CN-370000-CN331-T18CO2.pdf

PDF 743 KB Posted

Attached to
Master Agreement FL|CN331|fe7bede2f31aebfb9d3246ac73b5aa57
Contract number
CN331
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN331. The document authorizes a change order for work being performed by Humiston & Moore Engineers, a coastal engineering firm specializing in design and permitting, in partnership with Pinnacle Ecological, Inc. The project involves nature-based erosion control work at Von D. Mizell-Eula Johnson State Park in Dania, Florida, and requires coordination with the U.S. Army Corps of Engineers (USACE) for permitting purposes.

Change Order No. 02 adds $12,373.48 in funding to the original task amount of $81,472.12, bringing the total task cost to $93,845.60. The funding supports the execution of Subtask 4a: a pre-construction Submerged Aquatic Resources (SAR) survey to facilitate USACE permit processing. The survey work consists of two subtasks: Subtask 4a1 ($4,259.28) covers initial benthic assessment and presence/absence documentation of seagrasses, while Subtask 4a2 ($8,114.20) includes quantification of seagrasses, data analysis, and final reporting. The scope requires approximately two field days to complete benthic assessment and seagrass surveying within 20 feet of mean low water and the previous edge of documented seagrass, with deliverables including a seagrass survey report and resource delineation map. The project end date remains December 30, 2024, and payment is contingent upon FDEP approval of deliverables.

View the file

Other files

File Type Posted
CN-370000-CN331-CMC3.pdf PDF
CN-370000-CN331-T13CO1.pdf PDF
CN-370000-CN331-T14.pdf PDF
CN-370000-CN331-T15.pdf PDF
CN-370000-CN331-T18.pdf PDF
CN-370000-CN331-T21CO2.pdf PDF
CN-370000-CN331-T21CO3.pdf PDF
CN-370000-CN331-T22.pdf PDF
CN-370000-CN331-T22CO2.pdf PDF
CN-370000-CN331-T8.pdf PDF
CN-370000-CN331-CMC5.pdf PDF
CN-370000-CN331-T13CO4.pdf PDF
CN-370000-CN331-T15CO1.pdf PDF
CN-370000-CN331-T16.pdf PDF
CN-370000-CN331-T17.pdf PDF
CN-370000-CN331-T17CO1.pdf PDF
CN-370000-CN331-T18CO4.pdf PDF
CN-370000-CN331-T19.pdf PDF
CN-370000-CN331-T1CO1.pdf PDF
CN-370000-CN331-T20.pdf PDF
CN-370000-CN331-T4CO2.pdf PDF
CN-370000-CN331-T4CO3.pdf PDF
CN-370000-CN331-T7.pdf PDF
CN-370000-CN331-CMC2.pdf PDF
CN-370000-CN331-R1.pdf PDF
CN-370000-CN331-T11.pdf PDF
CN-370000-CN331-T13CO2.pdf PDF
CN-370000-CN331-T16CO1.pdf PDF
CN-370000-CN331-T18CO1.pdf PDF
CN-370000-CN331-T21.pdf PDF
CN-370000-CN331-T22CO1.pdf PDF
CN-370000-CN331-T22CO3.pdf PDF
CN-370000-CN331-T23.pdf PDF
CN-370000-CN331-T23CO1.pdf PDF
CN-370000-CN331-T24.pdf PDF
CN-370000-CN331-T3C01.pdf PDF
CN-370000-CN331-T4.pdf PDF
CN-370000-CN331-TA6.pdf PDF
CN-370000-CN331.pdf PDF
CN-370000-CN331-CMC1.pdf PDF
CN-370000-CN331-CMC4.pdf PDF
CN-370000-CN331-T1.pdf PDF
CN-370000-CN331-T10.pdf PDF
CN-370000-CN331-T12.pdf PDF
CN-370000-CN331-T13.pdf PDF
CN-370000-CN331-T13CO3.pdf PDF
CN-370000-CN331-T16CO2.pdf PDF
CN-370000-CN331-T1CO2.pdf PDF
CN-370000-CN331-T1CO3.pdf PDF
CN-370000-CN331-T1CO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN331 18 02 61379C

Von D. Mizell-Eula Johnson State Park Erosion Repair Dania Canal

Humiston and Moore Engineers

Brett Moore, P.E. 239-825-6518 bdm@humistonandmoore.com

Ralph Perkins or successor 8502452460 Ralph.Perkins@FloridaDEP.gov

This change order sets out to add funding to perform a pre-construction Submerged Aquatic Resources (SAR) survey to facilitate USACE permit processing per proposal dated December 06, 2023.

