CN-370000-CN331-T3.pdf
PDF 201 KB Posted
- Contract number
- CN331
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) for Professional Services Agreement CN331 with Humiston & Moore Engineers, P.A., a coastal engineering firm specializing in design and permitting. The project involves obtaining a Joint Coastal Permit (JCP) to authorize sand placement between the Belcher Road Seawall and the southern tip of Gasparilla Island at Gasparilla Island State Park in Lee County, Florida. The consultant representative is Brett Moore, and the FDEP Contract Manager is Mae Roth. The contract was executed under Project No. 40736, with a project location at Gasparilla Island S.P. Marshall Flake serves as the Project Manager for FDEP.
The scope of work encompasses four subtasks: site visit and data collection ($11,494.00), FDEP and USACE pre-application meeting preparation ($8,072.00), JCP and USACE permitting ($12,236.00), and final design, permitting, and permit filing ($11,152.00), for a total fixed price cost of $42,954.00 with no cost reimbursement allowed. The work commenced upon execution with a completion date of January 1, 2019. Payment will be made upon FDEP approval of deliverables for each subtask. The project schedule indicates subtasks 1 and 2 require 30 days each, subtask 3 requires 120 days, and all work must be completed by January 1, 2019. The contract is designed to facilitate the permitting process for extending beach fill at the state park consistent with previous construction authorized in 2007.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .