This file contains mechanical and electrical design drawings and specifications for the rehabilitation of the Kawuneeche Visitor Center at Rocky Mountain National Park in Colorado (Project 326235).
The mechanical scope includes HVAC system calculations and plumbing design. The plumbing work encompasses domestic water supply, hot water recirculation systems, natural gas piping, and sanitary/vent drainage. Key fixtures specified include water closets (1.28 GPF), lavatories with thermostatic mixing valves (0.5 GPM), electric water heaters (2.5 kW and 10 kW models), gas water heater (76,000 BTU), mop sinks, drinking fountains, floor drains, and associated backflow preventers. Water supply fixture unit calculations indicate 117 WSFU for the comfort station (72 GPM demand) and 47 WSFU for the admin wing (49 GPM demand). Sanitary drainage loads total 61.5 DFU for the comfort station and 18 DFU for the visitor center/admin wing. Gas piping sizing indicates 820 CFH total load requiring a 2-inch main. Outside air quantity calculations per ASHRAE 62.1-2019 range from 111.4 to 400.7 CFM across five HVAC zones.
The electrical scope includes power distribution, lighting controls, mechanical equipment connections, and lightning protection. Three panelboards (L1A, L2A, L3A) with 200-amp capacity serve various loads including split-system air conditioning, gas furnaces (ranging from 10.3 to 14.1 MCA), electric water heaters, and recirculation pumps. Lighting design incorporates wireless control systems with occupancy and daylight sensors, emergency battery backup fixtures, and networked lighting zones. Electrical service feeds include a 25 kVA utility transformer with 100 kA external surge protection. Requirements include an electric vehicle charging station (Level 2, 7.7 kW dual-port), emergency power off (EPO) system for server room, downspout heat trace systems, and motorized door operators. Fault current calculations range from 3,067 to 13,923 amperes at various distribution points. All work must comply with 2024 IBC, IPC, IMC, IFGC, IECC, 2023 NEC, and ASHRAE 90.1-2022 standards.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GF-1
GF-2
GF-3
GF-4
GF-5
GENERAL NOTES
A.
SYSTEM NOTES
Multi-Zone
Multi-Zone
Multi-Zone
Single Zone
Single Zone
As
(SQ. FT)
Ps
(People)
Ez
1.0
1.0
1.0
0.8
0.8
Vot
(CFM)
111.4
322.7
222.6
400.7
176.3
(CFM)
YES
YES
YES
YES
YES
NotesSystem Name and Number
ASHRAE 62.1 - 2019: Outside Air Calculations Summary
System
Type
System Floor Area
System Population
Average Air Distribution
Effectiveness
Outdoor Air Intake Flow (required by
62.1)
Outdoor Air Intake Flow
Provided (measured or design)
Outdoor air intake flow provided meets or exceeds
Vot?
MULTI-ZONE SYSTEM OUTSIDE AIR QUANTITY WAS CALCULATED USING THE SIMPLIFIED METHOD IN SECTION 6.4.2.3
THIS TABLE IS PROVIDED AS A CONDENSED SUMMARY OF THE CALCULATIONS FOR EACH SYSTEM. EACH SYSTEM'S OUTSIDE AIR QUANTITIES ARE CALCULATED USING THE VENTILATION RATE PROCEDURE OUTLINED IN SECTION 6.2 AND BASED ON THE SYSTEM TYPE
CLASSIFIED USING SECTIONS 6.2.2, 6.2.3, AND 6.2.4.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
/7
/2
:3 :0
P
M A u to d e sk
D o cs
-2
N
P S
R O
M O
K a w u n e e ch e V
C D
D -C
A w
O ta k/ R
O M
O K
V C
M e ch
-P lu m b .r vt
M800
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 104 177
MECHANICAL CALCS
AND COMCHECK
01/16/26
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
/7
/2
:3 :0
P
M A u to d e sk
D o cs
-2
N
P S
R O
M O
K a w u n e e ch e V
C D
D -C
A w
O ta k/ R
O M
O K
V C
M e ch
-P lu m b .r vt
M801
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 105 177
MECHANICAL CALCS
AND COMCHECK
PLUMBING ABBREVIATIONS
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
BLDG BUILDING
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CW COLD WATER
CWV COMBINATION WASTE AND VENT
Cx COMMISSIONING
(D) DEMOLISH
DIA DIAMETER
DFU DRAINAGE FIXTURE UNIT
(E) EXISTING
FD FLOOR DRAIN
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FPM FEET PER MINUTE
GPM GALLONS PER MINUTE
GW GREASE WASTE
GPM GALLON PER MINUTE
HW HOT WATER
HWC HOT WATER CIRCULATION
HT HEAT TRACE
ID INDIRECT DRAIN
I.D. INSIDE DIAMETER
LPG LIQUEFIED PETROLEUM GAS (PROPANE)
MAX MAXIMUM
MIN MINIMUM
(N) NEW
NG NATURAL GAS
NIC NOT IN CONTRACT
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PSIA POUNDS PER SQUARE INCH (ABSOLUTE)
PSIG POUNDS PER SQUARE INCH (GAUGE)
(R) RELOCATED
RE:__ REFERENCE ____
REQ REQUIRED/REQUIREMENT
SF SQUARE FEET
STD STANDARD
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VENT
VTR VENT THRU ROOF
W WASTE
W.C. WATER COLUMN
WSFU WATER SUPPLY FIXTURE UNIT
PIPING SERVICES
NATURAL GAS
COLD WATER (CW)
HOT WATER (HW)
HOT WATER RECIRCULATION (HWC)
VENT (V)
WASTE ABOVE (W)
WASTE BELOW (W)
CONDENSATE ABOVE (CD)
GAS (G)
PLUMBING LEGEND
G
DRAWING NOTATION
NEW TO EXISTING
NEW WORK
EXISTING ITEMS
EXISTING ITEMS TO BE DEMOLISHED
PIPING SYSTEM COMPONENTS
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
UNION
FLEXIBLE CONNECTION
FLOOR DRAIN
FLOOR SINK
DRAIN VALVE
VENTURI TYPE
BALANCING VALVE
STRAINER
FLOW SENSOR
TEMPERATURE SENSOR
GRADE CLEAN OUT
FLOOR CLEAN OUT
WALL CLEAN OUT
AUTOMATIC AIR CENT
GAUGE
THERMOMETER
MANUAL AIR VENT
P&T TAP
IN LINE PUMP
METER
THERMOSTAT
PRESSURE SENSOR
T
P
S
FS
FCO
GCO
M
VALVES
GATE VALVE
BALL VALVE
PLUG VALVE
CHECK VALVE
2WAY ATC VALVE
3WAY ATC VALVE
PRESSURE REDUCING VALVE
SAFETY RELIEF VALVE
BACK FLOW PREVENTER
BALANCING VALVE
BUTTERFLY VALVE
THREE WAY CONTROL VALVE
PLUMBING NOTES
1. GENERAL
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS
SHALL BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
2. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE CONTRACTING OFFICER IF
ANY CONFLICTS OCCUR.
3. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER FOR RESOLUTION OF ANY DISCREPANCIES, OMISSIONS, OR CLARIFICATIONS, BEFORE SOLICITATION DATE. IN THE EVENT THAT AN INTERPRETATION OF SOLICITATION DOCUMENTS IS NECESSARY AFTER THE SOLICITATION DATE, THE DECISION OF THE CONTRACTING OFFICER SHALL BE FINAL AND BINDING.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS OF ALL CHANGE ORDERS, WHICH THE CONTRACTING OFFICER HAS NOT APPROVED IN WRITING PRIOR TO THE EXECUTION OF THE ASSOCIATED
WORK.
5. IN THE CASE OF A CONFLICT, UNLESS OTHERWISE NOTED, KEYNOTES ON PLUMBING PLANS SHALL
SUPERCEDE ANY GENERAL NOTES ON THE PLANS.
6. ALL REMOVED EQUIPMENT SHALL REMAIN THE PROPERTY OF THE FEDERAL GOVERNMENT AND SHALL BE
STORED OR DISPOSED OF PER THE DIRECTION OF THE CONTRACTING OFFICER.
2. EXECUTION
1. ALL PLUMBING WORK SHALL COMPLY WITH LOCAL CODES AND ORDINANCES.
2. PITCH WASTE LINES NOT LESS THAN 1/4" PER FOOT. (UNLESS NOTED OTHERWISE).
3. RUN ALL PIPING ON WARM SIDE OF BUILDING INSULATION. PIPE INSULATION IS NOT CONSIDERED FREEZE
PROTECTION.
4. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS BETWEEN DISSIMILAR METALS, I.E., IRON VALVES AND
COPPER TUBING.
5. PROVIDE PIPE HANGERS OF THE SAME MATERIAL AS THE PIPING SYSTEM OR USE COATED HANGERS.
6. SET FLOOR DRAINS SO THAT TOP WILL BE SLIGHTLY LOWER THAN SURROUNDING FLOOR.
7. PROVIDE BALL VALVES AND UNIONS ON ALL LINES TO EQUIPMENT FOR ISOLATION AND REMOVAL.
8. PLUMBING CONTRACTOR SHALL CHECK OPERATION AND CONDITION OF ALL EXISTING PLUMBING EQUIPMENT WITHIN THE CONFINES OF THIS SPACE, AND PREPARE A WRITTEN LIST OF DEFICIENCIES IN EQUIPMENT OPERATION OR CONDITION. LIST SHALL BE SUBMITTED TO THE CONTRACTING OFFICER WITHIN 2 WEEKS OF
CONTRACT AWARD DATE.
