CN-370000-CN331-T22.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CN331|fe7bede2f31aebfb9d3246ac73b5aa57
Contract number
CN331
Issued by
Florida

About this file

Task Assignment Summary

This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under contract CN331 with Humiston & Moore Engineers for coastal resiliency enhancements at Gasparilla Island State Park. The task assignment, designated TA22, is managed by the FDEP Bureau of Design and Construction with Marc Damon, P.E. serving as the consultant representative and Ralph Perkins as the FDEP contract manager. The project is located at Gasparilla Island State Park in Florida and involves coordination with the U.S. Army Corps of Engineers (USACE) regarding the adjacent Gasparilla Island Shore Protection Project.

The contract scope comprises four subtasks with a total fixed price cost of $112,550.00 and no reimbursable costs. Subtask 1 addresses site review and topographic/bathymetric survey work ($28,120.00); Subtask 2 involves historic review, data assessment, and permeability analysis ($24,396.00); Subtask 3 includes alternatives analysis and engineering design with permit-ready deliverables ($38,184.00); and Subtask 4 provides beach nourishment coordination with USACE through a scheduled 2024 fill placement event ($21,850.00). The project schedule extends up to 720 calendar days from authorization, with individual subtasks scheduled for completion within 90, 180, 270, and 720 days respectively. Payment is contingent upon FDEP approval of deliverables for each subtask, with work focused on enhancing sediment retention, protecting the historic lighthouse, and evaluating erosion control structure modifications.

View the file

Other files

File Type Posted
CN-370000-CN331-CMC3.pdf PDF
CN-370000-CN331-T13CO1.pdf PDF
CN-370000-CN331-T14.pdf PDF
CN-370000-CN331-T15.pdf PDF
CN-370000-CN331-T18.pdf PDF
CN-370000-CN331-T21CO2.pdf PDF
CN-370000-CN331-T21CO3.pdf PDF
CN-370000-CN331-T22CO2.pdf PDF
CN-370000-CN331-T8.pdf PDF
CN-370000-CN331-CMC5.pdf PDF
CN-370000-CN331-T13CO4.pdf PDF
CN-370000-CN331-T15CO1.pdf PDF
CN-370000-CN331-T16.pdf PDF
CN-370000-CN331-T17.pdf PDF
CN-370000-CN331-T17CO1.pdf PDF
CN-370000-CN331-T18CO4.pdf PDF
CN-370000-CN331-T19.pdf PDF
CN-370000-CN331-T1CO1.pdf PDF
CN-370000-CN331-T20.pdf PDF
CN-370000-CN331-T4CO2.pdf PDF
CN-370000-CN331-T4CO3.pdf PDF
CN-370000-CN331-T7.pdf PDF
CN-370000-CN331-CMC2.pdf PDF
CN-370000-CN331-R1.pdf PDF
CN-370000-CN331-T11.pdf PDF
CN-370000-CN331-T13CO2.pdf PDF
CN-370000-CN331-T16CO1.pdf PDF
CN-370000-CN331-T18CO1.pdf PDF
CN-370000-CN331-T18CO2.pdf PDF
CN-370000-CN331-T21.pdf PDF
CN-370000-CN331-T22CO1.pdf PDF
CN-370000-CN331-T22CO3.pdf PDF
CN-370000-CN331-T23.pdf PDF
CN-370000-CN331-T23CO1.pdf PDF
CN-370000-CN331-T24.pdf PDF
CN-370000-CN331-T3C01.pdf PDF
CN-370000-CN331-T4.pdf PDF
CN-370000-CN331-TA6.pdf PDF
CN-370000-CN331.pdf PDF
CN-370000-CN331-CMC1.pdf PDF
CN-370000-CN331-CMC4.pdf PDF
CN-370000-CN331-T1.pdf PDF
CN-370000-CN331-T10.pdf PDF
CN-370000-CN331-T12.pdf PDF
CN-370000-CN331-T13.pdf PDF
CN-370000-CN331-T13CO3.pdf PDF
CN-370000-CN331-T16CO2.pdf PDF
CN-370000-CN331-T1CO2.pdf PDF
CN-370000-CN331-T1CO3.pdf PDF
CN-370000-CN331-T1CO4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN331 TA22 FDEP ARPLE1

Gasparilla Island State Park Coastal Resiliency Enhancement

Humiston & Moore Engineers

Marc Damon, P.E. 239-566-0649 Ext. 7 mdamon@humistonandmoore.com

Ralph Perkins 850-245-2560 Ralph.Perkins@FloridaDEP.gov

To provide data collection, alternatives analysis, and engineering for enhancements to coastal resiliency at Gasparilla Island State Park per the attached proposal dated July 20, 2023.

Garland Sandel or successor

Upon execution $ 112,550.00 07/27/2026 $ 0.00

$ 112,550.00

Lisa Yarborough Lisa Yarborough Digitally signed by Lisa Yarborough Date: 2023.07.26 12:24:41 -04'00' 7/26/2023

Garland Sandel

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.07.26 16:32:09 -04'00'

Brett Moore, P.E. Brett Moore Digitally signed by Brett Moore Date: 2023.07.31 15:41:48 -04'00'

Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2023.08.03 15:21:24 -04'00'

ARPLE1 CSFRF 37538010000 085176/22 000286 U1671 241000 AD $ 112,550.00

$ 112,550.0037101000286375004000008517622

Garland Sandel Digitally signed by Garland Sandel Date: 2023.07.26 13:56:58 -04'00'

20 July, 2023 Garland Sandel, Design Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: DEP Agreement CN331 - Humiston & Moore Engineers Conceptual Alternatives Analysis for Coastal Resiliency Enhancements Gasparilla Island State Park Task Assignment Number – xx

Dear Mr. Sandel, Gasparilla Island State Park (the Park) is located at the southern tip of Gasparilla Island. The park shoreline fronts both the Gulf of Mexico and Boca Grande Pass, a natural deep-water inlet. The Gulf beach is supported by two terminal groins at the south end of the park. These structures were installed several decades ago to reduce erosion in the vicinity of the historic lighthouse. The structures have been both buried and emergent over time and appear to allow some bypassing to the inlet bank. To the north of the Park’s Gulf beach is a historic seawall that acts similar to a terminal groin supporting the beach to the north. However, the seawall also interrupts sand exchange and limits supply to the Park’s main beach.

The Park’s Gulf beaches have been managed by beach nourishment since the 2000’s, which has been found to erode relatively rapidly. The Gulf beach was severely impacted by Hurricane Irma and several other tropical systems in recent years. In 2019 the Gulf beach was included as a “betterment” add-on project to the adjacent US Army Corps of Engineers (USACE) Gasparilla Island Shore Protection Project (SPP). It is understood that the USACE is proceeding toward a fill placement event at the SPP scheduled for 2024. This Task Assignment includes a subtask to provide design coordination, construction administration, and environmental and geotechnical review and coordination with USACE on behalf of the Bureau of Design and Construction.

This Task Assignment will provide data collection, alternatives analysis, and engineering for enhancements to coastal resiliency at the Park. A final analysis will provide a summary of coastal conditions at the park over time, including performance of past beach fill placement, assessment of groin permeability, alternatives analysis and engineering for coastal resiliency enhancement project at the Park. Alternatives and engineering design will focus on enhancing sediment retention adjacent to existing erosion control structures and maintaining and protection for the lighthouse on both the Gulf and Inlet shorelines.

Sincerely, HUMISTON & MOORE ENGINEERS

Marc Damon, P.E.

Robinson_MS Text Box

Alternatives Analysis for Coastal Resiliency Enhancements at

Gasparilla Island State Park

CN331 - TA #xx

Subtask 1: Site Review and Topographic / Bathymetric Survey

Description: H&M will review the existing structures to evaluate structural integrity, dimensions, and function relative to the coastal conditions at the time of the site visit. Topographic and Bathymetric survey data will be collected by Hyatt Survey Services to establish existing conditions, gather additional data between the monuments collected during annual monitoring, and assess the beach in the vicinity of the existing structures.

Deliverable:

• Survey data in .xyz format, plots of survey data, and drawings in native autocad format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 1

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Humiston & Moore Engineers Project Manager $206.00 10 $2,060.00

Humiston & Moore Engineers Senior Engineer $172.00 12 $2,064.00

Humiston & Moore Engineers Engineer II $96.00 18 $1,728.00

Humiston & Moore Engineers Administrative $62.00 2 $124.00

Hyatt Survey Surveyor and Mapper $144.00 12 $1,728.00

Hyatt Survey Survey Technician $105.00 52 $5,460.00

Hyatt Survey 3 Person Topo Crew $171.00 56 $9,576.00

Hyatt Survey 3 Person Hydro Crew $174.00 20 $3,480.00

Hyatt Survey RTK GPS Base/Rover Kit $100.00 5 $500.00

Hyatt Survey Hydro Survey System (Single Beam)

$700.00 2 $1,400.00

Subtotal for Subtask 1: $28,120.00

Subtask 2: Historic Review, Data Assessment, and Permeability Analysis

Description: H&M will compile relevant available historic beach profile data and aerial photography at the park. Sources of data may include DEP Beaches, Inlets and Ports Program (BIPP), US Army Corps of

Engineers (USACE) project delivery monitoring data, project monitoring analysis, publicly available rectified aerial photos and H&M’s in-house aerial photography database.