$ 2,000.00 $ 79,472.12 $ 81,472.12 $ 2,000.00 $ 79,472.12 $ 81,472.12

$ 0.00 $ 12,373.48 $ 12,373.48 $ 2,000.00 $ 91,845.60 $ 93,845.60

03/04/2022

12/31/2023

12/30/2024

12/30/2024

Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.03.04 10:09:09 -05'00'

Joel Pollock Joel Pollock Digitally signed by Joel Pollock Date: 2024.03.04 10:25:54 -05'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.03.04 10:40:21 -05'00'

Brett Moore P.E. Brett Moore Digitally signed by Brett Moore Date: 2024.03.04 16:34:55 -05'00'

Micahel W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2024.03.06 15:46:13 -05'00'

61379C 37505000107 080039/22 423001 U3200 131500 QK $ 12,373.48

$ 12,373.48

December 6, 2023

Joel Pollock, Project Manager Florida Department of Environmental Protection Bureau of Design and Construction 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: DEP Agreement CN331 - Humiston & Moore Engineers Nature-Based Erosion Control – Von D. Mizell – Eula Johnson State Park Task Assignment Number – 18 – CO# Pre-construction Benthic Survey I Work Areas

Dear Mr. Pollock, Humiston & Moore has prepared the attached proposal summary and man-hour documentation to conduct a pre-construction Submerged Aquatic Resources (SAR) survey to facilitate USACE permit processing. The survey will extend 20 feet seaward of the previous edge of seagrass documented in August 2022 as requested by USACE in order to allow for processing of an application in the interim. The survey will be conducted in the two work areas shown in Figure 1.

Should you require any additional information to process this request, please advise.

Sincerely, HUMISTON & MOORE ENGINEERS

Brett D. Moore, P.E., BC.CE., President

Nature Based Erosion Control Pre-Construction Seagrass Survey

Von D. Mizell – Eula Johnson State Park

CN331 - TA # 18 – CO#

Subtask 4a: Submerged Aquatic Resources Survey Description: A Submerged Aquatic Resources (SAR) survey completed in August 2022 was sufficient to facilitate pre-construction meetings with the regulatory agencies. Preli9minary design has avoided impacts to documented seagrass. To facilitate the ability to proceed with regulatory permitting and processing of applications, the U.S. Army Corps of Engineers (USACE) has agreed to accept a pre-construction seagrass survey in the vicinity of the proposed area of work as sufficient for ensuing avoidance of seagrasses. The requirements will need to update the benthic survey data within 20 feet of MLW. And the previous edge of documented seagrass.

Costs will include the benthic assessment and SAV survey, data analysis, and an assessment report summarizing the survey results and field observations. In addition to the benthic assessment report, deliverables will include a map of delineated resources and copies of representative still photographic data collected during the in-water field surveys.

Deliverable:

4a1 - Electronic copy of seagrass survey report documenting presence/absence of seagrasses in pdf format.

4a2 - Electronic copy of seagrass survey report documenting quantification of seagrasses in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 4a1 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Humiston & Moore Engineer II 96.00 6 576.00 Pinnacle Ecological Senior Scientist 71.68 16 1,146.88 Pinnacle Ecological Field Scientist III 63.41 40 2,536.40

Subtotal for Subtask 4a1: $4,259.28

Subtask 4a2 Firm Name Position Classification Hourly Rate Hours Total Fixed

Price Cost Pinnacle Ecological Principal Scientist 85.47 20 1,709.40 Pinnacle Ecological Senior Scientist 71.68 20 1,433.60 Pinnacle Ecological Field Scientist III 63.41 20 1,268.20 Pinnacle Ecological Field Scientist II 55.14 20 1,102.80 Pinnacle Ecological Biological Technician 44.11 20 882.20 Equipment and Vessel Daily Rate 859.00 2 day 1,718.00

Total for Subtask 4a2: $8,114.20 Total for Subtasks 4a1 and 4a2: $12,373.48

Schedule: The benthic assessment and SAV survey will require approximately two (2) field days to complete. Following completion of the field work and data collection, Pinnacle’s scientific team will conduct data analysis, plot delineation data to generate a resource map, and prepare a draft report for the area surveyed. The draft report will be ready for review within 4 weeks following completion of the field effort. A final report will be submitted 1 week following completion of the draft review.

Project Schedule:

Activity Duration (From contract execution) Subtask 4a: Pre-con SAV & Report 1,000*

*timeline from initial authorization for Task 18 .

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 4a: Pre-con SAV Survey & Report $12,373.48 $0.00

Total Fixed Price Cost: $12,373.48 Total Reimbursable Cost: $0.00

Overall Total Cost Task 18: $93, Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.