9. THE CONTRACTOR SHALL X-RAY THE FLOOR AND OBTAIN CONTRACTING OFFICER APPROVAL BEFORE
CUTTING ANY FLOOR PENETRATIONS.
10. WHERE REMOVAL OR RELOCATION OF EXISTING FIXTURES OCCURS, CONTRACTOR SHALL REMOVE ALL WASTE
AND VENT BRANCH LINES NOT REQUIRED FOR NEW, OR REMAINING FIXTURE LOCATIONS.
11. PROVIDE ADHESIVE, MULTICOLOR PIPE LABELS FOR ALL SYSTEMS. PROVIDE EVERY 50 FEET, AND EVERY 25
FEET IN CONGESTED AREAS.
12. CONTRACTOR SHALL FLUSH ALL FLOOR DRAINS PRIOR TO TURNING OVER BUILDING OCCUPANCY TO THE
PARK.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P000
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 106 177
PLUMBING LEGENDS
AND NOTES
PLUMBING SHEET LIST
NUMBER SHEET NAME
P000 PLUMBING LEGENDS AND NOTES
P101 OVERALL DEMO PLUMBING FLOOR PLAN
P111 OVERALL PLUMBING FLOOR PLAN - DOMESTIC & GAS
P121 OVERALL PLUMBING FLOOR PLAN - WASTE & VENT
P300 PLUMBING SECTIONS
P400 PLUMBING DEMO ENLARGED PLANS
P401 PLUMBING ENLARGED PLANS
P500 PLUMBING DETAILS
P600 PLUMBING SCHEDULES
P800 PLUMBING CALCS AND COMCHECK
P900 PLUMBING WASTE AND VENT ISOMETRICS
APPLICABLE CODES:
2024 INTERNATIONAL MECHANICAL CODE (IMC)
2024 INTERNATIONAL BUILDING CODE (IBC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
2024 INTERNATIONAL FUEL GAS CODE (IFGC)
2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2024 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
ASHRAE 90.1-2022
ASHRAE 90.1-2022
NPS SUSTAINABILITY GUIDELINES
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
RR
RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
JC
P400
P400
P400
P400
22.30
3/4"ø CW (E)
(E) HOSE BIBB
22.40
2"ø W (E)
1 1/2"ø CW (E)3/4"ø CW (E) 3/4"ø CW (E)
2"ø W (E)
4"ø W (E)
3/4"ø CW (E)
WASTE & VENTDOMESTIC & GAS
DOMESTIC & GAS WASTE & VENT
(E) HOSE BIBB
(E) WATER SERVICE
ENTRY TO ADMIN AREA
(E) GAS SERVICE UP
FROM BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
22.41
22.49
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P101
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 107 177
OVERALL DEMO
PLUMBING FLOOR
PLAN
GENERAL NOTES:
# KEYNOTES:
22.30 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
ELECTRICAL CONNECTIONS PRIOR TO REMOVAL.
DISCONNECT EXISTING HW AND CW CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS.
22.40 EXISTING GAS PIPING SHALL REMAIN. EXTEND EXISTING
GAS BRANCH PIPING AS NECESSARY TO CONNECT TO
NEW FURNACES.
22.41 EXISTING GAS METER SHALL REMAIN.
22.49 EXISTING GAS PIPING TO BE REMOVED IN MECHANICAL
ROOM. EXISTING BRANCH SHALL BE MADE READY FOR
RECONNECTION TO NEW PIPING.
SCALE AP101
1 OVERALL DEMO PLUMBING FLOOR PLAN
TRUE PLAN
1. SEE REFERENCED ENLARGED PLANS FOR
ADDITIONAL NOTES AND DETAILS IN VARIOUS
AREAS AS INDICATED.
80 168
SCALE OF FEET
ADO
A D
O A
D O
ADOADO
ADO ADO
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
RR
RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
JC
3/4"ø CW (E)
3/4"ø CW (E)
3/4"ø CW (E)
3/4"ø CW (E) 3/4"ø CW
P401
P401
(E) HOSE BIBB (E) HOSE BIBB
EWH-2
KS-1A
22.10
22.41
22.42
22.42
EWC-1
3/4"ø CW
(E) WATER SERVICE
ENTRY BELOW GRADE
TO ADMIN AREA
(E) GAS SERVICE UP
FROM BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
(E) GAS SERVICE DOWN
TO BELOW GRADE
3/4"ø CW
22.38
P401
P401
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P111
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 108 177
OVERALL PLUMBING
FLOOR PLAN -
DOMESTIC & GAS
# KEYNOTES:
22.10 ROUTE CW AND HW, AND EXTEND TO SERVE FIXTURES
SHOWN.
22.38 INSTALL PLUMBING EXPANSION TANK (PET-1) AS SHOWN
IN DETAIL 1/P500.
22.41 EXISTING GAS METER SHALL REMAIN.
22.42 EXTEND 3/4"G TO EACH FURNACE.
SCALE AP111
1 OVERALL PLUMBING FLOOR PLAN - DOMESTIC & GAS
TRUE PLAN
80 168
A D
O A
D O
ADOADO
ADO ADO
J
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
A
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
115RR
113RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
WILDERNESS
DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
JANITOR
MECH. RM
153WOMEN'S RR
MEN'S RR
JC
4"ø W (E)
2"ø W (E)
2"ø W (E)
2"ø W (E)
P401
P401
KS-1A
22.44
EWC-1
1 1/2"ø V
2"ø W
RE: CIVIL FOR CONTINUATION
RE: CIVIL FOR CONTINUATION
22.50
22.51
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P121
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 109 177
OVERALL PLUMBING
FLOOR PLAN - WASTE
& VENT
# KEYNOTES:
22.44 ROUTE WASTE TO CONNECT TO EXISTING. ROUTE ABOVE
SLAB IN CABINETRY IF POSSIBLE. VENT PIPING SHALL
CONNECT TO EXISTING.
22.50 PROVIDE HUB DRAIN FOR WATER HEATER T&P RELIEF.
22.51 VENT THRU WALL AT THIS LOCATION WITH DOWNTURNED
90 DEG ELBOW. PAINTED TO MATCH BUILDING EXTERIOR.
TERMINATION SHALL BE COVERED WITH 1/2" WIRE MESH.
SCALE AP121
1 OVERALL PLUMBING FLOOR PLAN - WASTE & VENT
TRUE PLAN
80 168
FIRST FLOOR
100' - 0"
JC
1 1/2"ø CW (E)
1 1/2"ø CW
EWH-1
RP-1
MS-1
3"ø W
2"ø V
3/4"ø HW
1/2"ø CW
3/4"ø HW
3/4"ø CW (E)
FIRST FLOOR
100' - 0"
L
JC
1 1/2"ø CW (E)
1 1/2"ø CW
EWH-1
PRV-1
FIRST FLOOR
100' - 0"
C B
2"ø CW
2"CW TO COMFORT
STATION FIXTURES
2"ø CW
2"ø CW
1 1/2"ø CW
(E)1-1/2"CW TO ADMIN WING
RPBP-1
RPBP-22"ø CW
PRV-2
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: D
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P300
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 110 177
PLUMBING SECTIONS
SCALE DP300
1 JANITOR'S CLOSET WATER ENTRY - SECTION AA
SCALE DP300
2 JANITOR'S CLOSET WATER ENTRY - SECTION BB
SCALE DP300
3 COMFORT STATION WATER ENTRY - SECTION AA
20 42
D
C
B
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
22.45
22.45
4"ø W (E)
2"ø W (E)
22.35
D
C
B
JANITOR
MECH. RM
WOMEN'S RR
MEN'S RR
22.29
22.29
22.31
22.31
22.3222.32
22.32
22.33
22.34
22.36
22.35
L
M
8 9
RR
RR
JC
22.30
22.29
22.32 22.32
22.33
22.29
L
M
8 9
RR
RR
JC
GCO
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P400
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 111 177
PLUMBING DEMO
ENLARGED PLANS
# KEYNOTES:
22.29 EXISTING LAVATORY TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER PIPING AND MAKE READY
FOR CONNECTION TO NEW FIXTURE. SEE NEW WORK
PLANS FOR DETAILS.
22.30 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
ELECTRICAL CONNECTIONS PRIOR TO REMOVAL.
DISCONNECT EXISTING HW AND CW CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS.
22.31 EXISTING DRINKING FOUNTAIN TO BE REMOVED. REMOVE
EXISTING DOMESTIC WATER, SANITARY, AND VENT PIPING
BACK TO THE MAIN.
22.32 EXISTING WATER CLOSET TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER CONNECTIONS AND MAKE
READY FOR CONNECTION TO NEW FIXTURE. SEE NEW
WORK PLANS FOR DETAILS.
22.33 EXISTING URINAL TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER PIPING AND MAKE READY
FOR CONNECTION TO NEW FIXTURE. SEE NEW WORK
PLANS FOR DETAILS.
22.34 EXISTING WATER HEATER TO BE REMOVED. DISCONNECT
EXISTING DOMESTIC WATER AND GAS CONNECTIONS AND
MAKE READY FOR CONNECTION TO NEW WATER HEATER.
SEE NEW WORK PLANS FOR DETAILS.
22.35 EXISTING DRINKING FOUNTAIN TO BE REMOVED.
DOMESTIC WATER, SANITARY, AND VENT CONNECTIONS
SHALL BE MADE READY FOR RECONNECTION TO NEW
FIXTURE.
22.36 EXISTING WATER SERVICE ENTRY PIPING, VALVES, ETC.
TO BE REMOVED. SEE NEW WORK PLANS FOR NEW
CONFIGURATION OF WATER SERVICE ENTRY.
