CN-370000-CN803-T15.pdf
PDF 544 KB Posted
- Contract number
- CN803
- Issued by
- Florida
About this file
Document Summary
This is a Consultant's Task Assignment Notification (Form DRP-084) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for Task Assignment No. 15 under Contract CN803 (Project RM2401). The document formalizes a consulting agreement between FDEP and The Weiler Engineering Corporation—An Apex Company for design, permitting, and construction services related to the Rookery Bay Research Reserve Dock Extension project located at Shell Island in Rookery Bay, Florida. Michael Giardullo, P.E., serves as the consultant's representative, with Vu Nguyen designated as the FDEP Contract Manager.
The scope of work encompasses design, permitting, and construction services for extending the existing dock through the addition of a new 30-foot floating dock. Services are divided into ten subtasks spanning preliminary design (30% plans), survey work, environmental benthic resource assessment, 60% and 100% design plans, permit applications and approvals, bidding assistance, pre-construction meetings, submittal review, construction observation (three months), substantial completion inspection, and final completion with certification. The contract structure includes a fixed price cost of $90,175.06 and cost reimbursement (not to exceed) of $15,500.00, for a total task amount of $105,675.06. The reimbursable costs cover SFWMD Environmental Resource Permit fees ($3,500) and county permits ($12,000). The project timeline begins upon execution and extends through December 31, 2026, with deliverables ranging from design plans in digital PDF and CAD formats to meeting minutes, permit documentation, and final certifications. Payment is contingent upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDivision oof RRecreation aand PParks
CConsultant’s TTask AAssignment NNotification
FFLORIDA DEPARTMENT OF
EENVIRONMENTAL PPROTECTION
DRP-084
Rev. 0 /2025 of 2
FDEP Contract No: Project Number: Task Assignment No:
Project Location Project
Consultant’s Name:
Consultant’s Representative:
Phone: Email:
FDEP Contract Manager:
Phone: Email:
Task Description:
Project Manager:
Schedule:
Start Date: Completion Date:
Fixed Price Cost: Cost Reimbursement (Not to Exceed):
Total Task Amount:
Signatures and Date:
1.
Budget Representative, FDEP Signature Date
2.
Project Manager, FDEP Signature Date
3.
Signature Date
4.
Signature Date
5.
Contract Authority, FDEP Signature Date
CN803 RM2401 15
Rookery Bay Research Reserve Dock Extension
The Weiler Engineering Corporation- An Apex Company Michael Giardullo, P.E.
(941) 505-1700 mgiardullo@weilerengineering.org
Vu Nguyen
(850) 245-2630 Vu.Nguyen@FloridaDEP.gov
This is for design, permitting, and construction services for the extension of the existing dock by the addition of a new 30-foot floating dock per the attached proposal dated 7/10/25.
Garland Sandel
Upon Execution 12/31/2026
$90,175.06 $15,500.00 $105,675.06
Lisa Yarborough
Garland Sandel
Michael Giardullo, P.E.
Vu Nguyen
Michael W. Foster Jr., P.E.
Lisa Yarborough Digitally signed by Lisa Yarborough Date: 2025.07.24 11:49:45 -04'00'
Garland Sandel Digitally signed by Garland Sandel Date: 2025.07.24 13:00:04 -04'00'
Michael Giardullo Digitally signed by Michael Giardullo Date: 2025.07.25 10:57:38 -04'00'
Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.07.25 15:12:01 -04'00'
Michael W. Foster Jr., P.E.
Digitally signed by Michael W. Foster Jr., P.E.
Date: 2025.07.31 09:09:10 -04'00'
DDivision oof RRecreation aand PParks
CConsultant’s TTask AAssignment NNotification
FFLORIDA DEPARTMENT OF
EENVIRONMENTAL PPROTECTION
DRP-084
Rev. /2025 2 of 2
Encumbrance Information:
Project # Grant # Organization Code Category/Yr Fund Module Object EO Amount
Total:
RM2401 37538020000 083643/24 423001 241000 QK $105,675.06
$105,675.06
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702 Marathon: 6805 Overseas Highway, Marathon, Florida 33050 | Tel 305-289-4161 | Fax 305-289-4162
June 14, 2025 – Revision 3: July 10, 2025
Mr. Garland Sandel Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260-L, MS 520 Tallahassee, FL 32399
RE: Shell Island Dock at Rookery Bay - Dock Extension - CN 803, TA
Dear Mr. Sandel, Thank you for the opportunity to provide this proposal for the addition of a 30’ floating dock to the existing dock at Rookery Bay Reserve.