Beach profile information will be used to determine historic trends in shore position and volume change throughout the park, including response to nourishment projects. This assessment will provide a general evaluation as to past fill performance and develop an understanding of the permeability of the existing terminal groins.

Robinson_MS Text Box

Deliverable:

• Plots of historic beach profiles from survey data and aerial imagery. Plots will be provided in .pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 2

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Humiston & Moore Engineers Project Manager $206.00 13 $2,678.00

Humiston & Moore Engineers Senior Engineer $172.00 30 $5,160.00

Humiston & Moore Engineers Engineer III $123.00 54 $6,642.00

Humiston & Moore Engineers Engineer II $96.00 102 $9,792.00

Humiston & Moore Engineers Administrative $62.00 2 $124.00

Subtotal for Subtask 1: $24,396.00

Subtask 3: Alternatives Analysis and Engineering Design

Description: This subtask will provide alternatives analysis and engineering design. Several conceptual alternatives will be developed to approximately 10% detail for comparison. This will allow development of planning level construction quantities and costs (Class D estimates), anticipated shoreline response, and permitting considerations. At this stage, shoreline response will be evaluated based upon engineering experience and assessment of recent data and prior model studies for comparison of management strategies. H&M will provide a progress update via web conference to review alternatives with BDC and

DEP BIPP to select a design alternative before proceeding to engineering analysis.

After design selection, Engineering design and a technical analaysis will be prepared to support future permitting of erosion control structures. A design engineering analysis and permit plans will be prepared. A design review meeting will be conducted by web conference to receive comments on the draft prior to finalizing the report and drawings.

Deliverable: Technical engineering analysis documenting beach conditions and anticipated response to fill for conceptual design alternatives. Engineering analysis for the selected design will be documented for the preferred design alternative. The report will include permit plans to form the basis for a preapplication meeting with State and Federal permitting agencies. The report will be provided in .pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 3

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Humiston & Moore Engineers Project Manager $206.00 26 $5,356.00

Humiston & Moore Engineers Senior Engineer $172.00 60 $10,320.00

Humiston & Moore Engineers Engineer III $123.00 92 $11,316.00

Humiston & Moore Engineers Engineer II $96.00 114 $10,944.00

Humiston & Moore Engineers Administrative $62.00 4 $248.00

Total for Subtask 3: $38,184.00

Subtask 4: Beach Nourishment Coordination with USACE

Description: This subtask provides design and construction administration coordination between BDC and

USACE for the upcoming nourishment event in 2024. Beach fill at the State Park has been placed by USACE as a betterment add-on in the past. H&M will work with USACE and BDC throughout the betterment approval process and construction. Anticipated tasks include quantity calculations, project narrative descriptions, attendance at construction meetings, and coordination of post construction compliance items.

Deliverable: Summary notes from project meetings. Meeting notes will be provided in .pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Subtask 4

Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost

Humiston & Moore Engineers Project Manager $206.00 26 $5,356.00

Humiston & Moore Engineers Senior Engineer $172.00 16 $2,752.00

Humiston & Moore Engineers Engineer III $123.00 66 $8,118.00

Humiston & Moore Engineers Engineer II $96.00 56 $5,376.00

Humiston & Moore Engineers Administrative $62.00 4 $248.00

Total for Subtask 4: $21,850.00

Project Schedule:

Activity Duration (Max. Calendar Days from Authorization)

Subtask 1: Inspection and Survey 90

Subtask 2: Background and Data Review 180

Subtask 3: Alternatives and Pre-Engineering 270

Subtask 4: Nourishment Coordination 720

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 1: Inspection and Survey $28,120.00

Subtask 2: Background and Data Review $24,396.00

Subtask 3: Alternatives and Pre-Engineering $38,184.00

Subtask 4: Nourishment Coordination $21,850.00

Total Fixed Price Cost: $112,550.00

Total Reimbursable Cost: $0.00

Overall Total Cost: $112,550.00

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.