22.45 WASTE AND VENT PIPING TO LAVATORIES AND DRINKING
FOUNTAINS ARE SHOWN AS ASSUMPTIONS. CONTRACTOR
SHALL VERIFY ROUTING PRIOR TO BEGINNING WORK AND
NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES.
NEW WORK PIPING SHALL FOLLOW A SIMILAR ROUTING TO
EXISTING
SCALE BP400
2 ENLARGED DEMO PLUMBING FLOOR PLAN - WASTE & VENT - COMFORT STATION
SCALE BP400
1 ENLARGED DEMO PLUMBING FLOOR PLAN - DOMESTIC & GAS - COMFORT STATION
SCALE BP400
3 ENLARGED DEMO PLUMBING FLOOR PLAN - DOMESTIC & GAS - ADMIN RESTROOMS
SCALE BP400
4 ENLARGED DEMO PLUMBING FLOOR PLAN - WASTE & VENT - ADMIN RESTROOMS
TRUE PLAN
40 84
ADOADO
ADO ADO
ADOADO
ADO ADO
D
C
B
GWH-1
MEN'S RR
JANITOR
1"ø CW (E)
3/4"ø HW (E)
3/4"ø HW
22.12
RP-2
P300
UR-1UR-1UR-1
L-1AL-1A
L-1A
L-1A L-1A L-1A
MS-1
WC-1AWC-1 WC-1 WC-1WC-1
WC-1
WC-1A
2"ø CW
RPBP-1
RPBP-2
22.42
22.38
3/4"ø G (E)
EWC-2
PRV-2
D
B
JANITOR
152MEN'S RR
WOMEN'S RR
MECH. RM
4"ø W (E)
2"ø W (E)
4"ø W (E)
22.24
L-1A L-1A
L-1A
L-1A
L-1AL-1A
P300
UR-1UR-1UR-1
1 1/2"ø V (E)
FS-1
4"ø W
MS-1
4"ø W
WC-1 WC-1WC-1WC-1 WC-1A
WC-1A WC-1
FD-1 FD-1
FD-1
FD-1
FCO
VENT THRU
WALL WITH
ELBOW IN
SOFFIT
22.48
22.48
L
M
8 9
P300
RR
RR
JC
L-1AL-1A
WC-1A WC-1A
3/4"ø CW (E)
3/4"ø CW (E)
1 1/2"ø CW (E)
P300
EWH-1
1"ø CW (E)
RP-1
MS-1
MS-1
22.38
PRV-1
L
M
8 9
WC-1A
L-1A L-1A
WC-1A
RR
RR
JC
FD-1FD-1
MS-1
4"ø W (E)
3"ø W
22.39
EXISTING GRADE CLEANOUT
22.46
L
M
10 11 12
MECH. / ELEC.
GF-1 GF-2 GF-3
2"ø G (E)
3/4"ø G 3/4"ø G
3/4"ø G
H
GF-5
GF-4
MECH. RM
1"ø G (E)
1"ø G
3/4"ø G
3/4"ø G
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P401
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 112 177
PLUMBING ENLARGED
PLANS
SCALE BP401
1 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - COMFORT STATION
# KEYNOTES:
22.12 WATER PIPING CONTINUES TO SUPPLY. RE: CIVIL FOR
CONTINUATION.
22.24 WASTE PIPING TO DOWNSTREAM CONNECTION. RE: CIVIL
FOR CONTINUATION.
22.38 INSTALL PLUMBING EXPANSION TANK (PET-1) AS SHOWN
IN DETAIL 1/P500.
22.39 WATER HEATER P&T RELIEF AND DRAIN PAN DISCHARGE
SHALL BE ROUTED TO MOP SINK. SEE DETAIL 1/P500.
22.42 EXTEND 3/4"G TO EACH FURNACE.
22.46 3" VTR. UTILIZE EXISTING ROOF PENETRATION.
22.48 PROVIDE WALL CLEANOUT UNDER LAVATORY.
SCALE BP401
2 ENLARGED PLUMBING FLOOR PLAN - WASTE & VENT - COMFORT STATION
SCALE BP401
3 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - ADMIN RESTROOMS
SCALE BP401
4 ENLARGED PLUMBING FLOOR PLAN - WASTE & VENT - ADMIN RESTROOMS
TRUE PLANSCALE BP401
5 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - 115 MECH
SCALE BP401
6 ENLARGED PLUMBING FLOOR PLAN - DOMESTIC & GAS - 106 MECH
40 84
18 G A. G
ALVAN
IZED
D R
AIN
PAN
TO
BE A
M
IN
IM
U
M O
F 4" D
EEP
1-1/4" PAN
D
R
AIN
SEE PLAN
FO
R
ISC
H
AR
G
E LO
C
ATIO
N
HO
T W
ATER O
UT
SUSPEND P
AN F
RO
M
S
TRUCTURE
W
IT
H 1 /2
" T
HREADED R
O D
PRO
VID
E 3 /8
" N O
N-F
ERRO
US S
PACERS
BETW
EEN T
ANK A
ND P
AN
BALL V
ALVE (T
YP)
CO
LD W
ATER IN
1" A
IR
G
AP S
EPARATIO
N B
ETW
EEN T
/P O
UTLET A
ND P
AN
DIE
LECTRIC
U
NIO
NS
P&T R
ELIE
F V
ALVE S
PIL
L IN
TO
P
AN
W
ATER H
EATER
SEE P
LAN F
O R S
IZ
ES
SUPPO
RT T
HE W
ATER H
EATER A
M
IN
UM
UM
O F 1
" A
BO
VE T
HE B
O
TTO
O F T
HE P
AN U
SIN
G
A N
O N-
CO
M
BUSTIB
LE M
ATERIA
L
EXPANSIO
N T
ANK
CHECK V
ALVE (T
YP)
ANTI-S
IP
HO
N V
ACUUM
R
ELIE
F V
ALVE
HW
C R
ETURN
PRESSURE G
AUG
E
UNIO
N (T
YP)
THERM
O M
ETER
CIR
CUIT
S
ETTERY-S
TRAIN
ER
RECIR
CULATIO
N P
UM
P
1/2" TEMPERED WATER TO
FAUCET
1/2" CW SUPPLY W/
STOP VALVE1/2" HW SUPPLY W/
STOP VALVE
WASTE
FINISHED FLOOR
1/2" CW TO FAUCET
1/2" THERMOSTATIC
TEMPERING VALVE SET
AT 110° F
COUNTER
TAILPIECE
COUNTERTOP
FLOOR
SUPPLY STOP
HW HWC CW
CEILING
CIRCUIT SETTER
(0.5 GPM)
THERMOSTATIC
MIXING VALVE
(ASSE 1070)
TOTAL PIPE LENGTH BETWEEN HWC
CROSSOVER AND LAVATORY TO BE A
MAXIMUM OF 2 FEET PER IECC
BRASS CLEANOUT PLUG WITH
COUNTER SUNK HEAD & TRACTOR
GRATE COVER
FINISHED GRADE
16" SQUARE CONCRETE PAD, TROWEL
SMOOTH AND EDGE
1/8 CAST IRON BEND
CAST IRON WASTE LINE
1/8 BEND IF CLEANOUT OCCURS AT END OF LINE
WASTE LINE
STRAINER
BALL VALVE (TYP)
BALANCING VALVE
CHECK VALVE
PRESSURE GAUGE (TYP)
P & T PORT (TYP)
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE FOR FIRST TWO ON EACH
SIDE OF PUMP (SEE NOTE NO. 1)
FLEXIBLE
CONNECTION
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
FLOOR
HW TO FIXTURES
G
1" CW
PUMP
1"
THERMOMETER (TYP)
SEE PLAN FOR SIZE
CIRCUIT SETTER (TYP)
NEW 6" HOUSEKEEPING PAD
EXPANSION TANK
BALL VALVE (TYP)
DIELECTRIC FITTING
CHECK VALVE (TYP)
1/2"
HWC
1-1/4" PAN DRAIN. SEE PLAN FOR
DISCHARGE LOCATION
18 GAUGE GALVANIZED DRAIN PAN. TO BE
A MINIMUM OF 4" DEEP
ROUTE T&P RELIEF TO
DRAIN AND AIRGAP
GAS PIPE, SEE PLAN
FOR SIZE
GAS COCK
6" DIRT LEG
UNION (TYP)
18 G A. G
ALVANIZ
ED D
RAIN
P
AN T
O
B E A
IN
IM
UM
O F 4
" D
EEP
HO
T W
ATER O
UT
PRO
VID
E 3 /8
" N O
N-F
ERRO
US S
PACERS
BETW
EEN T
ANK A
ND P
AN
BALL V
ALVE (T
YP)
CO
LD W
ATER IN
DIE
LECTRIC
U
NIO
NS
P&T R
ELIE
F V
ALVE R
O
UTED T
O H
UB D
RAIN
W
ATER H
EATER
SEE P
LAN F
O R S
IZ
ES
EXPANSIO
N T
ANK
CHECK V
ALVE (T
YP)
ANTI-S
IP
HO
N V
ACUUM
R
ELIE
F V
ALVE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P500
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 113 177
PLUMBING DETAILS
NOT TO SCALEP500
1 JANITOR CLOSET - ELECTRIC WATER HEATER DETAIL
NOT TO SCALEP500
5 LOCAL MIXING VALVE DETAIL
NOT TO SCALEP500
7 LAVATORY HOT WATER RECIRCULATION
NOT TO SCALEP500
4 GRADE CLEANOUT DETAIL
NOT TO SCALEP500
6 HORIZONTAL IN-LINE PUMP DETAIL
NOT TO SCALEP500
3 GAS WATER HEATER DETAIL
NOT TO SCALEP500
2 BREAK ROOM - ELECTRIC WATER HEATER DETAIL
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P600
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 114 177
PLUMBING
SCHEDULES
PLUMBING FIXTURE SCHEDULE / SALIENT CHARACTERISTICS
FIXTURE ACCESSORIES INFO
NOTES
TAG DESCRIPTION
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
MODEL FINISH
BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL FINISH GPM/GPF ELECTRICAL
EWC-1 ABA - ELECTRIC WATER COOLER HI/LO BOTTLE FILLER HAWS 1119.14P STAINLESS STEEL - - - - 120V/1PH 1,2,3,4
EWC-2 ABA - FREEZE RESISTANT HI/LO DRINKING FOUNTAIN
AND BOTTLE FILLER
HAWS 1117P STAINLESS STEEL - - - - 120V/1PH 1,2,3,4
FD-1 FLOOR DRAIN JAY R SMITH 2005Y NICKEL BRONZE - - - - - 5,6,8
FS-1 FLOOR SINK JAY R SMITH 3410-Y WHITE - ACID RESISTANT - - - - - 5,6,7,8
L-1A ABA - WALL MOUNTED LAVATORY AMERICAN STANDARD 0355.012 VITREOUS CHINA - WHITE AMERICAN
STANDARD
1340.227 CHROME 0.5 GPM - 9,10,11,12,13
MS-1 MOP SINK BASIN FIAT MSB2424 WHITE CHICAGO 445-897SRXKCCP CHROME 2.2 GPM - 14
RPBP-1 REDUCED PRESSURE BACKFLOW PREVENTER WATTS 009 BRONZE - - - - - 15
RPBP-2 REDUCED PRESSURE BACKFLOW PREVENTER WATTS 009 BRONZE - - - - - 15
S-1A ABA - SINGLE COMPARTMENT KITCHEN SINK AMERICAN STANDARD 20SB STAINLESS STEEL DELTA 9959-LS-DST CHROME 1.8 GPM - 16,17,18,19
UR-1 FLUSH VALVE URINAL AMERICAN STANDARD 6590.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6063.013.002 CHROME 0.125 GPF - 20,21
WC-1 FLOOR MOUNTED FLUSH VALVE WATER CLOSET AMERICAN STANDARD 2234.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6065.121.002 CHROME 1.28 GPF - 22,23,24
WC-1A ABA - FLOOR MOUNTED FLUSH VALVE WATER CLOSET AMERICAN STANDARD 3043.001 VITREOUS CHINA - WHITE AMERICAN
STANDARD
6065.121.002 CHROME 1.28 GPF - 22,23,24,25
PLUMBING FIXTURE CONNECTION SCHEDULE
GENERAL
NOTESTAG CW
[IN.]
