This is a Consultant's Task Assignment Notification (Form DRP-084) issued by the Florida Department of Environmental Protection, Division of Recreation and Parks, for a design services contract. The primary parties involved are the State of Florida Department of Environmental Protection (FDEP) and The Weiler Engineering Corporation, An Apex Company, a consulting engineering firm based in Punta Gorda, Florida. The contract is designated as FDEP Contract No. CN803, Project Number 6M408C, Task Assignment No. 5, for work at Gasparilla Island State Park.

The contract tasks involve evaluation and design concept development for the Armory Chapel at Gasparilla Island State Park, which sustained significant hurricane damage. The consultant will provide two design concepts: Concept 1 for converting the existing structure into an open-air structure, and Concept 2 for demolishing the structure and constructing a symbolic art structure representing the chapel's historical significance. Deliverables include two three-dimensional renderings and three opinion of probable cost estimates for repair, conversion, and new construction alternatives, to be provided in digital PDF and one hard copy format. The fixed price cost for this task is $18,017.95 with no reimbursable costs. Work is scheduled to commence upon execution and be completed by December 31, 2025, with a 30-calendar-day performance period including seven days for client review. The total encumbered project amount of $18,017.95 is funded through Grant FD097, Organization Code 37504003191, with execution dates in May 2025.

View the file

Other files

File Type Posted
CN-370000-CN803-T10.pdf PDF
CN-370000-CN803-T10CO1.pdf PDF
CN-370000-CN803-T14.pdf PDF
CN-370000-CN803-T16.pdf PDF
CN-370000-CN803-T19.pdf PDF
CN-370000-CN803-T3.pdf PDF
CN-370000-CN803-CMC1.pdf PDF
CN-370000-CN803-T12.pdf PDF
CN-370000-CN803-T15.pdf PDF
CN-370000-CN803-T18.pdf PDF
CN-370000-CN803-T20.pdf PDF
CN-370000-CN803-T21.pdf PDF
CN-370000-CN803-T24.pdf PDF
CN-370000-CN803-T2CO1.pdf PDF
CN-370000-CN803-T30.pdf PDF
CN-370000-CN803-T6.pdf PDF
CN-370000-CN803-T6CO1.pdf PDF
CN-370000-CN803-T9.pdf PDF
CN-370000-CN803-T1.pdf PDF
CN-370000-CN803-T10.pdf.crdownload CRDOWNLOAD file
CN-370000-CN803-T11.pdf PDF
CN-370000-CN803-T13.pdf PDF
CN-370000-CN803-T2.pdf PDF
CN-370000-CN803-T22.pdf PDF
CN-370000-CN803-T23.pdf PDF
CN-370000-CN803-T25.pdf PDF
CN-370000-CN803-T26.pdf PDF
CN-370000-CN803-T4.pdf PDF
CN-370000-CN803.pdf PDF
CN-370000-CN803.pdf.crdownload CRDOWNLOAD file
CN-370000-CN803-T17.pdf PDF
CN-370000-CN803-T7.pdf PDF
CN-370000-CN803-T8.pdf PDF
CN-370000-CN803-T8CO1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. 0 /2025 of 2

FDEP Contract No: Project Number: Task Assignment No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Task Description:

Project Manager:

Schedule:

Start Date: Completion Date:

Fixed Price Cost: Cost Reimbursement (Not to Exceed):

Total Task Amount:

Signatures and Date:

1.

Budget Representative, FDEP Signature Date

2.

Project Manager, FDEP Signature Date

3.

Signature Date

4.

Signature Date

5.

Contract Authority, FDEP Signature Date

CN803 6M408C 5

Gasparilla Island State Park Chapel

The Weiler Engineering Corporation- An Apex Company Michael Giardullo, P.E.,

(941) 505-1700 mgiardullo@weilerengineering.org

Vu Nguyen

(850) 245-2630 Vu.Nguyen@FloridaDEP.gov

This scope of work, WEC will evaluate the design options for repairing the structure vs an open air structure as well as design concepts for converting the structure into a symbolic art structure. Per proposal dated April 30, 2025.

