This is a Task Assignment Change Order (Change Order No. 1) issued by the Florida Department of Environmental Protection (FDEP) under Contract CN331 with Humiston & Moore Engineers for the Gasparilla Island State Park Seawall Reconstruction project. The project is located at Gasparilla Island State Park and addresses damage from Hurricane Milton to the Belcher Road Seawall. Key personnel include Brett Moore (Consultant Representative) and Ralph Perkins (FDEP Contract Manager). The change order was executed with digital signatures from representatives of both FDEP and the consulting firm, with approval from Budget Representative Tamika Bass, Project Manager Garland Sandel, and Contract Authority Michael W. Foster Jr.

The change order authorizes design, permitting, and construction observation services for short-term stabilization of the failed approximately 130-foot seawall section. The net increase in task amount is $37,266.00 in fixed fees, bringing the total task amount to $50,996.00. Work is organized into four subtasks: Subtask 2.a (Develop Preliminary Design for Permitting) at $10,118.00; Subtask 2.b (Coordinate and File DEP Application) at $4,284.00; Subtask 2.c (DEP Processing and BDC Coordination) at $5,264.00; and Subtask 2.d (Construction Phase Services) at $17,600.00. The project schedule extends from January 7, 2025, through July 28, 2026, with individual subtasks ranging from 30 to 90 calendar days. All costs are fixed price with no reimbursable expenses. Funding is allocated through FDEP's grant code FD097 with object code U3200 and amount of $37,266.00.

View the file

Other files

File Type Posted
CN-370000-CN331-CMC3.pdf PDF
CN-370000-CN331-T13CO1.pdf PDF
CN-370000-CN331-T14.pdf PDF
CN-370000-CN331-T15.pdf PDF
CN-370000-CN331-T18.pdf PDF
CN-370000-CN331-T21CO2.pdf PDF
CN-370000-CN331-T21CO3.pdf PDF
CN-370000-CN331-T22.pdf PDF
CN-370000-CN331-T22CO2.pdf PDF
CN-370000-CN331-T8.pdf PDF
CN-370000-CN331-CMC1.pdf PDF
CN-370000-CN331-CMC4.pdf PDF
CN-370000-CN331-T1.pdf PDF
CN-370000-CN331-T10.pdf PDF
CN-370000-CN331-T12.pdf PDF
CN-370000-CN331-T13.pdf PDF
CN-370000-CN331-T13CO3.pdf PDF
CN-370000-CN331-T16CO2.pdf PDF
CN-370000-CN331-T1CO2.pdf PDF
CN-370000-CN331-T1CO3.pdf PDF
CN-370000-CN331-T1CO4.pdf PDF
CN-370000-CN331-T21CO1.pdf PDF
CN-370000-CN331-T22CO4.pdf PDF
CN-370000-CN331-T23CO2.pdf PDF
CN-370000-CN331-T3.pdf PDF
CN-370000-CN331-T4CO1.pdf PDF
CN-370000-CN331-T5.pdf PDF
CN-370000-CN331-T9.pdf PDF
PC-370000-CN331.pdf PDF
CN-370000-CN331-CMC5.pdf PDF
CN-370000-CN331-T13CO4.pdf PDF
CN-370000-CN331-T15CO1.pdf PDF
CN-370000-CN331-T16.pdf PDF
CN-370000-CN331-T17.pdf PDF
CN-370000-CN331-T17CO1.pdf PDF
CN-370000-CN331-T18CO4.pdf PDF
CN-370000-CN331-T19.pdf PDF
CN-370000-CN331-T1CO1.pdf PDF
CN-370000-CN331-T20.pdf PDF
CN-370000-CN331-T4CO2.pdf PDF
CN-370000-CN331-T4CO3.pdf PDF
CN-370000-CN331-T7.pdf PDF
CN-370000-CN331-CMC2.pdf PDF
CN-370000-CN331-R1.pdf PDF
CN-370000-CN331-T11.pdf PDF
CN-370000-CN331-T13CO2.pdf PDF
CN-370000-CN331-T16CO1.pdf PDF
CN-370000-CN331-T18CO1.pdf PDF
CN-370000-CN331-T18CO2.pdf PDF
CN-370000-CN331-T21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Budget Representative, FDEP Date

Project Manager, FDEP Date

Contract Manager, FDEP Date

Consultant Date

Contract Authority, FDEP Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN331 23 1 6M408C

Seawall Reconstruction

Humiston & Moore Engineers

Brett Moore (239) 825-6518 bdm@humistonandmoore.com

Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov

The purpose of this Change Order is for the design, permitting and construction observation of the short-term seawall

$ 0.00 $ 13,730.00 $ 13,730.00 $ 0.00 $ 13,730.00 $ 13,730.00 $ 0.00 $ 37,266.00 $ 37,266.00 $ 0.00 $ 50,996.00 $ 50,996.00

01/07/2025

06/28/2026

07/28/2026

07/28/2026

Tamika Bass

Garland Sandel

Approval Signatures:

Signature

Signature

Signature

Signature

Signature

Ralph Perkins

Brett D. Moore, P.E.

Michael W. Foster Jr., P.E.

$ 0.00

Gasparilla Island State Park

6M408C FD097 37504003191 080039/25 408001 U3200 131500 PF $ 37,266.00

$ 37,266.00