HW
[IN.]
HWC
[IN.]
WASTE
[IN.]
VENT
[IN.]
EWC-1 1/2" - - 2" 1-1/2" -
EWC-2 1/2" - - 2" 1-1/2" -
FD-1 - - - SEE DWGS SEE DWGS -
FS-1 - - - SEE DWGS SEE DWGS -
L-1A 1/2" 1/2" 1/2" 1-1/2" 1-1/4" 1
MS-1 3/4" 3/4" 1/2" 3" 2" -
RPBP-1 2" - - - - -
RPBP-2 1-1/2" - - - - -
S-1A 1/2" 1/2" 1/2" 1-1/2" 1-1/4" -
UR-1 3/4" - - 2" 2" -
WC-1 1" - - 4" 2" -
WC-1A 1" - - 4" 2" -
GAS/ELECTRIC WATER HEATER SCHEDULE / SALIENT CHARACTERISTICS
GENERAL HEATING PHYSICAL ELECTRICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
INPUT @ SEA LEVEL
[BTU/H]
POWER
[kW]
RECOVERY
AT 90°F RISE
CAPACITY
[GAL]
HEIGHT
[IN]
DIAMETER
[IN.]
WEIGHT
[LB]
VOLTAGE
[V]
PHASE
EWH-1 AO SMITH DEL-20 - 2.5 11 20 22.25 21.75 73 240 1 1-2
EWH-2 AO SMITH DEL-10 - 2.5 11 10 18.25 18 54 240 1 1-2
GWH-1 AO SMITH BTX-80 76,000 - 95 50 71 27 225 120 1 3-6
PUMP SCHEDULE / SALIENT CHARACTERISTICS
GENERAL PERFORMANCE ELECTRICAL
NOTESTAG BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL
SYSTEM FLOW
[GPM]
HEAD
[FT]
POWER
[W]
RP-1 BELL & GOSSETT ECOCIRC+ 20-18 HOT WATER
CIRCULATION
1.5 15 70 1-2
RP-2 BELL & GOSSETT ECOCIRC+ 20-18 HOT WATER
CIRCULATION
3.5 15 70 1-2
NOTES
LAVATORIES
1. CONNECT HOT WATER RECIRCULATION TO HOT WATER LINE PER
2024 IECC TABLE C404.5.1.
NOTES
ELECTRIC WATER HEATER
1. PROVIDE WITH MAGNESIUM ANODE ROD
2. PROVIDE WITH EXPANSION TANK (PET-1)
GAS WATER HEATER
3. 3.5-14" W.C. GAS
4. PROVIDE WITH ACID NEUTRALIZATION KIT
5. 4" PVC INTAKE AND 4" VENT PER MANUFACTURER' RECOMMENDATIONS
6. PROVIDE WITH EXPANSION TANK (PET-1)
NOTES
DRINKING FOUNTAINS AND ELECTRIC WATER COOLERS
1. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
2. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
3. VANDAL PROOF.
4. PROVIDE WITH CANE DETECTION APRON TO BOTTOM OF HIGH FOUNTAIN.
FLOOR DRAINS AND SINKS
5. PROVIDE WITH TRAP GUARD.
6. MOUNT FLUSH WITH FLOOR.
7. 1/2 GRATE, DOME STRAINER.
8. BODY/CONNECTION MATERIAL TO MATCH WASTE PIPING.
LAVATORIES
9. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
10. PROVIDE MIXING VALVE UNDER FIXTURE. ASSE 1070 RATED.
• MANUFACTURER/MODEL BASIS OF DESIGN: LEONARD #270-LF
11. PROVIDE WITH P-TRAP AND SUPPLIES INSULATION KIT.
• MANUFACTURER/MODEL BASIS OF DESIGN: TRUEBRO #103 E-Z
12. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
13. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT.
MOP SERVICE BASIN
14. PROVIDE WITH HOSE AND HOSE BRACKET, MOP HANGER, SS WALL GUARD.
REDUCED PRESSURE BACKFLOW PREVENTER
15. PROVIDE WITH STRAINER.
NOTES
SINKS
16. 17 GA. P-TRAP, LOOSE KEY ANGLE STOPS, STAINLESS STEEL BRAIDED SUPPLIES.
17. PROVIDE MIXING VALVE UNDER FIXTURE. ASSE 1070 RATED.
• MANUFACTURER/MODEL BASIS OF DESIGN: LEONARD #270-LF
18. PROVIDE WITH P-TRAP AND SUPPLIES INSULATION KIT.
• MANUFACTURER/MODEL BASIS OF DESIGN: TRUEBRO #103 E-Z
19. 6" DEEP BOWL, REAR DRAIN LOCATION.
URINALS
20. PROVIDE WITH CONCEALED FLOOR MOUNTED CARRIER (COORDINATE WITH WALL THICKNESS).
21. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT.
WATER CLOSETS
22. LOOSE KEY ANGLE STOP, STAINLESS STEEL BRAIDED SUPPLIES.
23. FLUSHOMETER WATER CLOSET.
24. FLOOR MOUNTED WATER CLOSET WITH BOTTOM OUTLET.
25. PROVIDE FLUSH VALVE HANDLE ON OPEN SIDE OF FIXTURE AWAY FROM WALL FOR ABAAS
ACCESS.
NOTES
RECIRCULATION PUMP
1. LEAD FREE BRONZE
2. PROVIDE WITH AQUASTAT AND TIMECLOCK TO RUN DURING OCCUPIED HOURS
PLUMBING MISCELLANEOUS SCHEDULE / SALIENT CHARACTERISTICS
GENERAL
NOTES
TAG DESCRIPTION MANUFACTURER MODEL
PET-1 PLUMBING EXPANSION TANK ARMSTRONG AST-12 1
PRV-1 PRESSURE REDUCING VALVE WATTS LF25AUB-Z3 2
PRV-2 PRESSURE REDUCING VALVE WATTS LF25AUB-Z3 3
NOTES
PLUMBING EXPANSION TANKS
1. 3.3 GALLONS ACCEPTANCE VOLUME
PRESSURE REDUCING VALVES
2. 1-1/2" CONNECTION SIZE
3. 2" CONNECTION SIZE
GENERAL NOTE:
BASIS OF DESIGN PRODUCTS LISTED IN THE
SCHEDULES ESTABLISH THE QUALITIES AND
CHARACTERISTICS FOR THE EVALUATION OF
PRODUCT SUBSTITUTIONS BY THE CONTRACTING
OFFICER. QUALITIES AND CHARACTERISTICS ARE
LISTED FOR THE BASIS OF DESIGN PRODUCT IN THE
SCHEDULES AND/OR THE PROJECT SPECIFICATIONS.