Garland Sandel

Upon Execution 12/31/2025

$18,017.95 $0.00 $18,017.95

Tamika Bass

Garland Sandel

Michael Giardullo, P.E., Vu Nguyen

Michael W. Foster Jr., P.E

Tamika Bass Digitally signed by Tamika Bass Date: 2025.05.08 09:37:58 -04'00'

Garland Sandel Digitally signed by Garland Sandel Date: 2025.05.07 12:29:31 -04'00'

Michael J. Giardullo Digitally signed by Michael J. Giardullo Date: 2025.05.09 10:39:12 -04'00'

Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.05.12 09:46:24 -04'00'

Michael W. Foster Jr., P.E.

Digitally signed by Michael W. Foster Jr., P.E.

Date: 2025.05.12 19:30:17 -04'00'

DDivision oof RRecreation aand PParks

CConsultant’s TTask AAssignment NNotification

FFLORIDA DEPARTMENT OF

EENVIRONMENTAL PPROTECTION

DRP-084

Rev. /2025 2 of 2

Encumbrance Information:

Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount

Total:

6M408C FD097 37504003191 088040/25 675002 U3200 131500 XR $18,017.95

$18,017.95

April 30, 2025

Mr. Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

RE: Gasparilla Island State Park - Chapel Concepts CN - 803, TA

Dear Mr. Sandel, Thank you for the opportunity to provide this proposal for additional work for completion of design concepts for the chapel located within Gasparilla Island State Park.

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289- 416 2 WE INVITE

YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG

Mr. Garland Sandel Gasparilla Island State Park Chapel- Concepts

CN 803/TA03

WEC completed the damage for the Gasparilla Island State Park Armory Chapel under CN 230, TA 92 to provide options for the chapel due to significant hurricane damage. Under this scope of work, WEC will evaluate the design options for repairing the structure vs an open air structure as well as design concepts for converting the structure into a symbolic art structure similar to the example below.

For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below:

Please review the attached proposal summary and deliverables.

Sincerely, Michael J. Giardullo, P.E.

Director of Civil Engineering The Weiler Engineering Corporation- An Apex Company

Mr. Garland Sandel Gasparilla Island State Park Chapel- Concepts

CN 803/TA03

Chapel Concepts Gasparilla Island State Park Contract Number 803, Task

Assignment Subtask 1: Concept Plan Description: Consultant will provide (2) concepts (3D Renderings) for the existing chapel.

Concept 1 will be to convert the existing chapel into an open air structure. Concept 2 will be to demolish the structure and construct a symbolic art structure that represents the history of the Armory Chapel. WEC will provide cost estimates for repairing the existing structure, converting to an open air structure, and constructing an artistic structure.

Deliverable: Plans consultant shall deliver 2 concepts + 3 cost estimate (digital PDF + 1 hard copy) including:

Opinion of Probable Cost: (3) repairing the existing structure, converting to an open air structure, and constructing an artistic structure Concept Plan (3D Rendering) for an Open Air Structure Concept Plan (3D Rendering) of Symbolic Structure

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1 – Concept Plan

Firm Name Position Classification Hourly Rate Hours Total

Fixed Price Cost

Weiler Engineering Project Manager 160.83 28 4,503.24

Weiler Engineering Principal in Charge 319.25 0.5 159.63

Weiler Engineering

Registered Professional Engineer 168.20 10 1,682.00

Weiler Engineering Registered Engineer Intern 115.45 12 1,385.40

Weiler Engineering Senior Engineering Designer 115.13 60 6,907.80

Weiler Engineering Engineering Technician 90.40 36 3,254.40

Weiler Engineering Clerical 62.74 2 125.48

Mr. Garland Sandel Gasparilla Island State Park Chapel- Concepts

CN 803/TA03

Total 18,017.95

Total for Subtask 1 18,017.95

Reimbursable Cost:

Description Number @ Total Postage 0

Printing 0

Overnight Travel (if applicable)

Mileage (@ $0.445 per mile)

Reimbursable Total Cost 0

Total Subtask 1 18,017.95

Project Schedule:

Activity Duration (Calendar Days) Days from Execution Subtask 1: Concept Plan 30 – includes 7 days for Client review

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1: Concept Plan 18,017.95 $0.00

Project Grand Total: 18,017.95