Project Location
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
The scope of work will include the following:
The extension of the existing dock by the addition of a new 30-foot floating dock at Rookery Bay Reserve.
For your review, the Weiler Engineering Corporation, has provided a proposal summary and man-hour documentation for the services and tasks identified.
Please feel free to contact me if you have any questions or wish to discuss matters further.
Sincerely, Michael J. Giardullo, P.E.
Director of Civil Engineering The Weiler Engineering Corporation- An Apex Company
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Rookery Bay - Shell Island Dock Extension
CN 803, TA
Subtask 1: Preliminary Design - 30% Plans
1) A – 30% Preliminary Design
a) WEC will conduct one site visit.
b) Consultant will conduct a pre-application meeting with the Water Management District, USACE, and the County.
c) Consultant will prepare Preliminary Design Plans.
1) B – Survey
a) Consultant will coordinate with the Survey Sub-Consultant to prepare a Special Purpose Survey with topographical information for the project area. 60 days from execution, consultant shall deliver the survey via digital PDF and CAD.
1) C – Environmental Benthic Resource Survey
a) Consultant will coordinate with the Environmental Sub-Consultant to prepare a Benthic Resource Survey for the project area. 60 days from execution, consultant shall deliver the Benthic Resource Survey via digital PDF.
Deliverable:
1) A – 30% Preliminary Design
Meeting minutes from the site visit and all permitting pre-application meeting minutes will be provided in PDF format. For the 30% Design Plans, Consultant shall deliver 30% design plans to the client via digital PDF. Plans will include:
Cover Sheet Existing Conditions Dock Plan Best Management Plan Opinion of Probable Cost
1) B - Survey
Consultant will coordinate with the Survey Sub-Consultant to prepare a Special Purpose Survey with topographical information for the project area. 60 days from execution, consultant shall deliver the survey via digital PDF and CAD.
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
1) C - Environmental Benthic Resource Survey
Consultant will coordinate with the Environmental Sub-Consultant to prepare a Benthic Resource Survey for the project area. 60 days from execution, consultant shall deliver the Benthic Resource Survey via digital PDF.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Subtask 1A: 30% Preliminary Design
Subtask 1 - 30% Preliminary Design
Firm Name
Position Classification
Hourly Rate
Hours
Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 16 $2,573.28 Weiler Engineering Principal in Charge
319.24 2
$638.48
Weiler Engineering Registered Professional Engineer 168.2 6 $1,009.20
Weiler Engineering Registered Engineer Intern 115.45 25 $2,886.25
Weiler Engineering Senior Engineering Designer 115.13 20 $2,302.60
Weiler Engineering Engineering Designer 90.4 60 $5,424.00 Weiler Engineering Construction Inspector
96.87 0
$0.00 Weiler Engineering Clerical 62.74 2 $125.48
$14,959.29
Reimbursable Cost: (if applicable)
Postage
Printing
Overnight Travel (if applicable) Mileage (@ $0.445 per mile)
Reimbursable Total Cost $0.00
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Total Subtask 1A:
Preliminary Design
$14,959.29
Subtask 1B: Survey Description: Consultant will coordinate with the Survey Sub-Consultant to prepare a Special Purpose Survey with topographical information for the project area. 60 days from execution, consultant shall deliver the survey via digital PDF and CAD.
Deliverable: Consultant will coordinate with the Survey Sub-Consultant to prepare a Special Purpose Survey with topographical information for the project area. 60 days from execution, consultant shall deliver the survey via digital PDF and CAD.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1B - Survey
Firm Name Position Classification Unit Unit Rate Number Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr 160.83 8 $1,286.64
Johnson Engineering 3 Person Field Crew Hr 200.18 28 $5,605.04
Johnson Engineering Survey Technician Hr 79.18 20 $ 1,583.60
Johnson Engineering Administrative Hr 71.71 3 $ 215.13
Johnson Engineering PSM Manager Hr 143.65 8 $1,149.20
Johnson Engineering Total Survey $9,839.61
Overnight Travel (if
Total Subtask 1B Survey
$9,839.61
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Subtask 1C: Environmental Benthic Resource Survey Description: Consultant will coordinate with the Environmental Sub-Consultant to prepare a Benthic Resource Survey for the project area. 60 days from execution, consultant shall deliver the Benthic Resource Survey via digital PDF.