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P800
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 115 177
PLUMBING CALCS AND
COMCHECK
COMFORT STATION
SANITARY DRAINAGE FIXTURE UNIT CALCULATION
(CALCULATIONS BASED ON IPC TABLE 709.1)
FIXTURE
WATER CLOSET, FLUSH VALVE
URINAL, FLUSH VALVE
LAVATORY
MOP SERVICE BASIN
DRINKING FOUNTAIN
FLOOR DRAIN
TOTAL
EXISTING 4" WASTE MAIN CAN ACCEPT A 180 DFU CAPACITY AT 1/8" PER FOOT SLOPE
NUMBER OF
INSTANCES
DFU UNITS
TOTAL LOAD
1.5
61.5
VISITOR CENTER + ADMIN WING
SANITARY DRAINAGE FIXTURE UNIT CALCULATION
(CALCULATIONS BASED ON IPC TABLE 709.1)
FIXTURE
WATER CLOSET, FLUSH VALVE
LAVATORY
SINK
MOP SERVICE BASIN
FLOOR DRAIN
TOTAL
EXISTING 4" WASTE MAIN CAN ACCEPT A 180 DFU CAPACITY AT 1/8" PER FOOT SLOPE
NUMBER OF
INSTANCES
DFU UNITS
TOTAL LOAD
COMFORT STATION
WATER SUPPLY FIXTURE UNIT CALCULATION (CALCULATIONS BASED ON IPC TABLE E103.3(2))
FIXTURE
WATER CLOSET (VALVE)
URINAL
LAVATORY
MOP SINK BASIN
DRINKING FOUNTAIN
HOSE BIB
TOTAL
117 WSFU TOTAL -> 72 GPM. THE NEW SERVICE IS 2" AND CAN HANDLE A MAXIMUM FLOW RATE OF 85 GPM.
NUMBER OF
INSTANCES
COLD (WSFU)
1.5
0.25
HOT (WSFU)
1.5
TOTAL LOAD (WSFU)
0.25
TOTAL LOAD (WSFU)
0.75
VISITOR CENTER + ADMIN WING
WATER SUPPLY FIXTURE UNIT CALCULATION (CALCULATIONS BASED ON IPC TABLE E103.3(2))
FIXTURE
WATER CLOSET (VALVE)
LAVATORY
KITCHEN SINK
MOP SINK BASIN
HOSE BIB
TOTAL
47 WSFU TOTAL -> 49 GPM. THE EXISTING SERVICE IS 1-1/2" AND CAN HANDLE A MAXIMUM FLOW RATE OF 50 GPM.
NUMBER OF
INSTANCES
COLD (WSFU)
1.5
HOT (WSFU)
1.5
TOTAL LOAD (WSFU)
TOTAL LOAD (WSFU)
GAS CALCULATIONS (LINE SIZING PER IFGC TABLE 402.4(2))
NEW GAS LINE CONNECTED LOAD
EQUIPMENT
(N) GWH-1
(N) GF-1
(N) GF-2
(N) GF-3
(N) GF-4
(N) GF-5
(N) GF-6
TOTAL LOAD (MBH)
TOTAL LOAD (CFH)
TOTAL EQUIVALENT LENGTH (FT)
SYSTEM DESIGN PRESSURE (PSI)
SYSTEM DESIGN PRESSURE DROP (IN. W.C.)
820 CFH WITH THE ABOVE DESIGN VARIABLES EQUALS A 2" GAS MAIN.
INPUT EACH AT SEA LEVEL (MBH)
INPUT EACH AT ALT (CFH)
LESS THAN 2
0.5
L-1A
L-1A L-1A
L-1A
L-1A
L-1A
1 1/4"ø W
2"ø W
1 1/4"ø W
1 1/4"ø W
2"ø W
1 1/2"ø V (E)
4"ø W (E)
2"ø W (E)
4"ø W
4"ø W
FS-1
MS-1
4"ø W
UR-1
UR-1
UR-1
WC-1
WC-1A
WC-1A
WC-1
WC-1
WC-1
WC-1
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
2"ø V
1 1/4"ø W 1 1/4"ø W
1 1/4"ø W
2"ø W
4"ø W
RE: P121 FOR CONTINUATION OF EXISTING.
3" VENT THRU WALL
WITH ELBOW IN
SOFFIT
EWC-2
FD-1
FD-1
FD-1
FD-1
FCO
(E)GCO
COMBO WASTE/VENT
2"ø V
2"ø W
1 1/4"ø V
2"ø V
WC-1A
WC-1A
L-1A
L-1AFD-1
FD-1
4"ø W (E)
2"ø W
3"ø V (E)
2"ø V (E)
3"ø W (E)
4"ø W (E)
3" VTR. TRANSITION FROM 2"V TO
3"V 18" BELOW ROOF PENETRATION.
MS-1
2"ø V
2"ø V
2"ø V
2"ø V
SEE P121 FOR
CONTINUATION
(E) FCO
EWC-1
2"ø W
1 1/2"ø V
RE: P121 FOR CONTINUATION
RE: P121 FOR CONTINUATION
KS-1A
2"ø W
1 1/2"ø V
EWH-2
2"ø W (E)
1 1/2"ø V (E)
RE: P121 FOR
CONTINUATION
RE: P121 FOR
CONTINUATION
HUB DRAIN FOR
WATER HEATER
T&P RELIEF
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
360 ENGINEERING,
INC.
GOLDEN, CO
1/ 7/
:3
7:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
R O
M O
K V
C M ec h-
P lu m b.
rv t
P900
JEG/MM
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
JEG/MM
SJR/DMD
01/16/2026 116 177
PLUMBING WASTE
AND VENT
ISOMETRICS
NOT TO SCALEP900
1 WASTE & VENT ISO - COMFORT STATION
NOT TO SCALEP900
2 WASTE & VENT ISO - ADMIN RESTROOMS
NOT TO SCALEP900
3 WASTE & VENT ISO - EXHIBIT ELECTRIC WATER COOLER
NOT TO SCALEP900
4 WASTE & VENT ISO - BREAK ROOM SINK
ELECTRICAL DEMOLITION REQUIREMENTS
THE BASIS OF THESE DRAWINGS WERE SITE OBSERVATIONS, ORIGINAL BUILDING DRAWINGS AND
VARIOUS OTHER SOURCES. EVERY ATTEMPT HAS BEEN MADE TO DOCUMENT THE ACTUAL
CONDITIONS. HOWEVER, THE CONTRACTOR SHALL CAREFULLY EXAMINE THE CONTRACT
DOCUMENTS AND THOROUGHLY BECOME FAMILIAR WITH THE BUILDING/NPS STANDARDS RELATING TO THE WORK. FAILURE TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF THE OBLIGATIONS OF
THE CONTRACT.
THE ELECTRICAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER OF ANY MATERIALS OR APPARATUS BELIEVED TO BE INADEQUATE, UNSUITABLE, IN VIOLATION OF LAWS, ORDINANCES, RULES
OR REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN THEIR COST THE REMOVAL OF ALL EXISTING
ELECTRICAL DEVICES, CONDUITS, FIXTURES AND EQUIPMENT. DISCARD ALL EQUIPMENT AS
REQUIRED, UNLESS NOTED OTHERWISE.
EXISTING DEVICES NOT NOTED AS EXISTING (E) OR INDICATED ON PLANS SHALL REMAIN, AS THEY PRESENTLY EXIST. FOR DEMOLISHED DEVICES IN WALLS WHICH ARE TO REMAIN, THE ELECTRICAL CONTRACTOR SHALL INSTALL A BLANK FACE PLATE ON THE BACKBOX. FOR DEMOLISHED DEVICES INSTALLED IN THE FLOOR, THE ELECTRICAL CONTRACTOR SHALL CUT THE FLOOR BOX FLUSH WITH
THE FLOOR AND FILL WITH CONCRETE; COORDINATE WITH THE CONTRACTING OFFICER.
THE DEMOLITION OF SOME DEVICES MAY INTERRUPT POWER TO DEVICES DOWN STREAM. THE
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REWORKING THESE CIRCUITS TO MAINTAIN POWER
TO THE DOWN STREAM DEVICES WHICH WILL REMAIN.
ALL UNENERGIZED/DEMOLISHED CIRCUITRY SHALL HAVE THE CONDUCTORS REMOVED FROM THE
CONDUIT AND THE CONDUIT SHALL BE MARKED "EMPTY" WITH INDELIBLE MARKER.
HISTORIC MATERICAL CONSIDERATIONS
WOOD SLAT CEILING IN EXHIBIT HALL AREA IS A HISTORIC FABRIC AND SHALL NOT BE
CUT/DRILLED/PENETRATED UNDER ANY CIRCUMSTANCES WITHOUT SPECIFIC APPROVAL AND COORDINATION WITH THE CONTRACTING OFFICER. EVERY EFFORT HAS BEEN MADE TO ENSURE THAT SPECIFIC LOCATIONS REQUIRING NEW OPENINGS ARE IDENTIFIED SPECIFICALLY. PHASING OF INSTALLATION OF EQUIPMENT SHALL BE COORDINATED WITH RE-INSTALLATION OF THE HISTORIC MATERIALS TO AVOID UNNECESSARY OPENINGS
OR DAMAGE ASSOCIATED WITH THE CONSTRUCTABILITY OF THE SCOPE OF WORK.
ELECTRICAL GENERAL NOTES
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
E000
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 117 177
ELECTRICAL COVER
SHEET
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL NECESSARY FOR A
COMPLETE AND FUNCTIONING ELECTRICAL SYSTEM.
2. MATERIALS AND INSTALLATION SHALL COMPLY WITH CODES, LAWS AND ORDINANCES OF
FEDERAL, STATE AND LOCAL GOVERNING BODIES HAVING JURISDICTION. CODES FOR THIS
SCOPE OF WORK INCLUDE THE 2024 IBC AND IEBC, 2024 IECC, 2023 NEC, 2024 IFC, AND 2016
ASHRAE 90.1.
