This is a Consultant's Task Assignment Notification (Form DRP-084) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks. The task assignment involves Weiler Engineering Corporation, with representative Michael J. Giardullo, P.E., and FDEP Contract Manager Vu Nguyen. The project is located along the Florida Keys Overseas Heritage Trail at The Fills, specifically between mile markers 77.80-78.52.
The task assignment requires Weiler Engineering to provide engineering plans for the placement of signage, fencing, and an asphalt apron. The consultant will utilize example plans provided by FDEP as part of their FDOT permit to create a complete plan set to be signed and sealed by a Professional Engineer. Deliverables include one digital PDF containing a cover sheet, existing conditions, site plan, and details and specifications. The fixed price cost is $5,002.99 with zero reimbursable expenses, for a total task amount of $5,002.99. The project schedule allows 10 calendar days for completion, with a start date upon execution and completion date of October 1, 2025. The budget is funded through project 3753-8070-001 with organization code 000286 and object code 131300.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDivision oof RRecreation aand PParks
CConsultant’s TTask AAssignment NNotification
FFLORIDA DEPARTMENT OF
EENVIRONMENTAL PPROTECTION
DRP-084
Rev. 0 /2025 of 2
FDEP Contract No: Project Number: Task Assignment No:
Project Location Project
Consultant’s Name:
Consultant’s Representative:
Phone: Email:
FDEP Contract Manager:
Phone: Email:
Task Description:
Project Manager:
Schedule:
Start Date: Completion Date:
Fixed Price Cost: Cost Reimbursement (Not to Exceed):
Total Task Amount:
Signatures and Date:
1.
Budget Representative, FDEP Signature Date
2.
Project Manager, FDEP Signature Date
3.
Signature Date
4.
Signature Date
5.
Contract Authority, FDEP Signature Date
CN803 11
Florida Keys Overseas Heritage Trail FDEP/The Fills- Signage Installation, Fencing, and Asphalt Apron
Weiler Engineering Michael J. Giardullo, P.E.
(941) 505-1700 mgiardullo@weilerengineering.org
Vu Nguyen
(850) 245-2630 vu.nguyen@floridadep.gov
This project consists of providing engineering plans for the placement of signage, fencing, and an asphalt apron between MM77.80-78.52. WEC will utilize the example plans provided by the FDEP as part of their FDOT permit to create a set to be signed and sealed by a Professional Engineer, per attached proposal dated 5/30/25.
Nicholas Parr
Upon Execution 10/01/2025
$5,002.99 $0.00 $5,002.99
Lisa Yarborough
Nicholas Parr
Michael J. Giardullo, P.E.
Vu Nguyen
Michael W. Foster Jr., P.E.
06/03/2025
06/04/2025
Lisa Yarborough Digitally signed by Lisa Yarborough Date: 2025.06.03 15:46:37 -04'00'
Nicholas D. Parr, Ph.D. Digitally signed by Nicholas D. Parr, Ph.D.
Date: 2025.06.03 15:49:36 -04'00'
Michael J. Giardullo Digitally signed by Michael J. Giardullo Date: 2025.06.04 10:33:56 -04'00'
Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.06.04 14:28:18 -04'00'
Michael W. Foster Jr., P.E.
Digitally signed by Michael W. Foster Jr., P.E.
Date: 2025.06.05 16:13:09 -04'00'
DDivision oof RRecreation aand PParks
CConsultant’s TTask AAssignment NNotification
FFLORIDA DEPARTMENT OF
EENVIRONMENTAL PPROTECTION
DRP-084
Rev. /2025 2 of 2
Encumbrance Information:
Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount
Total:
3753-8070-001 030000 000286 U1620 131300 AA $5,002.99
$5,002.99
May 30, 2025 Mr. Nichoals Parr, PhD Florida Department of Environmental Protection Office of Resilience & Coastal Protection Environmental Manager Florida Keys National Marine Sanctuary & Southeast Aquatic Preserves Nicolas.Parr@FloridaDEP.gov 305-289-7083
RE: FDEP/The Fills- Signage Installation, Fencing, and Asphalt Apron - CN - 803, TA - XX
Dr. Parr, Thank you for the opportunity to provide engineering plans for the placement of signage, fencing, and an asphalt apron between MM77.80-78.52. WEC will utilize the example plans provided by the FDEP as part of their FDOT permit to create a set to be signed and sealed by a Professional Engineer.
PUNTA GORDA OFFICE: 201 WEST MARION AVENUE - SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505 -1700 | FAX 941-505 -1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 -289- 416 2 WE INVITE
YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT INFO@WEILERENGINEERING.ORG
Dr. Nicholas Parr FDEP/The Fills Signage Installation, Fencing, and Asphalt Apron
CN 803/TAXX
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the tasks identified below. Please review the attached proposal summary and deliverables. Sincerely, Michael J. Giardullo, P.E. Director of Civil Engineering The Weiler Engineering Corporation- An Apex Company
Dr. Nicholas Parr FDEP/The Fills Signage Installation, Fencing, and Asphalt Apron
CN 803/TAXX
FDEP/The Fills- Signage Installation, Fencing, and Asphalt Apron - CN - 803, TA - XX
FDEP/The Fills
Contract Number 803, Task Assignment Number XX
Subtask 1: 100% Plans Description: Consultant will provide plans utilizing the permit set received from the FDEP to create a complete plan set to be used for FDOT permitting and construction.
Deliverable: Plans consultant shall deliver 1 digital PDF including:
Cover Sheet Existing Conditions Site Plan Details and Specifications
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1 – 100% Plans
Firm Name Position Classification
Hourly Rate Hours Total
Fixed Price Cost
Weiler Engineering Senior Project Manager
160.83 6 964.98
Weiler Engineering Principal 319.24 0.5 159.62
Weiler Engineering Professional Engineer 168.20 4 672.80
Weiler Engineering Engineer Intern 115.45 6 692.70
Weiler Engineering Senior Engineering Designer
115.13 15 1,726.95
Weiler Engineering Engineering Designer 90.40 8 723.20
Weiler Engineering Clerical 62.74 1 62.74
Total 5,002.99
Total for Subtask 1 5,002.99
Dr. Nicholas Parr FDEP/The Fills
CN 803/TAXX
Reimbursable Cost:
Description Number @ Total Postage 0
Printing 0 2.3 0
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile) 0
Reimbursable Total Cost 0
Total Subtask 1 5,002.99
Project Schedule:
Activity Duration (Calendar Days) Days from Execution Subtask 1: 100% Plans 10 10
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1: 100% Plans 5,002.99 $0.00
Project Grand Total: 5,002.99
File details come from the government source that posted it. Updated .