Deliverable: Consultant will coordinate with the Environmental Sub-Consultant to prepare a Benthic Resource Survey for the project area. 60 days from execution, consultant shall deliver the Benthic Resource Survey via digital PDF.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Subtask 1C – Environmental Benthic Resource Survey
Firm Name Position Classification Unit Unit Rate Number Units
Total Fixed Price Cost
Weiler Engineering Project Manager Hr 160.83 10 $1,608.30
Johnson Engineering Sr. Ecologist Hr 132.51 21 $2,782.71
Johnson Engineering Ecologist Hr 106.29 32 $3,401.28
Johnson Engineering GIS Professional Hr 131.46 26 $3,417.96
Johnson Engineering Administrative Hr 71.71 3 $215.13
Johnson Engineering Total Environmental Protect. $11,425.38
Overnight Travel (if
Total Subtask 1 Survey
$11,425.38
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Subtask 2: 60% documents Description: Plans completed to 60% incorporating comments from 30%. Deliverable:
Consultant shall deliver 60% Plans (digital PDF only) including:
Cover Sheet Survey Existing Conditions Best Management Plan Dock Plans Structural Notes Framing Plan & Details Profiles Specifications Opinion of Probable Cost complete, accurate, and timely. (Please do not alter this language)
Subtask 2 – 60% Plans
Position Classification Hour ly
Fixed Price Cost
Weiler Engineering Project Manager 160.83 8 $1,286.64
Weiler Engineering Principal in Charge 319.24 0.25 $79.81
Weiler Engineering Registered Professional Engineer 168.2 16 $2,691.20
Weiler Engineering Registered Engineer Intern 115.45 20 $2,309.00
Weiler Engineering Senior Engineering Designer 115.13 30 $3,453.90
Weiler Engineering Engineering Designer 90.4 50 $4,520.00
Weiler Engineering Const. Inspector 96.87 0 $0.00
Weiler Engineering Total $14,466.03
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Reimbursable Cost:
Postage No prints/provided digitally via email
Overnight Travel (if applicable) Mileage (@ $0.445 per mile)
Not anticipated
Total Subtask 2 $14,466.03
Subtask 3: Permitting A – Permit Applications Description: Consultant will assist Client to submit permit applications for ACOE, Collier County, and South Florida Water Management District permits.
Deliverable: Consultant shall deliver digital set of permit applications.
B – Permit Approvals, Description Consultant will coordinate with Client to respond to regulatory requests for additional information through approval.
Deliverable: Consultant will provide via email to the BDC the completed permits for the County, City and SWFWMD for site approvals.
Subtask 3A Permit Applications
Fixed Price Cost
Weiler Engineering Project Manager 160.83 5 $804.15
Weiler Engineering Principal in Charge 319.24 1 $319.24
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Weiler Engineering Registered Professional Engineer 168.2 6 $1,009.20
Weiler Engineering Registered Engineer Intern 115.45 25 $2,886.25
Weiler Engineering Senior Engineering Designer 115.13 20 $2,302.60
Weiler Engineering Engineering Designer 90.4 25 $2,260.00
Weiler Engineering Const. Inspector 96.87 0 $0.00
Weiler Engineering Total $9,706.92
Subtask 3B Permit Approvals
Fixed Price Cost
Weiler Engineering Project Manager 160.83 2 $321.66
Weiler Engineering Principal in Charge 319.24 0.25 $79.81
Weiler Engineering Registered Professional Engineer 168.2 3 $504.60
Weiler Engineering Registered Engineer Intern 115.45 5 $577.25
Weiler Engineering Senior Engineering Designer 115.13 5 $575.65
Weiler Engineering Engineering Designer 90.4 10 $904.00
Weiler Engineering Const. Inspector 96.87 0 $0.00
Weiler Engineering Clerical 62.74 1 $62.74 Total $3,025.71
Item Units Cost/Unit Total
SFWMD ERP
$3,500
County Permits $12,000 Estimate
$15,500.00
Total for Subtask 3 $ 28,732.63
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Subtask 4: 100% documents Description:
Plans completed to 100%.
Deliverable: Consultant shall deliver one set of 100% signed and sealed plans, digital 1-PDF and 1-CAD including:
Cover Sheet Survey Existing Conditions Best Management Plan Dock Plans Structural Notes Framing Plan & Details Profiles Specifications Opinion of Probable Cost
Performance Measure: Deliverables will be reviewed by the Department to confirm they are
Subtask 4 - 100 % Plans
Position Classification Hourly
Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 5 $804.15
Weiler Engineering Principal in Charge 319.24 0.25 $79.81
Weiler Engineering Registered Professional Engineer 168.2 8 $1,345.60
Weiler Engineering Registered Engineer Intern 115.45 14 $1,616.30
Weiler Engineering Senior Engineering Designer 115.13 14 $1,611.82
Weiler Engineering Engineering Designer 90.4 40 $3,616.00
Weiler Engineering Const. Inspector 96.87 0 $-
Weiler Engineering Total $9,199.16
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Postage Not anticipated
Printing Not anticipated
Overnight Travel Not anticipated
(if applicable) Reimbursable Total $0.00 Cost
Total for Subtask 4 $9,199.16
Subtask 5: Assistance during bidding
Description: Consultant will attend one pre-bid meeting and respond to bidders’ questions and provide clarifications during bidding.
Deliverable: Consultant will provide digital pdf of all responses and communication with bidders.& regulatory agencies complete, accurate, and timely.
Subtask 5 - Bidding assistance Position Classification Hourly
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 6 $964.98
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 0 $0.00
Weiler Engineering Registered Engineer Intern 115.45 8 $923.60
Weiler Engineering Senior Engineering Designer 115.13 0 $0.00
Weiler Engineering Engineering Designer 90.4 0 $0.00
Weiler Engineering Const. Inspector 96.87 0
Weiler Engineering Total $1,951.32
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Subtask 6: Attend Pre-Construction Meeting Description: WEC staff will attend one pre-construction meeting on site, respond to questions and prepare minutes.
Deliverable: WEC will provide representation at the Pre-Construction Meeting and deliver meeting notes within 2 days from meeting date for inclusion by FDEP Project Manager in Meeting Minutes in PDF format.
Printing Not anticipated
Overnight Travel Not anticipated
(if applicable) Mileage ($0.445 per mile) Reimbursable Total Cost
Total for Subtask 5 $1,951.32
Subtask 6 - Pre-construction Mtg
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 8 $1,286.64
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 0 $0.00
Weiler Engineering Registered Engineer Intern 115.45 8 $923.60
Weiler Engineering Senior Engineering Designer 115.13 0 $0.00
Weiler Engineering Engineering Designer 90.4 0 $0.00
Weiler Engineering Const. Inspector 96.87 0 $0.00
Weiler Engineering Total $2,272.98
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Overnight Travel (if applicable) Mileage (@ $0.445 per mile) Reimbursable Total Cost
Not anticipated
Not anticipated
$0
Total Subtask 6 $2,272.98
Subtask 7: Review Contractor submittals
Description: WEC will provide engineering review of Contractor's shop drawing submittals. WEC will prepare an anticipated submittal list and maintain a log.
Deliverable: WEC will review and comment on Contractor submittal package within 7 days of receipt and provide stamped acceptance of final submittals in PDF digital form to FDEP Project Manager within 7 days of final approvals.
Subtask 7 - Submittal Review
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 4 $643.32
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 4 $672.80
Weiler Engineering Registered Engineer Intern 115.45 8 $923.60
Weiler Engineering Senior Engineering Designer 115.13 12 $1,381.56
Weiler Engineering Engineering Designer 90.4 2 $180.80
Weiler Engineering Const. Inspector 96.87 2 $193.74
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Weiler Engineering Total $4,121.30
Postage Not anticipated (all deliverables in digital form only)
Overnight Travel (if applicable) Mileage (@ $0.445 per mile) Reimbursable Total Cost
Not anticipated (all deliverables in digital form only)
$0.00
Total Subtask 7 - Submittals
$4,121.30
Subtask 8: Assistance during construction (3 Months)
Description: WEC will respond to RFI's from Contractor within 7 days throughout the course of the construction phase. WEC will provide copies of all RFI responses to FDEP Project Manager in PDF digital format.
Deliverable: Correspondence with Contractor and regulatory agencies provided via PDF.
Subtask 8
Rate
Ho urs
Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 6 $964.98
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 4 $672.80
Weiler Engineering Registered Engineer Intern 115.45 8 $923.60
Weiler Engineering Senior Engineering Designer 115.13 10 $1,151.30
Weiler Engineering Engineering Designer 90.4 2 $180.80
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Weiler Engineering Const. Inspector 96.87 2 $193.74
Weiler Engineering Total $4,149.96
Overnight Travel (if applicable)
Reimbursable Total Cost
Not anticipated (all deliverables in digital form only)
Total Subtask 8 $4,149.96
Subtask 9: Substantial Completion Walk-Through w/Punchlist
Description: WEC will assist Client with the Substantial Completion inspection and punch list, with WEC representative attending the Substantial Completion inspection and providing engineer input related to the punch list.
Deliverable: WEC will provide comments and input on punch list within one (1) day of Substantial Completion inspection.
Subtask 9 - Substantial
Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 2 $321.66
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 2 $336.40
Weiler Engineering Registered Engineer Intern 115.45 7 $808.15
Weiler Engineering Senior Engineering Designer 115.13 0 $0.00
Weiler Engineering Engineering Designer 90.4 0 $0.00
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Weiler Engineering Const. Inspector 96.87 7 $678.09
Weiler Engineering Total $2,207.04
Overnight Travel (if applicable) Mileage (@ $0.445 per mile) Reimbursable Total Cost
Not anticipated
Not anticipated
$0.00
Total Subtask 9 $2,207.04
Subtask 10: Final Completion w/ Certification
Description: WEC will assist Client with the Final Completion inspection of the site with WEC representative attending the Final Completion inspection.
Deliverable: WEC will prepare final certifications necessary for regulatory close out and deliver five sets of record plans and certifications and one PDF set via email.
Subtask 10 - Final
Rate
Hours Total Fixed Price Cost
Weiler Engineering Project Manager 160.83 6 $964.98
Weiler Engineering Principal in Charge 319.24 0 $0.00
Weiler Engineering Registered Professional Engineer 168.2 2 $336.40
Weiler Engineering Registered Engineer Intern 115.45 7 $808.15
Weiler Engineering Senior Engineering Designer 115.13 0 $0.00
Weiler Engineering Engineering Designer 90.4 0 $0.00
Weiler Engineering Const. Inspector 96.87 7 $678.09
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Weiler Engineering Total $2,850.36
Overnight Travel (if applicable)
Mileage (@ $0.445 per mile)
Reimbursable Total Cost
Not anticipated
Not anticipated
$0.00
Total Subtask 10 $2,850.36
Project Schedule:
Activity Duration (Calendar Days) Dates to be based on date of execution of task order
Subtask 1A 30% Plans 60 - includes 14 days for Client review
Subtask 1B Survey 60
Subtask 1C Environmental Benthic Resource Survey
Subtask 2: 60% plans 30 - includes 14 days for Client review
Subtask 3A: Permit applications 30 – includes 7 days for Client review
Subtask 3B: Permit approvals 240 – includes 7 days for Client review
Subtask 4: 100% plans 30 – includes response for additional information
Subtask’s 5-10 TBD
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
Summary of Fees:
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 1A 30% Plans $14,959.29 $0.00
Subtask 1B Survey $9,839.61 $0.00
Subtask 1C Environmental Benthic Resource Survey
$11,425.38 $0.00
Subtask 2: 60% plans $14,466.03 $0.00
Subtask 3A: Permit applications $9,706.92 $15,500.00
Subtask 3B: Permit approvals $3,025.71 $0.00
Subtask 4: 100% plans $9,199.16 $0.00
Total Design & Permitting $72,622.10 $15,500.00
Subtask 5: Assistance during bidding
$1,951.32 $0.00
Subtask 6: Attend Pre-Con Mtg $2,272.98 $0.00
Subtask 7: Review Submittals $4,121.30 $0.00
Subtask 8: Assistance during Construction - 3 Months
$4,149.96 $0.00
Subtask 9: Substantial Completion Walk-Through w/ Punchlist
$2,207.04 $0.00
Subtask 10: Final Completion w/ Certification $2,850.36 $0.00
Subtotal Construction Services $17,552.96 $0.00
Total Fixed Price $90,175.06
Total Reimbursable Cost $15,500.00
Total Overall Cost $105,675.06
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
Punta Gorda: 201 West Marion Avenue - Suite 1306 | Punta Gorda, Florida 33950 | Tel 941 - 505 - 1700 | Fax 941-505-1702
File details come from the government source that posted it. Updated .