3. MATERIALS AND EQUIPMENT SHALL BE LISTED AND/OR LABELED BY U.L., ETL, CSA OR
ANOTHER RECOGNIZED TESTING LAB.
4. ALL WORK REQUIRED FOR THE INSTALLATION AS SHOWN ON DRAWINGS INCLUDING
LABOR, EQUIPMENT AND MATERIALS SHALL BE IN STRICT COMPLIANCE WITH THE BUILDING
STANDARDS, EXCEPT AS NOTED OTHERWISE.
5. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, GOVERNMENTAL FEES,
TAXES AND LICENSES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF
THE ELECTRICAL WORK.
6. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO GOVERNMENTAL AGENCIES AND
UTILITY COMPANIES SHOP DRAWINGS, WHICH ARE REQUIRED BY THESE AGENCIES, FOR
THEIR APPROVAL.
7. FOR ALL JOBS THAT INCLUDE DEMOLITION WORK BY THE ELECTRICAL CONTRACTOR,
DURING AND AFTER DEMOLITION, EC SHALL MAINTAIN CIRCUIT CONTINUITY TO ALL
EXISTING DEVICES THAT ARE TO REMAIN. EC SHALL REMOVE, RELOCATE, AND/OR
REWORK ANY CONDUIT AND WIRING TO FACILITATE THE NEW CONSTRUCTION SCOPE OF
WORK. FOR ALL LUMINAIRES THAT ARE EXISTING TO REMAIN OR EXISTING TO BE
RELOCATED, EC SHALL CLEAN LENSES AND REPLACE ALL EXTINGUISHED LAMPS, UON.
8. ALL MATERIALS, AND EQUIPMENT SHALL BE ERECTED, INSTALLED, CONNECTED, CLEANED,
ADJUSTED, TESTED, CONDITIONED, AND PLACED IN SERVICE IN ACCORDANCE WITH THE
MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS.
9. ALL CUTTING, DRILLING AND PATCHING OF MASONRY, STEEL OR IRON WORK BELONGING
TO THE BUILDING MUST BE DONE BY THIS CONTRACTOR IN ORDER THAT HIS WORK MAY BE
PROPERLY INSTALLED, BUT UNDER NO CONDITIONS MAY STRUCTURAL MEMBERS BE CUT,
EXCEPT AT THE DIRECTION OF THE CONTRACTING OFFICER.
10. ALL MATERIAL, EQUIPMENT, WIRING DEVICES, ETC. SHALL BE NEW, UNLESS SPECIFICALLY
INDICATED AS EXISTING TO BE REUSED.
11. THE CONTRACTOR SHALL PROVIDE NEW TYPE WRITTEN PANEL DIRECTORIES FOR ALL NEW
PANELS. PANELBOARD SHALL BE MARKED WHERE THE SOURCE OF POWER SUPPLY
ORIGINATES.
12. DO NOT SHARE NEUTRAL CONDUCTORS FOR MULTIWIRE BRANCH CIRCUITS. WHERE THE
E.C. PROPOSES THE USE OF SHARED NEUTRAL CONDUCTORS OR SHARED NEUTRAL
CONDUCTORS ARE REQUIRED (SUCH AS POWERED FURNITURE SYSTEMS), HANDLE TIES
SHALL BE PROVIDED ON THE CIRCUIT BREAKERS, WITH SHARED NEUTRALS, SUCH THAT IT
WILL SIMULTANEOUSLY DISCONNECT ALL UNGROUNDED CONDUCTORS. ALL HANDLE TIES
ARE REQUIRED TO BE INDICATED ON THE PANELBOARD SHOP DRAWINGS.
13. SHOULD ACTUAL FIELD CONDITIONS REQUIRE INDICATED CIRCUIT DESIGNATIONS TO VARY, INDICATE THE CIRCUIT NUMBER USED ON THE "AS-BUILT" DRAWINGS.
14. ALL SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD BY THE ELECTRICAL
CONTRACTOR WITH THE MAXIMUM AVAILABLE FAULT CURRENT AS INDICATED WITHIN
THESE DOCUMENTS. THE FIELD MARKING(S) SHALL COMPLY WITH ELECTRICAL
SPECIFICATIONS FOR READABILITY AND DURABILITY.
15. ALL NEW CIRCUITS SHALL HAVE A GROUND WIRE INSTALLED.
16. PER NPS REQUIREMENTS, ALL WIRING MUST BE INSTALLED IN CONDUIT (MINIMUM SIZE 3/4"
UON).
17. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL SPECIAL OUTLET BOXES THAT MAY BE
REQUIRED TO ENCLOSE RECEPTACLES.
18. IN EXPOSED AND SUSPENDED CEILING APPLICATIONS, ROUTE CONDUIT AS CLOSE TO
STRUCTURAL DECK AS POSSIBLE, AND SUPPORT CONDUIT AND JUNCTION BOXES
DIRECTLY FROM THE STRUCTURAL DECK, OR FRAMING PROVIDED FOR THAT PURPOSE.
BRANCH CIRCUIT CONDUITS SHALL NOT BE CLIPPED TO THE CEILING SYSTEM, UNLESS IT
HAS BEEN SPECIFICALLY DESIGNED FOR THAT PURPOSE.
19. ALL EXPOSED CONDUIT SHALL BE CONCEALED TO THE GREATEST EXTENT POSSIBLE, AND
SHALL BE INSTALLED PARALLEL AND CLOSE TO STRUCTURAL MEMBERS. GENERAL
CONTRACTOR SHALL PAINT CONDUIT TO MATCH ADJACENT FINISHES.
20. PROVIDE LUMINAIRES SHOWN AS SHADED WITH EMERGENCY BATTERY BACKUP.
EMERGENCY LUMINAIRES SHALL SENSE UNSWITCHED POWER TO THE SPACE AND
OPERATED AUTOMATICALLY UPON LOSS OF NORMAL POWER. ALL EMERGENCY
LUMINAIRES SHALL HAVE INTEGRAL TEST SWITCHES AND VISIBLE INDICATING LIGHTS.
CONNECT THE EMERGENCY BATTERY BACKUP TO THE UN-SWITCHED LEG OF THE
LIGHTING CIRCUIT INDICATED.
21. UNLESS OTHERWISE NOTED, LUMINAIRES DESIGNATED AS NIGHT LIGHT (NL) SHALL BE
CONNECTED AHEAD OF LOCAL SWITCHING AND REMAIN ON 24 HOURS A DAY.
22. ALL DIMMED LIGHTING CIRCUITS ARE TO RECEIVE DEDICATED NEUTRALS. DO NOT SHARE
NEUTRALS ON DIMMED LIGHTING CIRCUITS.
23. PROVIDE CONTRACTING OFFICER WITH A COMPLETE LISTING OF ALL LAMPS UTILIZED ON
THE PROJECT INCLUDING MANUFACTURER AND CATALOG INFORMATION. PROVIDE A
SUGGESTED SOURCE, INCLUDING CONTACT NAME AND PHONE NUMBER, FOR
REORDERING.
24. THE CONTRACTOR SHALL VERIFY THE CEILING TYPE BEFORE ORDERING LIGHTING
FIXTURES.
25. ROUGH-IN FOR MECHANICAL EQUIPMENT SHALL ONLY OCCUR AFTER MECHANICAL
EQUIPMENT SUBMITTALS ARE THOROUGHLY REVIEWED FOR CHANGES. NOTIFY
CONTRACTING OFFICER OF ANY DISCREPANCIES.
26. THE POWER AND CONTROL REQUIREMENTS FOR ALL EQUIPMENT CONNECTIONS SHALL BE
CONFIRMED WITH APPROVED SHOP DRAWINGS PRIOR TO ELECTRICAL ROUGH-IN. FINAL
POWER REQUIREMENTS, DIMENSIONED ROUGH-IN LOCATIONS, LOW VOLTAGE SYSTEM
CONNECTIONS, ETC. SHALL BE CONFIRMED AND MODIFIED AS REQUIRED.
27. ALL EXISTING ELECTRICAL SERVICES NOT SPECIFICALLY INDICATED TO BE REMOVED OR
ALTERED SHALL REMAIN AS THEY PRESENTLY EXIST.
28. G.C. SHALL INCLUDE IN HIS COST THE REMOVAL OF ALL EXISTING ELECTRICAL DEVICES, CONDUITS, FIXTURES AND EQUIPMENT. TURN EQUIPMENT OVER TO CONTRACTING
OFFICER AS INDICATED OR RECYCLE/DISCARD ALL EQUIPMENT AS REQUIRED. E.C. SHALL
BE RESPONSIBLE FOR DISCONNECTING PRIMARY SERVICE AND TEMPORARY POWER.
29. ALL CIRCUIT BREAKERS IN NEW ELECTRICAL PANELS TO BE BOLT ON TYPE WITH TRIP
INDICATOR.
LIGHTNING PROTECTION SYSTEM NOTES
ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A LIGHTNING PROTECTION
SYSTEM WITH AN UNDERWRITER'S LABORATORIES LISTED MASTER C LABEL. REFER
TO PERFORMACE SPECIFICATION SECTION 26 4113 FOR SYSTEM REQUIREMENTS.
COORDINATE ALL AIR TERMINAL LOCATIONS ON ROOF WITH CONTRACTING OFFICER
WHILE DEVELOPING SUBMITTALS. COORDINATE ALL DOWN CONDUCTOR LOCATIONS
WITH CONTRACTING OFFICER AND MANUFACTURER DURING SUBMITTALS.
SUBMITTALS REQUIRE FULL ROOF PLANS WITH ALL AIR TERMINALS (AND ALL OTHER
EQUIPMENT) TO BE INDICATED FOR REVIEW PRIOR TO SUBMITTAL APPROVAL.
SYSTEM SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER.
CONDUCTORS SHALL BE CONCEALED FROM VIEW TO THE GREATEST EXTENT
POSSIBLE, WHERE VISIBLE, PROVIDE STRAIGHT RUNS, MINIMIZE LOOSE TURNS, AND
PROVIDE SUPPORTS AT NO MORE THAN 3' INTERVALS. MAINTAIN A MINIMUM OF 8"
BEND RADIUS ON ALL TURNS TO COMPLY WITH NFPA REQUIREMENTS.
01/08/2026
MDC
T
DISTRIBUTION AND RACEWAY
LIGHTING FIXTURES
ABBREVIATIONS AND SYMBOLS
x x x x x
A AMPERE(S)
AC ABOVE COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERES INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
BFF BELOW FINISHED FLOOR
C CONDUIT
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CT CURRENT TRANSFORMER
DISC DISCONNECT
DW DISHWASHER
DWG(S) DRAWING(S)
(E) EXISTING TO REMAIN
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
(ER) EXISTING TO BE RELOCATED
EM EMERGENCY
EPO EMERGENCY POWER OFF
EWC ELECTRIC WATER COOLER
(R) EXISTING TO BE REMOVED
F FUSE
FLA FULL LOAD AMPS
GD GARBAGE DISPOSAL
G GROUND
GC GENERAL CONTRACTOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
HP HORSEPOWER
IDF INTERMEDIATE DISTRIBUTION FACILITY
IG ISOLATED GROUND
ISC SHORT CIRCUIT CURRENT
KVA KILOVOLT AMPERE(S)
KW KILOWATT(S)
LTG LIGHTING
MCA MINIMUM CIRCUIT AMPERE(S)
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION CENTER
MDF MAIN DISTRIBUTION FACILITY
MLO MAIN LUGS ONLY
MTS MANUAL TRANSFER SWITCH
MW MICROWAVE
NC NORMALLY CLOSED
NL NIGHT LIGHT - SEE GENERAL NOTES
NO NORMALLY OPEN
OAE OR APPROVED EQUAL
OH OVERHEAD
P POLE
PART PARTIAL CIRCUIT
PH PHASE
PNL PANEL
RCPT RECEPTACLE
REF REFRIGERATOR
(RL) RELOCATED LOCATION
SPD SURGE PROTECTION DEVICE
UC UNDER COUNTER/CABINET
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
V VOLT(S)
W WATT(S) OR WIRE
WG WIRE GUARD
WP WEATHERPROOF
XFMR TRANSFORMER
MECHANICAL EQUIPMENT
SCHEDULE NOTATION
DETAIL NOTE
DELTA REVISION NOTE
ELECTRICAL WIRE SIZE
MAIN DISTRIBUTION CENTER (MDC)
SURFACE MTD PANELBOARD
RECESSED PANELBOARD
TRANSFORMER
BRANCH CIRCUIT HOMERUN
CONDUIT CONCEALED IN FLOOR OR
CONDUIT EXPOSED OR CONCEALED
IN WALL OR CEILING
RACEWAY UP
RACEWAY DOWN
CAPPED CONDUIT
CURRENT TRANSFORMER
CIRCUIT BREAKER SWITCH
FUSED SWITCH
GROUNDING ELECTRODE CONDUCTOR
METER
LUMINAIRE TYPE, REFERENCING
LUMINAIRE SCHEDULE TYPICAL ALL
FIXTURES. SUBSCRIPT, IF SHOWN,
REFERENCES WALL SWITCH OR
RELAY/ZONE CONTROL
WALL MOUNTED LUMINAIRE
SURFACE OR PENDANT MOUNTED
LUMINAIRE
RECESSED LUMINAIRE
RECESSED DOWNLIGHT LUMINAIRE
SURFACE CEILING LUMINAIRE
PENDANT LUMINAIRE
ARROW INDICATES DIRECTIONAL
LUMINAIRE
SURFACE OR PENDANT TRACK
LUMINAIRE
GFP GROUND FAULT PROTECTION
GFP GROUND FAULT PROTECTION
TS SPRINKLER TAMPER SWITCH
FS SPRINKLER FLOW SWITCH
A1 a
MONOPOINT LUMINAIRE
EXIT LUMINAIRE - SHADED
INDICATES FACE / DIRECTIONAL
ARROWS AS SHOWN
BATTERY PACK EMERGENCY
LUMINAIRE
HATCH INDICATES EMERGENCY
LUMINAIRE
EXTERIOR AREA LIGHT
S
K
D
TO
TC
PC
HP
J
WIRING DEVICES
J
J
SR
DUPLEX RECEPTACLE
FOUR PLEX RECEPTACLE
SINGLE RECEPTACLE
COMBO RECEPTACLE/SWITCH
SWITCHED DUPLEX RECEPTACLE
SPECIAL PURPOSE RECEPTACLE
FLOOR MOUNTED SPECIAL PURPOSE
RECEPTACLE
FLOOR MOUNTED RECEPTACLE
DUPLEX/QUAD
SURFACE RACEWAY
JUNCTION BOX
WALL MOUNTED J-BOX
FLOOR MOUNTED JUNCTION BOX
MOLDED CASE CIRCUIT BREAKER IN
ENCLOSURE
NON-FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
MAGNETIC CONTROLLER (STARTER)
MOTOR
TIME CLOCK
PHOTOCELL
THERMAL OVERLOAD SWITCH
SINGLE POLE SWITCH, LINE VOLTAGE
3-WAY SWITCH, LINE VOLTAGE
4-WAY SWITCH, LINE VOLTAGE
KEY OPERATED SWITCH
DIMMER SWITCH, LINE VOLTAGE
S
S
S
S
S
S x LIGHTING CONTROL DEVICE, REFER
TO DETAILS FOR CONTROL INTENT
EMERGENCY POWERED
DUPLEX RECEPTACLE
CEILING MOUNTED RECEPTACLE
DUPLEX/QUAD
CLGCLG
UNDERGROUND
(EL) EXISTING LOCATION TO BE REUSED
LIGHTNING PROTECTION SYSTEM
LIGHTNING PROTECTION CABLE
AIR TERMINAL (RE: #1,2,4/E405)
GROUND TERMINAL (RE: #3,5,6/E405)
BONDING CONNECTION
ZONE OF PROTECTION FROM OTHER
AIR TEMINALS
THRU ROOF PENETRATION
1. WHERE MULTIPLE LINE VOLTAGE DEVICES ARE SHOWN ADJACENT TO
EACH OTHER, THEY ARE ALL TO SHARE THE SAME JUNCTION BOX, UP TO
FOUR GANGS.
2. WHERE MORE THAN FOUR DEVICES ARE SHOWN ADJACENT TO EACH
OTHER, DEVICES ARE TO STACK VERTICALLY ABOVE ONE ANOTHER IN
TWO ROWS IN AS SMALL OF GANG BOXES AS POSSIBLE. I.E. SIX DEVICES
WILL USE TWO THREE GANG BOXES, FIVE DEVICES WILL USE ONE THREE
GANG AND ONE TWO GANG BOX.
3. SEPARATELY GANGED DEVICES ARE NOT ALLOWED TO BE INSTALLED
ADJACENT TO ONE ANOTHER HORIZONTALLY WITHIN THE SAME STUD
BAY.
4. ALL ELECTRICAL BOXES INSTALLED IN A WALL OR CEILING WITH A
MINIMUM 1-HOUR FIRE-RESISTANCE RATING SHALL BE WRAPPED WITH AN
INTUMESCENT MOLDABLE FIRESTOP PUTTY PAD DESIGNED TO HELP
PROTECT ELECTRICAL OUTLET BOXES. INSTALL PER MANUFACTURERS
LITERATURE.
5. ALL ELECTRICAL BOXES INSTALLED ON OPPOSITE SIDES OF A COMMON
WALL, LESS THAN 24" HORIZONTAL SPACING, SHALL BE INSTALLED WITH A
LAYER OF EXPANDABLE SPRAY FOAM INSULATION AROUND EACH
ELECTRICAL BOX.
6. ALL ELECTRICAL BOXES/DEVICES SHALL BE INSTALLED TO MEET ABA
MOUNTING HEIGHT REQUIREMENTS.
NOTES:
S
V
M
6'-0"
TO CENTER
(SEE NOTE 6)
1'-6"
3'-8"
TOP OF CABINET
TO CENTER
TO BOTTOM
5'-0"
TO CENTER
AC AC AC AC
POWER PANEL
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
E001
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 118 177
ELECTRICAL LEGENDS
E001
DEVICE MOUNTING HEIGHT1
BENCH(TYP.)
TRAIL
TRAIL
TRA
IL
J
ET1
ET1
ET1
(E) EA1
ez01
(E) EA1
ez01
(E) EA1
ez01
L2A-24,26
(E) UTILITY XFMR
(E) UTILITY
METER
(E) 'MDS'
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
E002
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 119 177
ELECTRICAL SITE
PLAN
E002
ELECTRICAL SITE PLAN1
KEYNOTE LEGEND
KEY
VALUE KEYNOTE TEXT
1 EXISTING HISTORIC SITE LIGHTING POLES SHALL BE RE-LAMPED
AND GLASS GLOBE SHALL BE CLEANED BEFORE RE-INSTALLATION.
