER |
| 4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER |
| 5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER |
| 6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER |
| 7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER |
| 8 GROUNDWATER CHARACTERIZATION TPOC WELLS |
| PLOT |
File details come from the government source that posted it. Updated .