This document is a Task Assignment Change Order Form (DRP-085) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for the Cayo Costa State Park Hurricane Ian Redevelopment project. The contracting parties are FDEP and Weiler Engineering Corp, with Michael J. Giardullo serving as the consultant's representative and Laurinda Micheels as the FDEP contract manager. The contract is designated as FDEP Contract No. CN803, Project Number 6I408C, Task Assignment No. 02, Change Order No. 01.

The change order authorizes additional services to determine adequate reverse osmosis systems to service park facilities, per Weiler Engineering's proposal dated May 12, 2026, and a concurrent time extension request dated May 14, 2026. The net increase in task amount is $6,718.45 in fixed fees with no reimbursable costs, bringing the total task amount with all change orders to $195,452.49. The work comprises two subtasks: Subtask 16 (Permitting Due Diligence) at $2,538.39 and Subtask 17 (Technical Evaluation and Cost Analysis) at $4,180.06. The contract execution date is May 2, 2025, with the original end date of December 31, 2026, extended to March 30, 2030, representing a net extension of 1,185 calendar days at no additional cost. Funding is allocated from FLAIR code 6I408C FD091 37504003127 088040/24 675002 U3200 131500 XR. The change order was approved on May 15, 2026, by authorized FDEP representatives.

View the file

Other files

File Type Posted
CN-370000-CN803-T10.pdf PDF
CN-370000-CN803-T10CO1.pdf PDF
CN-370000-CN803-T14.pdf PDF
CN-370000-CN803-T16.pdf PDF
CN-370000-CN803-T19.pdf PDF
CN-370000-CN803-T3.pdf PDF
CN-370000-CN803-CMC1.pdf PDF
CN-370000-CN803-T12.pdf PDF
CN-370000-CN803-T15.pdf PDF
CN-370000-CN803-T18.pdf PDF
CN-370000-CN803-T20.pdf PDF
CN-370000-CN803-T21.pdf PDF
CN-370000-CN803-T24.pdf PDF
CN-370000-CN803-T30.pdf PDF
CN-370000-CN803-T6.pdf PDF
CN-370000-CN803-T6CO1.pdf PDF
CN-370000-CN803-T9.pdf PDF
CN-370000-CN803-T1.pdf PDF
CN-370000-CN803-T10.pdf.crdownload CRDOWNLOAD file
CN-370000-CN803-T11.pdf PDF
CN-370000-CN803-T13.pdf PDF
CN-370000-CN803-T2.pdf PDF
CN-370000-CN803-T22.pdf PDF
CN-370000-CN803-T23.pdf PDF
CN-370000-CN803-T25.pdf PDF
CN-370000-CN803-T26.pdf PDF
CN-370000-CN803-T4.pdf PDF
CN-370000-CN803.pdf PDF
CN-370000-CN803.pdf.crdownload CRDOWNLOAD file
CN-370000-CN803-T17.pdf PDF
CN-370000-CN803-T5.pdf PDF
CN-370000-CN803-T7.pdf PDF
CN-370000-CN803-T8.pdf PDF
CN-370000-CN803-T8CO1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Task Assignment Change Order Form

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-085

Rev. /2025 1 of 2

FDEP Contract No: Project Number:

Task Assignment No: Change Order No:

Project Location Project

Consultant�s Name:

Consultant�s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Description of Change:

Change in Task Amount

Item Reimbursement Fixed Fee Total

Original Task Amount

Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders

CN803 6I408C

02 01

Cayo Costa State Park Hurricane Ian Redevelopment

Weiler Engineering Corp Michael J. Giardullo

(941) 505-1700 mgiardullo@weilerengineering.org

Laurinda Micheels

(850) 245-2781 Laurinda.Micheels@floridadep.gov

Additional services to determine adequate reverse osmosis systems to service the park facilities, per attached proposal dated May 12, 2026, and a time extension per the attached request dated May 14, 2026.

$ 973.00 $ 187,761.04

$ 973.00 $ 187,761.04

$ 0.00 $ 6,718.45

$ 973.00 $ 194,479.49

$ 188,734.04

$ 188,734.04

$ 6,718.45

$ 195,452.49

FLORIDA DEPARTMENT OF Division of Recreation and Parks

ENVIRONMENTAL PROTECTION Task Assignment Change Order Form

Change in Task Time

Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date

Funding Information

29 Digit FLAIR Code:

Project # Grant # Org Code Cat/Year Fund Module Object Code

EO Amount

Total

Approval Signatures

Budget Representative, FDEP

Project Manager, FDEP

Contract Authority, FDEP

Signature

Signature

Signature

Signature

Signature

Date

Date

Date

Date

Date

DRP-085

Rev. 2 of 2

Fund

Representative, Signature

05/02/2025 12/31/2026 12/31/2026 1,185 03/30/2030

6I408C FD091 37504003127 088040/24 675002 U3200 131500 XR $ 6,718.45

$ 6,718.45

Tamika Bass

Terry McCullum Jr.

Michael J. Giardullo

Laurinda Micheels

Michael W. Foster, Jr., P.E.

Tamika Bass Digitally signed by Tamika Bass Date: 2026.05.15 09:39:49 -04'00'

Terry McCullum Jr.

Digitally signed by Terry McCullum Jr.

Date: 2026.05.15 09:47:59 -04'00'

Laurinda Micheels Digitally signed by Laurinda Micheels Date: 2026.05.15 10:15:28 -04'00'

Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2026.05.15 13:45:13 -04'00'

April 27, 2026- Rev 3: May 12, 2026

Mr. Terry McCullum, Jr., PMP Design Section Leader Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

RE: Cayo Costa State Park Reverse Osmosis System, CN803, TA 2, CO #1

Dear Mr. McCullum, Thank you for the opportunity to provide this proposal to assist the Department with the evaluation and installation of reverse osmosis (RO) water treatment systems at Cayo Costa State Park.

It is our understanding that the FDEP is seeking to improve potable water quality by implementing RO systems at multiple facilities throughout the park. The proposed scope of work includes evaluation, design, and installation considerations for six (6) locations as outlined below:

Location 1: Ranger Station, Gift Shop, 3-Bay Maintenance Building, and Restroom

Location 2: Ranger Residence 1

Location 3: Ranger Residence 2

Location 4: Ranger Residence 3

Location 5: Campground Restroom (Requires Solar Panels)

Location 6: Beach Restroom (Requires Solar Panels)

April 24, 2026- Rev 3 May 12, 2026 Mr. Terry McCullum, Jr Cayo Costa State Park Reverse Osmosis System

CN803/TA 2, CO #1

For your review, the Weiler Engineering Corporation, has provided a proposal summary along with supporting man-hour documentation for the tasks identified below. Please review the attached proposal summary and deliverables.

Sincerely, Michael J. Giardullo, P.E.

Director of Civil Engineering The Weiler Engineering Corporation An Apex Company

Mr. Terry McCullum, Jr Cayo Costa State Park

Cayo Costa State Park

Contract Number 803, Task Assignment Number 2, CO #1

Subtask 16: Permitting Due Diligence

Description: Consultant will perform a permitting due diligence review for the proposed reverse osmosis (RO) system to identify applicable regulatory requirements, constraints, and anticipated approval pathways. This effort will include review of FDEP and DOH permitting criteria related to potable water systems, evaluation of source water classification, and identification of minimum treatment, testing, and reporting requirements. Coordination with applicable agencies may be conducted as needed to confirm requirements.

Deliverable: Technical memorandum summarizing permitting requirements, regulatory considerations, and recommended permitting path in PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 16 Permitting Due Diligence Firm Name Position Classification Hourly

Rate Hours Total

Fixed Price Cost

Weiler Engineering

Senior Project Manager 160.83 2 $321.66

Weiler Engineering

Principal 319.24 0.5 $159.62

Weiler Engineering

Professional Engineer 168.20 3 $504.60

Weiler Engineering

Engineer Intern 115.45 5 $577.25

Weiler Engineering

Senior Engineering Designer 115.13 4 $460.52

Weiler Engineering

Engineering Designer 90.40 5 $452.00

Weiler Engineering

Clerical 62.74 1 $62.74

Total $2,538.39

Total for Subtask 16

$2,538.39

Mr. Terry McCullum, Jr Cayo Costa State Park

Subtask 17: Technical Evaluation and Cost Analysis

Description: Consultant will perform a preliminary technical evaluation of the proposed RO system and provide recommendations on an appropriate system for the (6) different locations.

This evaluation will include an assessment of salinity removal efficiency based on typical RO system performance and anticipated source water conditions, as well as a review of system sizing considerations.

an appropriate system, based on our recommendations, for each structure with bid documents.

Consultant will evaluate potential power requirements and associated impacts for system operation. It is anticipated the Location 5 and Location 6 will require solar panels. A cost estimate will be prepared for the proposed system configuration.

Deliverable: Technical memorandum summarizing system performance assumptions, power considerations, and cost estimate in PDF format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 17 Technical Evaluation and Cost Analysis Firm Name Position Classification Hourly

Rate Hours Total

Fixed Price Cost

Weiler Engineering

Senior Project Manager 160.83 2 $321.66

Weiler Engineering

Principal 319.24 0.25 $79.81

Weiler Engineering

Professional Engineer 168.20 5 $841.00

Weiler Engineering

Engineer Intern 115.45 16 $1,847.20

Weiler Engineering

Senior Engineering Designer 115.13 5 $575.65

Weiler Engineering

Engineering Designer 90.40 5 $452.00

Weiler Engineering

Clerical 62.74 1 $62.74

Total $4,180.06

Total for Subtask 17

$4,180.06

Mr. Terry McCullum, Jr Cayo Costa State Park

Project Schedule:

Activity Duration (Calendar Days) Days from Execution

Subtask 16: Permitting Due Diligence

21 21

Subtask 17: Technical Evaluation and Cost Analysis

21 21

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 16: Permitting Due Diligence

$2,538.39 $0.00

Subtask 17: Technical Evaluation and Cost Analysis

$4,180.06 $0.00

Overall Total Cost: $6,718.45

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

PUNTA GORDA OFFICE: 201 WEST MARION AVENUE- SUITE 1306 | PUNTA GORDA | FL 33950 | TEL 941-505-1700 | FAX 941- 505-1702 MARATHON OFFICE: 6805 OVERSEAS HIGHWAY | MARATHON | FL 33050 | TEL 305 -289-4161 | FAX 305 - 289-41 6 2

WE INVITE YOU TO VISIT OUR WEB SITE AT WWW.WEILERENGINEERING.ORG OR EMAIL US AT

INFO@WEILERENGINEERING.ORG

May 14, 2026

Mr. Terry McCullum, Jr., PMP Design Section Leader Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399

Re: Cayo Costa State Park Hurricane Ian Redevelopment, CN803, TA 2

Mr. McCullum, We are requesting a time extension for the Cayo Costa State Park- Hurricane Ian Redevelopment project. This extension would be at no additional cost to the FDEP. The current contract expires on 12/31/2026 and we are requesting an extension until 3/30/2030.

If you have any questions, or require additional information, please do not hesitate to contact me at

(941) 505-1700 or electronically at rpalmer@weilerengineering.org.

Sincerely, Robin Palmer, P.E.

Project Manager Weiler Engineering Corporation-An Apex Company

File details come from the government source that posted it. Updated .