FIXTURE COMPONENTS SHALL BE HANDLED WITH THE UTMOST
CARE SUCH THAT REMAINING MATERIALS ARE NOT FURTHER
IMPACTED OR DAMAGED DUE TO THE SCOPE OF THE WORK FOR
REHABILITATION INDICATED. SEE FIXTURE SCHEDULE ON SHEET
E402 FOR MORE INFORMATION. EC SHALL LOCATE REMOTE
LIGHTING CONTROLLER UPSTREAM OF THE CIRCUIT, NEAR THE
PANEL. EXISTING WIRING SHALL BE REUSED, AND SPLICES MADE
AS NECESSARY TO INTEGRATE THE LIGHTING CONTROLLER.
PROVIDE DETAILED PHOTO DOCUMENTATION OF HISTORIC
FIXTURE PRIOR TO WORK COMMENCE TO CONTRACTING OFFICER
FOR RECORD.
2 ABAAS COMPLIANT DUAL-PORT ELECTRIC VEHICLE SUPPLY
EQUIPMENT (EVSE) INSTALLED SPACE. EC SHALL PROVIDE
TRIANGULAR PEDESTAL/BOLLARD MOUNTED DUAL PORT, LEVEL 2,
7.7KW ELECTRIC VEHICLE CHARGING STATION. BASIS OF DESIGN
SHALL BE BLINK CHARGING IQ 200 SERIES (OR APPROVED EQUAL),
PROVIDE (1) DEDICATED 40-AMP, 240V, 1-PHASE ELECTRICAL
CONNECTION (2#6, 1#8G, 1-1/4"C) AND (1) 1-1/4"C FOR FUTURE
SECOND CONNECTION, ROUTED FROM PANEL INDICATED TO
STUB-UP LOCATION AT NEW DUAL PORT CHARGING STATION. EC
SHALL COORDINATE EXACT PEDESTAL LOCATION BETWEEN (2)
ADJACENT PARKING STALLS WITH CONTRACTING OFFICER IN FIELD
PRIOR TO INSTALLATION. CONTRACTING OFFICER SHALL VERIFY
EQUIPMENT LOCATION AND SET-BACK DISTANCE FROM CURB WITH
PARKING STALL CLEARANCE AS REQUIRED TO AVOID POTENTIAL
DAMAGE FROM VEHICULAR IMPACT. CIRCUIT AS INDICATED. EC
SHALL COORDINATE EXACT INSTALLATION REQUIREMENTS WITH
MANUFACTURER'S INSTALLATION INSTRUCTIONS PRIOR TO
COMMENCING WORK.
3 EC SHALL ROUTE CONDUIT ALONG EXTERIOR OF THE BUILDING, UP
FROM GRADE ON EXTERIOR, AND SURFACE MOUNTED TO ENTER
BUILDING INTO STORAGE 104 FOR FEED INTO PANEL 'L2A'. CONDUIT
SHALL BE PAINTED TO MATCH EXTERIOR.
SCALE A
400 8040
SCALE OF FEET
TRUE PLAN
L
K
2 3 4 5 76
M
8 9 10 11 12 13 14 15 16 17
H
G
F
E
D
C
B
ED101
ED102
ED103
VISITOR
CENTER
COMFORT
STATION
ADMIN
WING
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
ED100
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 120 177
ELECTRICAL OVERALL
DEMOLITION PLAN
80 168
SCALE OF FEET
ED100
OVERALL DEMOLITION PLAN1
SCALE A
F
F
F
BREAK ROOM
SERVER ROOM
MECH. / ELEC.
115RR
RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALL
OFFICE
CONFERENCE
STOR
JC
(R)
AC
GFI
(R)
+42"
(EL)
AC
GFI
(EL)
AC
GFI
(EL)(R)
(EL) (EL)
(R)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(R)
(EL)
(EL)
(EL)
(R)
(EL)
(R)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL) (EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(EL)
(R)
(EL)
(EL)
(R) UTILITY
METER
HOUSING
(R)(R)(R)
2 2
2 2
2 2
2 2
M
(R) PANEL 'L1A'
(E) 'DS-2A'
(E) 'DS-1A'
(E) BUSSED
GUTTER
(R) (R)
(R)(R)
(R) (R)
(R)(R)
(R)
(R)
(R)
(R) (R)
(R) (R)
(R)
(R)
(R)
(R)
(R)
(R)
(R) (R)
(R)
(R)(R)
(R) (R) (R)
(R)(R)(R)(R)
(R)(R)
(R)(R)(R)
(R) (R)
(R)
(R)
(R)
(R)(R)
(R)
(R)
(R)
(R)
(EL)
(R)
(R)
(EL)
(R)
(R) (R)
(EL)
(EL)
(EL) (EL) (EL) (EL) (EL) (EL) (EL) (EL)
(EL)
(R)
(R)
(EL)
(EL)
(R)(R)
(EL) (EL)
(EL)
(EL)
(R)
(R)
(EL)
(EL)
33 3
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
AE FIRM
PRIME:
OTAK, INC.
REDMOND, WA
SUBCONTRACTOR:
AE DESIGN
DENVER, CO
1/ 8/
:5
8:
P M
A ut od es k D oc s:
//2
4-
N
P S
R O
M O
K aw un ee ch e
V C
D D
-C A w O ta k/
N P
S R
O M
O K
A W
U E
E C
H E
V
IS
IT
O
R C
E N
T E
R
E
LE
C T
R
IC
A L.
rv t
ED101
AE DESIGN
REHABILITATE KAWUNEECHE VISITOR CENTER
ROCKY MOUNTAIN NATIONAL PARK
165639
326235
TW/RS/BJLV
JM/JEB/MS
01/16/2026 121 177
ELEC ENLARGED
DEMOLITION PLAN -
ADMIN WING
ED101
FIRST FLOOR DEMOLITION PLAN - ADMIN WING1
40 84
SCALE OF FEET
SCALE B
TRUE PLAN
KEYNOTE LEGEND
KEY
VALUE KEYNOTE TEXT
1 FIXTURE SHALL BE REMOVED AND TURNED OVER TO THE
CONTRACTING OFFICER.
2 MAINTAIN EXISTING BACKBOX AND CONDUIT IN EXISTING LOCATION
FOR REUSE FOR NEW DEVICE AND PRESERVE FINISH MATERIALS.
REFER TO POWER PLANS FOR ADDITIONAL INFORMATION.
3 CONTRACTOR SHALL REMOVE DUAL GANG BACK BOX AND
REPLACE WITH SINGLE GANG BACK BOX FOR NEW LIGHTING
CONTROLS. CONTRACTOR SHALL PATCH AND FINISH THE WALL
SURFACE TO MATCH ADJACENT CONDITIONS.
4 EC SHALL REMOVE ANY CEILING MOUNTED DEVICE IN THIS
HALLWAY. REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO
POINT OF ORIGIN. ABANDONED WIRING SHALL BE REMOVED.
ABANDONED CONDUIT WILL BE ACCEPTABLE IN WALLS THAT ARE
REMAINING.
DEMOLITION GENERAL NOTES
A. LIGHT FIXTURE NOTED WITH (EL) SHALL MAINTAIN EXISTING LOCATION IN ORDER TO LIMIT
IMPACT TO HISTORIC MATERIALS. LIGHT FIXTURE SHALL BE REMOVED AND REPLACED
WITH NEW. CONDUIT SHALL BE MAINTAINED FOR REUSE WHILE HOUSING SHALL BE
REMOVED. NEW BRANCH CIRCUIT FEEDERS SHALL BE PROVIDED. REFER TO NEW LIGHTING
PLANS.
B. ELECTRICAL DEVICES NOTED WITH (EL) SHALL MAINTAIN EXISTING LOCATION IN ORDER TO
LIMIT IMPACT TO HISTORIC MATERIALS. DEVICE AND FACEPLATE SHALL BE REMOVED AND
REPLACED WITH NEW. BACKBOX, IF PRESENT, AND CONDUIT SHALL BE MAINTAINED FOR
REUSE. NEW BRANCH CIRCUIT FEEDERS SHALL BE PROVIDED. REFER TO NEW POWER
PLANS.
C. ALL DEVICES NOTED WITH (R) SHALL BE REMOVED. REMOVE ASSOCIATED CONDUIT AND
WIRING BACK TO POINT OF ORIGIN. ABANDONED WIRING SHALL BE REMOVED. ABANDONED
CONDUIT WILL BE ACCEPTABLE IN WALLS THAT ARE REMAINING.
D. ALL CEILING MOUNTED SENSORS IN AREAS WHERE CEILING IS BEING DEMOLISHED AND
REPLACED SHALL BE REMOVED. ABANDONED WIRING SHALL BE REMOVED.
UP
D D
WILDERNESS DESK
EXHIBIT NO. 1
EXHIBIT NO. 2
AUDITORIUM
STORAGE
STORAGE
MECH. RM
VEST.
(EL)
(R)
(EL)
(EL)
(R) (R)
(EL)
(EL)
(EL)
(EL)
(EL)(EL)
(EL) (EL)
(EL)
(EL)
(R)
(EL)
(EL)
(E) PANEL 'L2A'
(EL)
(EL)
(EL) (EL)
(EL)
(EL)
CLG
1 1
1 1
(EL)
1 1
(EL)
(EL)
(EL) (EL)
(EL) (EL) (EL)
(EL)(EL)(EL)(EL)
(EL)
(EL) (EL) (EL) (EL)
(EL)
(EL) (EL)
(EL) (EL) (EL)
(EL) (EL) (EL) (EL) (EL) (EL) (R)
(EL)
(EL)
(EL)
(EL)(EL)(EL)(EL)
(EL) (EL) (EL) (EL)
(EL)(EL)(EL)
(…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .